DESCRIPTION AND GUIDE TO OPERATIONS
FKI (BRUSH) VSI 11kV SWITCHGEAR DESCRIPTION AND GUIDE TO OPERATIONS
2
CAUTION! Company Safety Rules must be complied with whilst operating or carrying out work on this equipment Caution notice
3
Definitions The following standard has been adopted in this presentation. A check action is indicated by Red text and by a Red arrow, for example: Open Circuit Breaker Check status of Neons Information is indicated by Blue text and by a Blue arrow, for example: Definitions Circuit is now de-energised
4
INDEX SCREEN Click on the link to move to the required section
General description of the switchgear Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder circuit Procedure to Remove Earth, Restore a Point of Isolation and CLOSE to ON a Feeder circuit Procedure to obtain Test Access to a Feeder circuit
5
GENERAL DESCRIPTION OF THE SWITCHGEAR
6
HORIZONTAL POSITIONING
Brush VSI switchgear is an example of transfer earth equipment in which a movable ‘carriage’ or ‘truck’ containing the oil Circuit Breaker and its associated operating mechanism move horizontally between NORMAL SERVICE, CIRCUIT EARTH and BUSBAR EARTH and vertically between ENGAGED and ISOLATED. This first illustration shows the Circuit Breaker carriage raised (ENGAGED) in the NORMAL SERVICE position
7
HORIZONTAL POSITIONING
Before the carriage can be moved horizontally, it must be lowered (manually ‘racked’ down with a handle) to the ISOLATED position. Interlocks prevent this operation unless the Circuit Breaker is OPEN
8
HORIZONTAL POSITIONING
The FEEDER EARTH position is achieved by pushing the carriage further into its housing, then racking it vertically upward. Again, this operation will only be possible if the Circuit Breaker is OPEN. Once the Circuit Breaker is fully raised, it is possible to CLOSE it and apply feeder (circuit) earth safely
9
FEEDER CIRCUIT BREAKER
This shows a typical unit. Protection relays are grouped on the upper panel, electrical controls and indications on the centre panel. The lower panel, hinged on its left hand side, covers the withdrawable Circuit Breaker on its carriage (truck)
10
CARRIAGE The carriage (truck) comprises the Circuit Breaker, operating mechanism, secondary plug contacts, isolation interlock and carriage interlock
11
CARRIAGE Note the mechanical status semaphore in the centre of the mechanism box
12
CARRIAGE POSITION SELECTOR
Precise positioning of the carriage between the three possible positions of NORMAL SERVICE, BUSBAR EARTH and CIRCUIT EARTH is obtained by moving a selector located on the right hand wall of the carriage housing. Selector movement should only be attempted with the carriage isolated and fully withdrawn
13
CARRIAGE POSITION SELECTOR
The three carriage positions are also marked on the housing floor – in this illustration the side wall has been omitted allowing the NORMAL SERVICE and BUSBAR EARTH positions to be seen. The rear CIRCUIT EARTH position is obscured
14
CARRIAGE The carriage bolt lock secures the carriage in the housing
15
CARRIAGE The isolation interlock prevents racking the Circuit Breaker vertically unless it is in the FREE position and this cannot be selected unless the Circuit Breaker is OPEN (OFF)
16
CARRIAGE The handle socket interlock prevents movement of the carriage interlock to the LOCKED position unless the racking handle is disengaged
17
CARRIAGE The handle socket interlock prevents movement of the carriage interlock to the LOCKED position unless the racking handle is disengaged
18
TRIP BUTTON A mechanical trip button and lockable cover is fitted to the front of the Circuit Breaker mechanism box. The cover will need to be locked when CIRCUIT EARTH is applied
19
ELECTRICAL OPERATION Circuit Breaker electrical TRIP and CLOSE is controlled by a rotary switch located at the lower centre of the middle panel. This control may be locked if required
20
MAIN CONTACTS AND SHUTTERS
The busbar and feeder isolating contacts with their associated safety shutters are located in the roof of the housing
21
MAIN CONTACTS AND SHUTTERS
Shutters are normally opened automatically as the Circuit Breaker carriage is raised to the ENGAGED position. However it is also possible to open them manually. This illustration shows the Feeder (circuit) shutters opened
22
MAIN CONTACTS AND SHUTTERS
It is also possible to lock either shutter closed. However it is critically important to remove the lock from any shutter that is to open automatically, before raising the Circuit Breaker carriage. Failure to observe this requirement will result in damage that is difficult to repair
23
TEST PRODS Test probes (prods) are available and should be used with this type of switchgear. Examine them before use to ensure they are in good condition with no loose components
24
TEST PRODS Test prods are used to make contact with the circuit conductors. Always insert and remove them wearing approved rubber gloves, under safe operational conditions and following the issue of a safety document
25
Operating Instructions FKI VSI Oil Circuit Breaker
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
26
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Ensure that you have selected the correct Circuit Breaker to work on by reference to the nameplate Definitions
27
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Identify the rotary Trip/Close control switch located at the lower centre of the middle panel. Rotate this control anticlockwise to OPEN the Circuit Breaker Definitions
28
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Open the lower panel door and ensure that the Circuit Breaker mechanical semaphore shows OPEN (OFF) Definitions
29
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Identify the isolating mechanism interlock and select it to FREE Definitions
30
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Insert the operating handle and rack the Circuit Breaker anticlockwise downward from the ENGAGED to the ISOLATED position – the red arrow must align with the ISOLATED mark on the right hand support Definitions
31
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Insert the operating handle and rack the Circuit Breaker anticlockwise downward from the ENGAGED to the ISOLATED position – the red arrow must align with the ISOLATED mark on the right hand support Definitions
32
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Remove the operating handle Definitions
33
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Remove the operating handle Definitions
34
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Identify the carriage bolt lock and move it to the FREE position Definitions
35
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Withdraw the carriage completely from the housing Definitions
36
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Withdraw the carriage completely from the housing Definitions
37
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Before proceeding further, ensure that all possible back feeds on the circuit have been removed with Points of Isolation established, Safety locks applied and Caution notices posted as required
38
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Within the housing, identify the busbar shutters and apply a black Safety lock Definitions The Point of Isolation is established
39
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Identify the carriage positioning selector on the right hand side of the housing and move it to the CIRCUIT EARTH position Definitions
40
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Push the carriage back into the housing until it reaches the limit stop – the carriage will now be further into the housing, compared with the previous NORMAL SERVICE position Definitions
41
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Push the carriage back into the housing until it reaches the limit stop – the carriage will now be further into the housing, compared with the previous NORMAL SERVICE position Definitions
42
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Ensure that the arrow on the right hand carriage support lines up with the CIRCUIT EARTH label on the floor of the housing Definitions
43
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Move the carriage bolt lock to the LOCKED position Definitions
44
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Insert the operating handle and rack the Circuit Breaker upward from the ISOLATED to the ENGAGED position. The red arrow must align with the ENGAGED marker on the right hand support Definitions
45
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Insert the operating handle and rack the Circuit Breaker upward from the ISOLATED to the ENGAGED position. The red arrow must align with the ENGAGED marker on the right hand support Definitions
46
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Remove the operating handle Definitions
47
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Remove the operating handle Definitions
48
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Identify the isolating mechanism interlock and select it to LOCKED Definitions
49
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Identify the rotary Trip/Close control switch located at the lower centre of the middle panel. Rotate this control clockwise to CLOSE the Circuit Breaker Definitions
50
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Ensure that the Circuit Breaker semaphore shows CLOSED (ON). Fit a black Safety lock to the trip button cover Circuit Earth is now applied Definitions
51
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Definitions Apply a black Safety lock to the Trip/Close control switch located at the lower centre of the middle panel
52
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Close the lower panel door and post a Caution notice
53
Operating Instructions FKI VSI Oil Circuit Breaker
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
54
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Ensure that you have identified the correct Circuit Breaker. Remove the Caution notice from the lower panel door
55
Procedure to Open to OFF, establish a Point of Isolation and Earth a Feeder Circuit
Ensure that you have identified the correct Circuit Breaker. Remove the Caution notice from the lower panel door
56
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Open the door and remove the black Safety lock Definitions
57
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Open the door and remove the black Safety lock Definitions
58
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Identify the cover over the mechanical trip button on the mechanism box and swing it aside. Press the button to OPEN the Circuit Breaker Definitions Circuit earth is now removed
59
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Close the cover Definitions
60
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Ensure that the mechanical semaphore indicates OPEN (OFF) Definitions
61
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Identify the isolating mechanism interlock and select it to FREE Definitions
62
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Insert the operating handle and rack the Circuit Breaker anticlockwise downward from the ENGAGED to the ISOLATED position Definitions
63
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Insert the operating handle and rack the Circuit Breaker anticlockwise downward from the ENGAGED to the ISOLATED position Definitions
64
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Remove the operating handle Definitions
65
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Remove the operating handle Definitions
66
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Identify the carriage bolt lock and move it to the FREE position Definitions
67
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Pull the carriage fully out of the housing Definitions
68
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Pull the carriage fully out of the housing Definitions
69
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Within the housing, identify the busbar shutters and remove the black Safety lock. This action is critical! Definitions
70
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Within the housing, identify the busbar shutters and remove the black Safety lock. This action is critical! Definitions
71
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Identify the carriage positioning selector on the right hand side of the housing and move it to the SERVICE position Definitions
72
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Insert the carriage into the housing until the NORMAL SERVICE position is reached Definitions
73
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Insert the carriage into the housing until the NORMAL SERVICE position is reached Definitions
74
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Ensure that the arrow on the right hand carriage support lines up with the NORMAL SERVICE label on the floor of the housing Definitions
75
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Move the carriage bolt lock to the LOCKED position Definitions
76
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Insert the operating handle and rack the Circuit Breaker upward from the ISOLATED to the ENGAGED position – the red arrow must align with the ENGAGED mark on the right hand support Definitions
77
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Insert the operating handle and rack the Circuit Breaker upward from the ISOLATED to the ENGAGED position – the red arrow must align with the ENGAGED mark on the right hand support Definitions
78
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Remove the operating handle Definitions
79
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Remove the operating handle Definitions
80
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Identify the isolating mechanism interlock and select it to LOCKED Definitions
81
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Before proceeding to CLOSE the Circuit Breaker to ON, ensure that any circuit earths that have been applied on the remote end(s) of the circuit have been removed and that operational conditions on the network are satisfactory for a restoration of supply Definitions
82
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Identify the rotary Trip/Close control switch located at the lower centre of the middle panel. Remove the black Safety lock Definitions
83
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Identify the rotary Trip/Close control switch located at the lower centre of the middle panel. Remove the black Safety lock Definitions
84
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Rotate this control clockwise to CLOSE the Circuit Breaker Definitions
85
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Ensure that the Circuit Breaker semaphore shows CLOSED (ON) The circuit is now energised (LIVE) Definitions
86
Procedure to Remove Earth, Restore a Point of Isolation and Close to On a Feeder circuit
Close and secure the lower panel door Definitions
87
Operating Instructions FKI VSI Oil Circuit Breaker
Procedure to obtain Test Access to a Feeder circuit
88
Procedure to obtain Test Access to a Feeder circuit
This procedure must be carried out after the Feeder has been EARTHED and will require issue of a safety document (Sanction for Test). It commences with the Circuit Breaker in the CIRCUIT EARTH position Definitions
89
Procedure to obtain Test Access to a Feeder circuit
Ensure that you have identified the correct Circuit Breaker, which should have a Caution notice posted Definitions
90
Procedure to obtain Test Access to a Feeder circuit
Open the lower panel door and remove the black Safety lock from the mechanical trip button Definitions
91
Procedure to obtain Test Access to a Feeder circuit
Open the lower panel door and remove the black Safety lock from the mechanical trip button Definitions
92
Procedure to obtain Test Access to a Feeder circuit
Identify the cover over the mechanical trip button on the mechanism box and swing it aside. Press the button to OPEN the Circuit Breaker Definitions Circuit earth is now removed
93
Procedure to obtain Test Access to a Feeder circuit
Close the cover Definitions
94
Procedure to obtain Test Access to a Feeder circuit
Ensure that the mechanical semaphore indicates OPEN (OFF) Definitions
95
Procedure to obtain Test Access to a Feeder circuit
Identify the isolating mechanism interlock and select it to FREE Definitions
96
Procedure to obtain Test Access to a Feeder circuit
Insert the operating handle and rack the Circuit Breaker anticlockwise downward from the ENGAGED to the ISOLATED position Definitions
97
Procedure to obtain Test Access to a Feeder circuit
Insert the operating handle and rack the Circuit Breaker anticlockwise downward from the ENGAGED to the ISOLATED position Definitions
98
Procedure to obtain Test Access to a Feeder circuit
Remove the operating handle Definitions
99
Procedure to obtain Test Access to a Feeder circuit
Remove the operating handle Definitions
100
Procedure to obtain Test Access to a Feeder circuit
Identify the carriage bolt lock and move it to the FREE position Definitions
101
Procedure to obtain Test Access to a Feeder circuit
Pull the carriage fully out of the housing Definitions
102
Procedure to obtain Test Access to a Feeder circuit
Pull the carriage fully out of the housing Definitions
103
Procedure to obtain Test Access to a Feeder circuit
Within the housing, check that the busbar shutters are Safety locked. Identify the circuit shutters, painted yellow and open them Definitions
104
Procedure to obtain Test Access to a Feeder circuit
Test that the contacts are DEAD using an approved voltage testing device, which must itself be tested both before and after use Definitions
105
Procedure to obtain Test Access to a Feeder circuit
Test that the contacts are DEAD using an approved voltage testing device, which must itself be tested both before and after use Definitions
106
Procedure to obtain Test Access to a Feeder circuit
Test that the contacts are DEAD using an approved voltage testing device, which must itself be tested both before and after use Definitions
107
Procedure to obtain Test Access to a Feeder circuit
Test probes (prods) are stored in a wooden case inside the substation. Examine them before use to ensure they are in good condition with no loose components
108
Procedure to obtain Test Access to a Feeder circuit
Insert the test probes Definitions Circuit testing may now proceed, wearing approved rubber gloves and following approved procedures
109
Procedure to obtain Test Access to a Feeder circuit
On completion of testing, remove the test prods and return them to storage. If it is required to RESTORE CIRCUIT EARTH or to RESTORE to ON, follow the procedures specified elsewhere in this presentation. If RESTORING to ON, first remove the Caution notice from the lower panel door, then ensure that operational conditions on the circuit are safe to allow energizing, including the removal of any additional earths that may have been applied Definitions