San Luis Potosi – New plant April 24th 2015
HOME San Luis Potosi – New plant April 24th 2015 ORGANIZATION CHART
3
ORGANIZATION CHART ING. GILBERTO BERLANGA GALLARDO GENERAL MANAGER
HOME ORGANIZATION CHART ING. GILBERTO BERLANGA GALLARDO GENERAL MANAGER ING JOSE GULLEN SAFETY GUARD ING. GILBERTO BERLANGA MORENO OPERATIVE MANAGER CARLOS SOMERA ENGINEERING DPTM. COORD SAFETY SITE CAPTAIN SSOE ENGINEERING DESIGN ENRIQUE ALVARADO PROJECT MANAGER STAFF SAFETY STAFF CATALINA RAMIREZ PURCHASING JORGE FIERROS JOB CAPTAIN STAFF OPERATIVE SITE STAFF MASTER DOT DOCUMENT CONTROL SURVEYOR STAFF CIVIL SUPERVISOR(S) EARTHWORKS SUPERVISOR METAL FRAME SUPERVISOR ELECTRICAL SUPERVISOR FPS SUPERVISOR MECHANICAL SUPERVISOR