Presentation is loading. Please wait.

Presentation is loading. Please wait.

China MM-Wave (CMMW) Study Group May 2012 Closing Report

Similar presentations


Presentation on theme: "China MM-Wave (CMMW) Study Group May 2012 Closing Report"— Presentation transcript:

1 China MM-Wave (CMMW) Study Group May 2012 Closing Report
April 2007 doc.: IEEE /0570r0 May 2012 China MM-Wave (CMMW) Study Group May 2012 Closing Report Date: Authors: Eldad Perahia, Xiaoming Peng Eldad Perahia, Intel Corporation

2 Eldad Perahia, Xiaoming Peng
May 2012 Abstract This document is the closing report for CMMW SG for the May 2012 session. Eldad Perahia, Xiaoming Peng

3 Eldad Perahia, Xiaoming Peng
May 2012 Work Completed (1/2) Feedback from CWPAN Overview of CPWAN SG5 QLINKPAN Update on 45 GHz spectrum Introduction of CMMW PAR and 5C at mid-week plenary Eldad Perahia, Xiaoming Peng

4 Eldad Perahia, Xiaoming Peng
May 2012 Work Completed (2/2) PAR development 5 Criteria development Task group logistic discussion PAR and 5 C’s approved by study group Eldad Perahia, Xiaoming Peng

5 Task Group Logistics (1/2)
May 2012 Task Group Logistics (1/2) Guiding principles A good standard that meets the needs of all stakeholders All stakeholders have the ability to participate on a regular basis Leverage opportunity to integrate new participants into process chair grants voting rights to designated list of CWPAN members Maximum of 30 CWPAN needs to provide list of names at July meeting Criteria Active participation in CWPAN SG5 or PG4 Intent to participate in plenary meetings Must attend inaugural meeting to receive voting rights Voting rights are maintained based existing rules for attendance and voting Eldad Perahia, Xiaoming Peng

6 Task Group Logistics (2/2)
May 2012 Task Group Logistics (2/2) CMMW TG meetings held in Asia will be conducted as interim Voting allowed Limit agenda to CMMW TG related topics Not overlapping with normal interim Co-located with interim when in Asia Opening and closing plenary run by officers Official language will be English Cannot get attendance credit for two interims between two plenary meetings WG approval and meeting notification requirement are honored Every plenary session to have at least one CMMW TG session Eldad Perahia, Xiaoming Peng

7 Planned IEEE 802 / CMMW TG meeting schedule (1/2)
May 2012 Planned IEEE 802 / CMMW TG meeting schedule (1/2) Date Meeting Venue Plenary/Interim May 13-18, 2012 Atlanta, USA Interim July 15-20, 2012 San Diego, CA, USA Plenary Sept 16-21, 2012 Indian Wells, CA, USA Sept 24-28, 2012 Beijing, China CMMW TG/CWPAN Nov 11-16, 2012 San Antonio TX, USA Jan 13-18, 2013 USA Jan 21-25, 2013 China March 17-22, 2013 Orlando, Florida, USA May 12-17, 2013 Big Island, Hawaii, USA April 22-26, 2013 July 14-19, 2013 TBD Sept 15-20, 2013 Nanjing China CMMW TG/CWPAN (Co-location) Nov 10-15, 2013 Dallax TX, USA Eldad Perahia, Xiaoming Peng

8 Planned IEEE 802 / CMMW TG meeting schedule (2/2)
May 2012 Planned IEEE 802 / CMMW TG meeting schedule (2/2) Date Meeting Venue Plenary/Interim Jan 13-18, 2014 Los Angeles, CA, USA Interim Jan 6-10, 2014 China (TBD) CMMW TG/CWPAN March 16-21, 2014 Atlanta, USA Plenary May 12-17, 2014 Hawaii, USA May 20-24, 2014 China July 13-18, 2014 San Diego California, USA Sept 15-20, 2014 TBD (non USA) Sept 23-27, 2014 (TBD) Nov 10-15, 2014 San Antonio Texas USA CMMW TG on Wed-Thursday CWPAN on Mon, Tues and Friday Eldad Perahia, Xiaoming Peng

9 Eldad Perahia, Xiaoming Peng
May 2012 PAR Motion Believing that the PAR content contained in the document referenced below meets IEEE-SA guidelines, Request that the PAR content contained in /0140r5 be posted to the IEEE 802 Executive Committee (EC) agenda for WG 802 preview and EC approval to submit to NesCom. [Moved by Xiaoming Peng on behalf of CMMW SG CMMW SG vote: Moved: <Jon Rosdahl>, Seconded: <Andrew Myles>, Result: ] Eldad Perahia, Xiaoming Peng

10 Eldad Perahia, Xiaoming Peng
May 2012 5 Criteria Motion Believing that the Five Criteria contained in the document referenced below meets IEEE 802 guidelines, Request that the Five Criteria contained in /0141r4 be posted to the IEEE 802 Executive Committee (EC) agenda for WG 802 preview and EC approval. [Moved by Xiaoming Peng on behalf of CMMW SG CMMW SG vote: Moved: <Bruce Kraemer>, Seconded: <Andrew Myles>, Result: ] Eldad Perahia, Xiaoming Peng

11 Eldad Perahia, Xiaoming Peng
May 2012 Goals for July Complete Task Group guidelines Complete PAR and 5 Criteria TG, WG, EC approval of PAR and 5 Criteria Eldad Perahia, Xiaoming Peng

12 Eldad Perahia, Xiaoming Peng
May 2012 Conference call times Thursdays 19:00-20:00 ET May 31, July 12 Eldad Perahia, Xiaoming Peng


Download ppt "China MM-Wave (CMMW) Study Group May 2012 Closing Report"

Similar presentations


Ads by Google