BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi

Similar presentations


Presentation on theme: "BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi"— Presentation transcript:

1

2 BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
LIU – BE/RF Management Team Meeting 31st May 2016

3 Outline Summary of Contributions from IS Section Main Specifications
Resources Implementation Plan Present Status PLAN Overview Conclusions BE/RF-IS Contribution to LIU C. Rossi 31st May 2016

4 Summary of Contributions from IS Section
PSB Finemet RF System 10 MHz Upgrade Increase Fast Feedback Gain in 40/80 MHz Systems Fast Ferrite Tuner for the 80 MHz cavities: Working Prototype, in progress Operational Device, waiting the outcomes of prototype testing PS Kicker System BE/RF-IS Contribution to LIU C. Rossi 31st May 2016

5 Main Specifications PSB Finemet® RF System
Beam intensity increase to 1.4∙1013 protons (present value is 1∙1013) ultimate goal 2.5∙1013; Energy increase to 2 GeV. Strategy Strategy Replace the C02, C04 and C16 systems with identical Finemet® cavities, 36 gaps per ring; Adopt solid state modular amplifiers; Upgrade controls and interlocks.

6 Main Specifications 10 MHz Upgrade
From 1.3∙1011 ppb to >2.0∙1011 ppb with 25 ns spacing with Linac4 C11 Standard amp Upgraded amp Reduction of the cavity impedance as seen by the beam by a factor 2 Increase the fast feedback gain of the Final amplifier in a uniform and reproducible way for the whole set of amplifiers. Strategy New Final amplifier components; Implement a modular architecture (to reduce repair time); New amplifier ancillaries (power supplies, RF driver amplifier, L-Bias control) required; New PLC-based interlock system.

7 Main Specifications 40/80 MHz RF Feedback Increase
Improve the beam longitudinal stability by reducing the cavity equivalent impedance. The present wide-band feedback is limited at 43 dB gain by the group delay between the feedback amplifiers and the cavity. Find options to reduce the cable length. Strategy Study the system stability with increased wide-band feedback, based on measurements of the present system; Estimate the feasibility and impact of the upgrade; Evaluate costs and benefits. BE/RF-IS Contribution to LIU C. Rossi 31st May 2016

8 Main Specifications 80 MHz Fast Ferrite Tuner
Provide the possibility to operate the same 80 MHz cavity with p and ions in the same supercycle. p frequency is MHz and Pb frequency is MHz; A tuning range of 230 kHz is needed. Strategy S21 from simulated measurement ports Install a tuner prototype in the PS during EYETS 2016; Validate design and power consumption; Install 3 fast tuners during LS2.

9 Main Specifications Longitudinal kicker system
Dump coupled-bunch instability in multi-harmonic mode. Parameter Comment Frequency range 0.4…5.1 MHz RF voltage ~ 5 – 6 kV To be confirmed this year, all modes simultaneously Residual impedance as seen by the beam < 50 W at each frev line ~ half of impedance of a 10 MHz accelerating cavity Impedance reduction when not in use Gap relays 4 out of 6 gaps operational in 2015 and 5 out of 6 during the 2016 Run. Strategy Install a kicker prototype in the PS during LS1 to prove the principle; Develop and upgrade it until LS2.

10 Resources Staff directly declared for LIU in APT.
The LIU-PSB Manpower in more detail.

11 Resources Total Budget requested for LIU in IS.
Details of the LIU-PS Budget. Details of the LIU-PSB Budget. ACTIVITIES 2016 2017 2018 2019 2020 10 MHz Upgrade 80 630 1250 650 40/80 MHz Feedback Upgrade 20 130 200 350 80 MHz Fast Tuner 40 220 PS Longitudinal Kicker 50 393 300 LIU-PS 190 1373 1950 1200

12 Finemet® Implementation Plan
Finemet cores procurement (340 Units) 132 Cores as KEK in kind contribution: delivery March 2017 210 Cores purchase: MS completed : no European supplier. IT being dispatched : closing by end of June To be presented at FC of September Delivery by June 2017 RF Power Amplifiers (180 Units) MS completed IT being dispatched : closing by end of June To be presented at FC of September Delivery by end 2017 Ancillary Electronics Design and construction documentation completed Production started Staged delivery until end 2017 DC Power Supplies (164 Units) MS completed IT being dispatched : closing by end of June To be presented at FC of September Delivery by end 2017 Cavity Mechanics Design and construction documentation completed Production starting 2nd half 2016 Staged delivery during 2017 Integration, cabling, cooling est. Cables requested Cooling needs defined Integration in process

13 LIU-PS Implementation Plan
10 MHz System Upgrade No major purchase expected Consolidation of HV power supplies (1971) Can be managed in the section with EPC support. Water cooling and power required in test stand at building 359 during part of LS2 Water cooling and power required in the PS as from January 202 80 MHz Fast Tuner Relevant test on one 80 MHz system during EYETS Some design required for the final RF feedthrough 6 months delivery expected for the ceramics of the RF feedthrough Solenoid delivery unknown, for the moment Rest of components can be off the shelf PS Kicker System Design a new shielding for the amplifiers Implement new solid state amplifiers (PSB design) Review the present cabling and patch panel 40/80 MHz Fast Feedback Upgrade The study must demonstrate the advantage of implementing this upgrade A new feedback architecture has to be defined New driving amplifiers, probably BE/RF-IS Contribution to LIU C. Rossi 31st May 2016

14 Implementation Plan Finemet Activities LIU-PS Activities

15 Status of Contributions from IS Section
PSB Finemet RF System One system tested (10 gaps) with all operational beams and all harmonics, IT being sent for all critical components 10 MHz Upgrade Prototype system tested with all operational beams 40/80 MHz Fast Feedback Upgrade Some preliminary measurements performed, no decision yet Fast Ferrite Tuner for the 80 MHz cavities Prototype device tested at low level on an 88 MHz cavity PS Kicker System Advanced prototype successfully tested with different beam conditions BE/RF-IS Contribution to LIU C. Rossi 31st May 2016

16 PLAN Overview The 40/80 MHz Feedback Upgrade is the only activity that has not been declared into PLAN, because of the uncertainty still pending on its feasibility. BE/RF-IS Contribution to LIU C. Rossi 31st May 2016

17 Conclusions The main IS contributions to LIU (PSB Finemet, 10 MHz Upgrade, PS Kicker) are well on their way. The feasibility of the 80 MHz Fast Tuner and of the 40/80 MHz Feedback Upgrade is still under investigation; costs and benefits will need to be considered as soon as the technical frame has been clarified. A correct implementation of the IS contribution requires the availability of the infrastructure and support at due time. PSB PS