Download presentation
Presentation is loading. Please wait.
Published byMelvin Holland Modified over 6 years ago
1
Drilling and sampling in foundation engineering
Part 72-B1 Drilling and sampling in foundation engineering VIII/2014, modified XII/2016 (Part 72, PP 2007, animation+p/r: compr. Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited. ready
2
Remarks to note during drilling
A record of the driller’s observations on progress of drilling, rate of penetration, speed and uniformity of rotation of bit, action of the drill rig such as jerky, smooth, rough, steady etc. Length of each core run and the length, percentage or both of core recovered along with location and cause of core loss (core drilling only). Any changes in the character of the drilling water or mud, and in case the drilling water disappears, the elevation or depth where this happened. The driller’s interpretation and description of the nature of the formation(s) encountered in the drilling. Location and nature of cavities, seams, cracks, whether filled or open, soft or fractured rock and any other relevant information in connection with the purpose of the exploratory drilling. press press ready press press
3
press ready
4
press ready “Tube-à-manchettes” multi-stage grouting method: casing for drilling = grouting pipe
5
“Tube-à-manchettes” multi-stage grouting method with casing for drilling
press press ready 5 press 5
6
press ready “Tube-à-manchettes” multi-stage grouting method with separate casing for drilling 6 6
7
press ready “Tube-à-manchettes” multi-stage grouting method with separate casing for drilling 7 7
8
Drilled casings of “tube-à-manchettes” type Robit
press ready Drilling for forepoling (= spiling = roofing) with Top Hammer press
9
Self-drilling rods Titan
Jet-grouting Soilmec press ready Drilling for forepoling (= spiling = roofing) with Top Hammer – cont.
10
Drilling for forepoling with Top Hammer – system Minova KBS
press ready
11
Drilling for forepoling with Top Hammer (cont
Drilling for forepoling with Top Hammer (cont.) – system Minova KBS = “cousin” to ODEX G2 and TUBEX press ready
12
Drilling for forepoling with Top Hammer – system ALWAG AT - Casing System = next “cousin” to ODEX G2 and TUBEX press ready
13
press ready
14
press ready
15
System ALWAG AT - Casing System: optionally targets
ready
16
“Tube-à-manchettes” multi-stage grouting method with steel casing for drilling
Recommended ready
17
ready
18
ready
19
press press ready
20
press ready
21
Thank You for Your attention!
THE END of Part 72-B1 Thank You for Your attention! ready
22
Welcome to www.najder.se
ready
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.