Course: SAP Compatible Units for Project Assistants
Video Demos
2
Module 2: SAP CUs Training
3
Lesson 2.1: The Business Process: Quote Acceptance to Final Material List
4
Section 2.1.1: Business Process: Quote Acceptance to Final Material List
5
2.1.1.1: From Quote Acceptance to PMT Task
CRM (ExperLogixs) Estimate Time & Materials 1st SAP Order with CM# Quote Created 2nd SAP Order with CM# 3rd Final Released SAP Order with CM# and CUs Quote Accepted
6
2.1.1.2: Design Validation PMT Task to PA – Assigned
PA Generates PDF CU Structure List PA makes changes in SAP PMT Task Complete Designer Tasks PA to make Changes to the Order Designer Validation Changes Required No Changes PMT Task to PA – Final Material List PA Generates PDF Material List from SAP PMT Task Complete
7
Section 2.1.2: Starting the Process—Receiving a Task from PMT
8
Graphic of My Work screen in WPA
: My Work – Task View Media Description: Graphic of My Work screen in WPA
9
2.1.2.2: Step 2 - Project Center View
Media Description: Graphic of Project lists & opened project (animated) Media Description: Graphic of Project Center in PWA View expanded
10
2.1.2.3: Step 3 - Project Details
11
2.1.2.4: Using the MS SharePoint Document Library
Media Description: Graphic of MS SharePoint Document Library attached to the example project.
12
Section 2.1.3: New Terms – Construction Measure (CM) and Compatible Unit (CU) Orders
13
2.1.3.1: Construction Measure (CM)
Like an OID# Matches the Request# Matches the Quote# Matches the Project# Matches the Task# MS SharePoint Document# Referenced in the SAP Order as CM#
14
2.1.3.2: Fortis CU Order Example
Media Description: Is there an example of a work order or is it conceptual?
15
Section 2.1.4: An Introduction to Compatible Units
16
2.1.4.1: What is a Compatible Unit? – IKEA Example
17
2.1.4.2: Fortis CU Minors Example
SS23725
18
2.1.4.3: Fortis CU Majors Example
SS25933 SS23725 SS26105 SS28526
19
Section 2.1.5: What are the Advantages of Using CUs?
20
2.1.5.1: List of Business Benefits
Provides standard estimating elements with material and labour costs Enforces standard design and reduces errors Work orders are created automatically and are easier to use Improved Supply Chain Management Allows for as-designed vs. as-built comparisons
21
Section 2.1.6: SAP - CU Structure List
22
2.1.6.1: Initial CU Structure List
Media Description: Graphic of CU Structure List from SAP CU Order report PDF / markups
23
2.1.6.2: Marked-UP CU Structure List
Media Description: Marked up CU Material List
24
Section 2.1.7: SAP- Material List
25
Graphic of material list PDF
: SAP– Material List Media Description: Graphic of material list PDF
26
Business Process Flows
: Re-Cap Business Process Flows Importance of the Construction Measure Reference# Compatible Units in SAP and their Advantages Cu Structure Lists for Change Requests CU Structure Lists for Final Build Questions ?
27
: Summary
28
Lesson 2.2: Printing the CU Structure List
29
Section 2.2.1: Retrieve PMT Project Details
30
2.2.1.1: Navigate the PMT Dashboard
31
: Selecting a Task
32
Section 2.2.2: Managing Project Lists in PMT Project Centre
33
2.2.2.1: Listing the Projects in PMT
Media Description: Capture of dashboard link & Project listing page
34
2.2.2.2: Using Custom Filters to Locate the Project by the Project#
Media Description: Screen shot of custom filter example Media Description: Screen shot of custom filter example
35
: Project Details
36
Section 2.2.3: Find the SAP CU Order(s) Using the CM#
37
2.2.3.1: Search by CM# for the Released CU Order
Some large projects may have multiple orders released to the same CM#
38
2.2.3.2: SAP Transaction ZM08n for Reporting
Media Description: Screen capture of ZM08N - dropdown Media Description: Screen capture of ZM08N
39
Section 2.2.4: Printing a CU Structure List
40
2.2.4.1: Printing the CU Structure List
Media Description: Screen shot Media Description: Screen shot Media Description: Screen shot of executed ZM08n tcode
41
Note the Reference# from the PMT task. Open the Project Centre...
: Practice Note the Reference# from the PMT task. Open the Project Centre... Verify the Order Basic Start Date... Print the CU Structure List...
42
Section 2.2.5: Printing and Saving a CU Structure List
43
2.2.5.1: Saving the PDF of the CU Structure List
44
2.2.5.2: Saving the PDF as a Local File
Media Description: Save as browse window in SAP
45
Section 2.2.6: SharePoint Naming Conventions
46
2.2.6.1: Naming Conventions for MS SharePoint Files
Reference Number then a space If multiple released superior orders then “Order order#” then a space examples: CU Structure List Material List Order CU Structure List Order Material List Type = PMT File Structure = Design/Build
47
Section 2.2.7: Using the MS SharePoint Document Library
48
2.2.7.1: Access the MS SharePoint Document Library
49
2.2.7.2: Upload a CU Structure List to MS SharePoint
Media Description: Screen shot SharePoint Library...
50
2.2.7.3: SharePoint File Properties
Media Description: Screen shot meta data
51
Section 2.2.8: Set PMT Task to Complete
52
2.2.8.1: Set PMT Task to Complete
53
Using the PMT Task Reference# to find the Project
: Re-Cap Using the PMT Task Reference# to find the Project Finding the SAP order with IW38 Saving PDFs from SAP ZM08N following SharePoint naming conventions Uploading to the MS SharePoint Document Library Setting the PMT Task Complete Questions ?
54
: Summary
55
Lesson 2.3: Preparing to Use CU Orders
56
Section 2.3.1: Navigating the Header of a CU Order
57
: CS Orders
58
2.3.1.2: Navigating a CU Order Header Tab
59
Note the header fields that are CU Order unique
: Practice IW33; Display Order Note the header fields that are CU Order unique Note the CU Tab, note the CM# Note the Operations and Component tab
60
Section 2.3.2: Navigating the Compatible Units Tab on a CU Order
61
2.3.2.1: Navigate to the Comp. Unit Tab on the Order
62
Section 2.3.3: Searching CUs in Maintain Mode
63
2.3.3.1: Listing all CUs in Maintain Mode
64
: Listing of CUs
65
Open the CU Order provided. Select the Comp. Unit tab.
: Practice Open the CU Order provided. Select the Comp. Unit tab. Click to activate maintain mode. List all of the CUs by clicking without applying any filters. Browse through the list.
66
: Searching CUs
67
Search CUs by ID or description;
: Practice Return to Filter mode Search CUs by ID or description; a) Search by CU ID (p*, t*,s*, ss*,c*) or (*26602, *25931, *21003). Search by Description (*haddock*). Click to Exit Maintain mode.
68
Section 2.3.4: Navigating the Operations Tab
69
2.3.4.1: Navigating the Operations Tab
70
Section 2.3.5: Navigating the Component Tab
71
2.3.5.1: CU Order Component Tab
72
: Component Details
73
Section 2.3.6: Processes in Completing Change Requests
74
2.3.6.1: Steps to Make Required Changes in SAP Orders
PMT; Project# from Task Note the Project Number in the PMT Task In Project Centre Open Project Centre and create custom filter to search by the Project Number# Open the Project, note the details and required changes In SharePoint Document Library Open the MS SharePoint Documents Library link Open the CU Structure List PDF to see any mark-ups In SAP TCODE IW38; search by the Project Number (CM#) to locate and edit the appropriate released CU Order. Make required changes and Save Print the PDFs in ZM08N and save in your H drive Upload into the MS SharePoint Documents Library Set the PMT task to complete PMT; Project Centre SharePoint Document Library SAP IW38 List SAP Order(s) Make Changes SAP ZM08n Save PDFs SharePoint Upload PDFs PMT; Task Complete
75
Section 2.3.7: Changing the Order Basic Start and Finish Dates
76
2.3.7.1: Change the Material Requirement Date
Media Description: Screen capture from CM Project and SAP Order header Media Description: Screen capture from CM Project and SAP Order header Media Description: Screen capture from CM Project and SAP Order header
77
2.3.7.2: Component Details Media Description:
Screen capture from CM Project and SAP Order header Media Description: Shot of component details Media Description: Shot of component details
78
Non-Stock items are not are not affected
: Material Date Logic DSL; Offset = -4 Reservation Date will be -4 working days offset from the CU Order Basic Start Date (Material required date) for picking Acheson; Offset = -9 Reservation Date will be -5 working days offset from the CU Order Basic Start Date (Material required date) for shipping and -4 working days offset for picking (Total = -9 working days offset) Non-Stock items are not are not affected
79
Open the PMT Task and Note the Project#. Open the PMT Project Centre:
: Practice Open the PMT Task and Note the Project#. Open the PMT Project Centre: Create a Custom; Filter > Custom > Project name contains Project#. Open the Project and note the Material requirement by date and the SAP Order number. Change the SAP Order: Use SAP IW38 to Search for the associated released order(s) by the CM# in the Construction Measure# field. Open and edit the appropriate Order. Change the Basic Start and Basic dates and Save. In PMT, set the task complete.
80
What has changed on a CS Order What is new with CU and RU Orders
: Re-Cap What has changed on a CS Order What is new with CU and RU Orders Searching CUs CUs add Operations (Labour) and Components Changing Order Basic Start dates Questions ?
81
: Summary
82
Lesson 2.4: Adding and Deleting Items on Structure List
83
Section 2.4.1: Add Miscellaneous Materials to a CU Order
84
2.4.1.1: Adding Materials against the Miscellaneous Operation
Media Description: Shot of operation selected screen
85
Section 2.4.2: Adding and Deleting CUs from a CU Order
86
2.4.2.1: Deleting Major CUs from the Order
87
2.4.2.2: Deleting Major CUs from the Order
88
2.4.2.3: Adding back the Minors
89
Delete a Major CU on a CU Order... Save and Exit the Order.
: Practice Delete a Major CU on a CU Order... Save and Exit the Order. Add Minor CU back into the CU Order... Move the CU as required into the appropriate structure. Repeat for the other minor CUs required. Back out of maintain mode . Copy the CM# to use in saving the PDFs later. Save and Exit the order. Update the CU Structure List and Material List... Save as; H:\CM# (paste) CU Structure List or H:\CM#(paste) Material List. Upload into the Project’s MS SharePoint Documents Library. In PMT, set the task complete.
90
Section 2.4.3: Update the CU Structure List and the Final Material List
91
2.4.3.1: SAP ZM08n; Report for Components
92
2.4.3.2: SAP ZM08n; Material List Transaction
93
2. 4.3.3: SAP ZM08n; Generate the PDF files
94
2. 4.3.4: Upload to MS SharePoint Document Library
95
From a PMT Task, note the Reference#.
: Practice From a PMT Task, note the Reference#. In Project Centre, create the custom filter where Project name contains the Reference#. Using ZM08n, locate the appropriate SAP CU Order by the Construction Measure field = the Reference# Click to generate the Material List Click to generate the Exception Report Click the SAP Printer button to get a hard copy Click the Generate PDF file button Save As; H:\CM#(paste) Material List Upload in the MS SharePoint Documents Library Set the Type to PMT Set the File Structure to Design/Build Set the PMT Task to complete
96
Section 2.4.4: Adding Multiple CUs to a CU Order
97
: Adding Multiple CUs
98
Select the Comp. Unit tab. Expand the Hierarchy.
: Practice Select the Comp. Unit tab. Expand the Hierarchy. Click the Maintain button. Search by CU ID (p*, t*,s*,c*, ss*,*26602, *25931, *21003) or Description (1ph pad*100kva*) Click to display the “hit list” Select the row desired (note X means it is a major CU) Type the quantity desired into the CU Quantity field and [Enter] to update Click the Transfer CU button Move the CUs as required into the appropriate structure by dragging the CU icon on the left Hierarchy panel. Back out of maintain mode. Save the Order
99
Section 2.4.5: Copying CUs in an Order
100
2.4.5.1: Copying CUs in an Order
101
Select the Comp. Unit tab. Click the Maintain button.
: Practice Select the Comp. Unit tab. Click the Maintain button. Click the Copy button, this puts you in copy mode. Drag the item on the left panel that you wish to copy to the location desired. Click the Move button to get out of copy mode. Click to exit maintain mode
102
Section 2.4.6: Changing Linear CUs
103
2.4.6.1: Identification of Linear CUs
104
Select the Comp. Unit tab.
: Practice Select the Comp. Unit tab. Expand the Hierarchy on the left panel with the triangle icon. Click the Maintain button. Search by CU ID – example; or C* Click check to display. Select the row desired Click Transfer CU. Change the Execution Factor to the service length required. Click the checkmark to exit Maintain mode. Save the Order.
105
Section 2.4.7: Listing all Orders Related to a CM#
106
2.4.7.1: Searching all Related Orders by Construction Measure
107
: Project Orders
108
: Summary
109
Lesson 2.5: Manually Creating CU Orders
110
Section 2.5.1: Adding Materials After the Material Requirement Date has Past
111
2.5.1.1: Determine if Material Requirement Date is in the Past
112
2.5.1.2: Creating the SAP CU21 Sub-Order
113
Check if the Material Requirement Date is in the past...
: Practice Check if the Material Requirement Date is in the past... Set the Fields required at Order Creation... Copy the CM# from Superior Order Comp. Units tab to the Sub Order Comp. Units tab. Release the order via menu path Order > Change... Save.
114
Section 2.5.2: G Electric Orders
115
2.5.2.1: G Electric Orders Changes
The only Change in the Estimation Procedures is a radio button. Select the Estimate radio button and click the OK button. Note the Order number of the superior and the new Order number you created.
116
2.5.2.2: G-Electric Order Navigation and Editing
117
2.5.2.3: G-Electric Order CU Tab Listing Minors
118
IW33; Open the G-Electric Order provided.
: Practice IW33; Open the G-Electric Order provided. Note the User Status is GELC. Click the Comp. Unit tab and note how they are all Minor CUs. Delete a Minor CU. Open the Superior Order from the Header tab. Delete all CUs from Superior Order
119
Section 2.5.3: Manually Creating CU Orders
120
2.5.3.1: Manually Create a CU Order
121
2.5.3.2: CU Order Header Details
122
: Compatible Unit Tab
123
Specify the Order Type as CU20 for Superior Orders.
: Practice Specify the Order Type as CU20 for Superior Orders. Set the Priority to Routine. Set the Planning plant to 4125 (as an example). The User Status needs to be changed to QACC. Set the Planner Grp to PJS. Set the appropriate PM Activity Type (Small, Medium, or Large) Set the Main wk ctr to 02_OPS (as an example). Basic Start/Basic Finish are required. Select the Partner tab; set the Certifier = BLehman. Select the Additional Data tab; set the WBS Element. Set the settlement rule to the same WBS element. Release the Order.
124
Section 2.5.4: Creating Virtual CUs for Structure
125
2.5.4.1: Creating Virtual CU Structures
Media Description: Slide showing CU Tab and virtual CU options Media Description: Slide showing CU Tab and virtual CU options
126
2.5.4.2: Virtual CU Structure Standards
127
: Operation View
128
Click the Maintain button Click the Virtual CU button
: Practice Click the Comp. Unit tab Click the Maintain button Click the Virtual CU button Change the text of the virtual CU to OPT 1 Add the other Virtual CUs (SERV 1, STR 0, STR 1, STR 2 and STR 3) Click the back arrow to exit Maintain mode Go back into Maintain mode and try to move a structure.
129
Section 2.5.5: Adding and Moving CUs into the Structure
130
2.5.5.1: Adding and Moving CUs into the Structure
131
: Operation View
132
: Component View
133
Click the Maintain button. List all CUs.
: Practice Click the Comp. Unit tab. Click the Maintain button. List all CUs. Select a CU and change the quantity to 4 and [Enter]. Select the row and click Transfer CU. Move 3 of the CUs into different structures. Exit Maintain mode. Go back into Maintain mode. Try to move the fourth CU you added.
134
Section 2.5.6: Copying CUs into the Virtual CU Structure
135
2.5.6.1: Copying CUs into the Structure
136
Select the Comp. Unit tab. Select the Maintain button.
: Practice Select the Comp. Unit tab. Select the Maintain button. Select the copy button. Drag a CU from one structure into the top row. Note the duplicate. Drag a structure to the top row. Note the entire structure is duplicated. Click the Move button. Move one of the copied items. Exit Maintain mode.
137
Manually Creating CU Orders including Virtual CUs
: Re-cap Creating Sub-Orders to Capture Costs after the material requirement date has past G-Electric Orders Manually Creating CU Orders including Virtual CUs Moving and Copying CUs Questions ?
138
: Summary
139
2.5.6.5: Tasks and Actions Required
Request PA to update SAP Material Required Dates and Run CU Structure List Reference# and Material Req. Date from PMT SAP IW38; Check Order Basic Start date, adjust as required ZM08n reports and upload to SharePoint PA to update SAP with materials and dates SharePoint – Print CU Structure List mark-ups SAP IW38; adjust as required SAP ZM08n reports and upload to SharePoint Request Final SAP update with material required and delivery dates and G-dump (if required)