Presentation is loading. Please wait.

Presentation is loading. Please wait.

One Pass Pricing (OPP) SEPRT 12

Similar presentations


Presentation on theme: "One Pass Pricing (OPP) SEPRT 12"— Presentation transcript:

1 One Pass Pricing (OPP) SEPRT 12
Defense Supply Center Richmond One Pass Pricing (OPP) SEPRT 12

2 Key Elements OPP is a streamlined alpha pricing process
The DLA prototype was developed with Honeywell, AZ Underpinned by a Forward Price Agreement on the review and negotiation parameters applied to bottoms up cost (labor hours / material), rates (e.g. overhead, G & A) and profit. Engages the primary stakeholders / decision makers: Contractor – DCMA – DCAA – Contracting Office – DoDIG Delivers real-time decisions / results Subject to required approvals Results: Promotes pricing between 100 & 200 items per week Average reduction in associated ALT of more than 75% Over 15,000 items on contract as a result of OPP

3 OPP - Program Action Plan
Indentify OPP Opportunities Schedule review and target initial location / population to price Perform OPP process steps (1) thru (4) Improve the process, identify inhibitors and conduct lean event Repeat step (1) thru (3) same location for successive add-on populations, and export to other sites. Control by examining the process and establishing metrics for review

4 Opportunities OPP promotes: Currently 8 sites actively engaged in OPP
Efficient pricing Economic resource utilization Contract growth (especially in the spares environment) Currently 8 sites actively engaged in OPP Boeing (3) - Honeywell (3) - Parker - Sikorsky SSA long term contract coverage is being reviewed Within the SSA we are identifying opportunities: E.g. – Items not on LTC with > 4 demands annually 956 NSNs < 2 years inventory Value $180M

5 OPP Roll Out One Pass Pricing Schedule Tier 1 – Active or Initiated
Boeing – Honeywell – Parker – Sikorsky Tier 2 – Planned within next 6 months BAE Systems – Eaton – Lockheed – Northrop Tier 3 – Proposed within 12 months Hamilton – Moog – Pratt – Rolls – Textron Tier 4 – Year 2 ABS – CCC – GE – Goodrich – Smiths

6 OPP Program Office - POCs
Program Managers: Brian Benfer ph: (DSN ) Rodney Bonner ph: (DSN )


Download ppt "One Pass Pricing (OPP) SEPRT 12"

Similar presentations


Ads by Google