PROJECT 5C2 Total execution period of the project: 12 weeks.

Similar presentations


Presentation on theme: "PROJECT 5C2 Total execution period of the project: 12 weeks."— Presentation transcript:

1 PROJECT 5C2 Total execution period of the project: 12 weeks

2 5C2 project components Shield Leg 1 Reflector + Lens Mole 1/2 F8311
Mole 1/2 F8345/6

3 5C2 project components Tail F1213 Cover Side 3/4 F1731/41

4 5C2 project components Cover Handle 2 F6145 Mud Guard F1629

5 5C2 project components Fender F1511 Board Footrest F7481

6 5C2 project components Shield Leg 2 Assist Grip Cover Footrest F8312
F474A/W Cover Footrest F7413/23

7 5C2 project components Cover Side 1/2 F1711/21 Cover Under F8385

8 Reflector Lens Price: 27.500 € Price: 28.500 € Cold Runner Cold Runner
Steel: HH Price: € Cold Runner Steel: HH

9 Shield Leg 1 Price: 73.000 € Hot runner system: Bru y Rubio
Steel:

10 Mole 1/2 Price: € Hot runner system: Bru y Rubio Steel:

11 Tail Price: € Cold Runner Steel:

12 Cover Side 3/4 Price: € Cold Runner Steel:

13 Mud Guard Price: € Cold Runner Steel:

14 Cover Handle 2 Price: € Cold Runner Steel:

15 Fender Price: € Hot nozle Steel:

16 Board Footrest Price: € Cold Runner Steel:

17 Assist Grip Price: € Cold Runner Steel:

18 Shield Leg 2 Price: € Hot nozle Steel:

19 Cover Footrest Price: € Cold Runner Steel:

20 Cover Under Price: € Cold Runner Steel:

21 Cover Side 1/2 Price: € Cold Runner Steel:


Download ppt "PROJECT 5C2 Total execution period of the project: 12 weeks."