Presentation is loading. Please wait.

Presentation is loading. Please wait.

22-INTEGRATION HUB 18.07.2018.

Similar presentations


Presentation on theme: "22-INTEGRATION HUB 18.07.2018."— Presentation transcript:

1 22-INTEGRATION HUB

2 This documentation and training is provided to you by beas group AG
This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way acknowledged or endorsed by SAP. For SAP Business One, only the documentation and training officially released by SAP shall be binding upon SAP. SAP shall not be responsible for any content of this documentation and training and this documentation and training shall not be binding upon SAP in any way. The official current SAP Business One documentation and training for SAP Business One is available at and 7/18/2018

3 Requirements for this Tutorial
You will need a good grasp of: The basics of SAP 7/18/2018

4 Learning Targets After working through the lesson, you will be able to: Understand the concept of integration hub function Create integration task and import data by it 7/18/2018

5 Agenda Integration Hub 1: General 2: Step by step
3: Import automatically 7/18/2018

6 General- New beas industry 4.0 Data integration hub
With new import program you can create connection to PDM and CAD Software new design for import definition, simplier to use import xml or excel files automatic import from directory, database and so on import more areas in one task field mapping: extented field description

7 New import program – new opportunities
automatic time synchronization with lot of time recording devices connection to data collection devices automatic synchronization with CAD or PDM systems

8 General New beas Industry 4.0 Data Integration Hub
✓ Support of XML, CSV und MS Excel Data format ✓ Highly flexible configuration via mapping on File and field level, even for complex multi-level XML-Data structures, simplifies the creation of the integration logic significantly ✓ Integration of CAD / PDM Systems (Items, BOMs, drawings, routings) ✓ Integration of MES, SCADA, LIMS, WMS Systems with automated transfer of production quantities and times, process- and energy data, material transactions, etc 7/18/2018

9 Agenda Integration Hub 1: General 2: Step by step
3: Import automatically 7/18/2018

10 STEP BY STEP

11 STEP BY STEP 5 4 1,ID Distinct ID of the scenario
2、Target In which area / table should be imported. 3、Import: Only importing, if the target is not available yet. Update: Only importing, if the target is already available. In this case existing data will be replaced, or will be updated with new information (depends on the area) Import & Update: Imports new data rows and matches existing data rows. 4、Excel: Import of an excel file. Note: Excel must be installed. ODBC: Import via an OBDC file. A SQL-statement and optional a DSN - connection string is to be indicated. TAB, semicolon, comma: Determines the separator in a CSV - file Any other separator can also be entered manually. 5

12 STEP BY STEP -Linkage Source Target
The assignment between target field and source field is done here. Important: The target fields are on the right side and the source fields are on the right side. All available fields target fields will be shown here. Below them are the details for the target- and source field. Here a value from the source table or a default value or a calculated value must be transferred to the target field. Via “Import Preview” can be displayed, how many will actually be accepted.

13 STEP BY STEP-Preview & START IMPORT

14 Agenda 13 projects released Integration Hub 1: General 2: Step by step
3: import automatically 7/18/2018

15 Step by Step Create a new task for import 7/18/2018

16 In the tab Import you can define which files have to be imported automatically.
For this a directory will be defined, which will be checked for new files. For the import per file up to 6 import definitions can be defined, which will be read in subsequently. For example: A file contains information on items and bill of materials. First, the item will be read in followed by the bill of materials. Then the inserted file will be deleted or displaced. In case of an error the import will stop immediately. The variable "importlog" saves the error log. In the field “Script after import” a script can be stored, which will be called after the import. This can be used to write a message (eg. in a response file), to enable a two way communication The more information about the beas service please see 15e

17 Summary You can now: Understand the concept of integration Hub
Create new data integration task 7/18/2018

18 Thank you for your cooperation!
7/18/2018


Download ppt "22-INTEGRATION HUB 18.07.2018."

Similar presentations


Ads by Google