Presentation to Portfolio Committee
DEPARTMENT OF LABOUR IES Presentation to Portfolio Committee 1
2
Table of Content Background IES Strategy Basis for Proposal
Developing trends in the IES field Strategic Imperatives Benchmarking A. Current realities Implications thereof 2
3
Table of Content 10. Request for Goods and Services budget
B. Request for Improved Staff Establishment 12. Assumptions 13. How post will be distributed 14. Different Scenarios (100; 60 and 30%) 15. Action Plan 7/18/2018
4
Background Inspection and enforcement services are committed to the following strategic objective: To promote good labour practices including sound labour relations, improved conditions at work and minimum wages, fair labour practices and healthy and safe working environment. We are enforcing the law to achieve these objectives.
5
IES Strategy It is common cause that the IES strategy is premised on three pillars: Advocacy and Awareness creation Inspections and Enforcement. 7/18/2018
6
Basis for Proposal This proposal is developed against the backdrop of:
The changing nature of work we are currently experiencing The inspectorate being the primary mode of service delivery of the department The reality that our inspectorate is not geared towards meeting these changing demands 7/18/2018
7
Developing Trends in the Labour Market
The rate of OHS incidents in the country continue to increase. The construction industry alone, two fatalities are occurring a week The amount of money that the country bleeds as a result of workplace incidents is in excess of R2 billion (CF Claim stats 2012) Amendments to the Labour legislation. 7/18/2018
8
Developing Trends in the labour market
New legislation PESA Currently there are at least three other pieces of labour legislation proposed for amendments Secondary legislation e.g. sectoral determinations as well as the introduction of a national minimum wage) 21 OHS regulations that requires an inspectorate that is fit for purpose. 7/18/2018
9
Strategic Imperatives
Both the NDP and the MTSF obliges us to contribute to the key outcomes such as: A long and healthy life for all (Promotion of occupational health services) Strengthening of social protection (development of occupational health and safety policies) Transforming the society and uniting the nation (promotion of equity in the workplace 7/18/2018
10
Benchmark Based only on one discipline, Occupational Health and Safety, the ILO benchmark is 1 Inspector for every members of the workforce. In terms of the Quarterly Labour Force Survey (February 2015) RSA has employed persons. It means that South Africa requires 1011 OHS inspectors for the economically active population but for employed works would require 766 inspectors.
11
Current reality Dol has a total staff establishment of inspectors with 1247 filled.
12
Total budget for IES Table 2 Cost of current Inspectorate 2014/15 Sum IES Salaries Employer Contribution Total Budget Allocation Surplus/ -Shortfal DDG 2,683,404.00 390,276.00 3,073,680.00 11,456,000.00 8,382,320.00 CD IES 18,306,373.00 2,717,293.00 21,023,666.00 18,234,000.00 -2,789,666.00 CD S&AS 4,616,616.00 634,493.00 5,251,109.00 2,731,000.00 -2,520,109.00 EC 35,438,070.00 6,373,736.00 41,811,806.00 32,470,000.00 -9,341,806.00 FS 26,931,832.00 4,804,877.00 31,736,709.00 24,548,000.00 -7,188,709.00 GP 71,260,999.00 12,828,161.00 84,089,160.00 66,785,000.00 -17,304,160.00 KZN 59,489,639.00 11,181,138.00 70,670,777.00 56,963,000.00 -13,707,777.00 LP 29,097,330.00 4,696,416.00 33,793,746.00 26,508,000.00 -7,285,746.00 MP 26,942,402.00 4,643,816.00 31,586,218.00 23,678,000.00 -7,908,218.00 NC 15,595,422.00 2,534,096.00 18,129,518.00 115,343,000.00 97,213,482.00 NW 23,905,014.00 4,191,662.00 28,096,676.00 22,361,000.00 -5,735,676.00 WC 35,379,928.00 6,356,927.00 41,736,855.00 32,858,000.00 -8,878,855.00 349,647,029.00 61,352,892.00 410,999,921.00 333,935,000.00 -77,064,921.00
13
2015/16 of Goods and Services The allocated budget is R Of this amount the allocation for inspections is around R49 000 000. The remainder of the budget is utilized for operational matters However to deliver on our current Annual Performance Plan as approved by cabinet the goods and services budget required by IES for goods and services for inspections only is set out in the table below based on an average cost R per inspection:
14
Operational cost to fund APP
2016/17 Indicators Totals numbers Total inspection costs Employment Equity 5271 R Vulnerable workers R High risk sector(OHS) 21 909 R Employer audits 12 386 R Totals R Therefore in terms of the operational budget, we are already projecting a shortfall.
15
Implications for increased targets over the MTEF
2015/16 Indicators Totals numbers Total inspection costs Employment Equity 4 926 R Vulnerable workers R High risk sector(OHS) 20 476 R Employer audits 11 576 R Totals R
16
Cost of Employment (CoE)
The current approved staff establishment is 1347 inspectors. Of these we have 100 vacancies. The total CoE budget is (R349 ) This only covers the filled posts. You would recall that Treasury reduced the IES budget by R64 million). We thus had to freeze these vacancies because of the shortfall created by this reduction.
17
Funding of IES: CoE(current)
18
Current IES Reality from the latest establishment report (March 2015) IES requires R million for the approved establishment (1 347 full time equivalent posts). The filled posts (1 247 FTE posts) require R million. The current vacancies (100 FTE posts) amount to R million. Therefore IES have a shortfall of R million for 2015/16.
19
Current IES Reality These amounts include the NT projected annual salary increase of 5.8% from 1 April 2015 and a 1.5% Pay Progression System increase from 1 July 2015 for qualifying officials. Please note that these amounts exclude the 1.5% of establishment for merit awards. It should therefore be noted very clearly that the additional budget of R64 intended for the next ( ) financial year can only be utilized to address the deficit on the approved staff establishment.
20
Implications There will be no budget to appoint additional inspectors. The R64m intended for the financial does not address the shortfall in the goods and service budget. Of critical importance now however is to fill the staff establishment as approved. It would be foolhardy to utilize this funding to fill vacancies and we do not allow inspectors to conduct inspections since we do not provide the concomitant goods and services budget.
21
Request for Goods and Services funding
The department acknowledges that within this tight fiscal framework, it would be difficult to request an additional R77 million on goods and services in addition to the proposed R64million earmarked. Therefore a proposal to spread this load is set out in the following table.
22
percentage allocation per annum
Proposal Additional required goods and services for the approved staff establishment: percentage allocation per annum 2016/17 40% 77,443,452.92 30,977,381.17 2017/18 20% 15,488,690.58 2018/19
23
B. Proposal for improved Staff Establishment
24
Assumptions The following assumptions are made:
That the organisation sits with a critical shortage of inspectors The proposal however is made to establish critical capacity in all three major areas with a focus on Employment Equity as well as Occupational Health and Safety
25
Assumptions Any improvement plan should recognize the tight fiscal environment Three different possible scenarios is proposed (a) a full funded scenarios; (b) funding only provided for 60% of the proposal and (c) funding provided for 30% of the proposal.
26
Assumptions All three disciplines and a possible spread over labour centres is provided Additional requirement is 636 ( 500 OHS Inspectors and 100 EE and 36 BCEA inspectors Large Labour Centres will consist of the following posts: 1 - SR12 Control Inspector 6- SR10 Principle Inspectors for the following fields: OHS BCEA and EEA
27
How posts will be distributed:
Estimated deployment per province Eastern Cape 95 15% Free State 32 5% Gauteng 159 25% Kwazulu Natal 127 20% Limpopo Mpumalanga Northern Cape North West Western Cape 636 100%
28
Scenario 1: 100% funded
29
Compensation of Employees 100% funded
SR Level Number Annual COE cost pp Total Cost 12 27 10 478 8 131 636
30
Goods and services (100% funded
ITEM Number Annual cost per post Total Costs Comments Office furniture 636 once off Cell Phones Transport cost 1700km Accommodation 1300*20 nights pp Stationary/uniform/etc Total: Goods and Services Total Requirement
31
Scenario 2: 60% funded
32
Compensation of Employees 60% funded
SR Level Number Annual COE cost pp Total Cost 12 27 10 250 8 79 356
33
Goods and services (60% funded
ITEM Number Annual cost per post Total Costs Comments Office furniture 356 once off Cell Phones Transport cost 1700km Accommodation 1300*20 nights pp Stationary/uniform/etc Total: Goods and Services Total: Requirement
34
Scenario 3: 30% funded
35
Compensation of Employees 30% funded
SR Level Number Annual COE cost pp Total Cost 12 8 10 143 39 190
36
Goods and services (30% funded)
ITEM Number Annual cost per post Total Costs Comments Office furniture 190 once off Cell Phones Transport cost 1700km Accommodation 1300*20 nights pp Stationary/uniform/etc Total: Goods and Services Total: Requirement
37
Action Plan # Activity Responsible person Date Comments
Budget allocation National Treasury 2016/17 financial year 2 Job profiles finalised OD Q2 – 2015/16 3 Adverts placed CS Branch Q3 – 2015/16 4 Interviews IES Branch Q4 – 2015/16 5 Posts filled Q1 – 2016/17 6 Resources provided: Cars Legislation Personal Protective Equipment Furniture Offices Cell phone/Tablet Stationery Suit case to carry inspection equipment (notices; legislation, etc.) Notices (prohibition; Contravention and Improvement) IES Branch On appointment and as competency is found to be adequate 7 Training: Q /17 to Q /18 Training will take place in groups. Each groups training will be staggered. Training will be conducted over six (6) months for each group. 8 Support through Mentoring/Coaching programme Schedule to be drafted. Coaches and mentors to be trained where this has not already taken place. 9 Competency requirements met Q /17 to Q /18 Testing will take place throughout the training programme. 10 Issuing of inspector cards At end of course Inspector understands mandate.
38
What is required from the Portfolio Committee
The Portfolio Committee is requested to: Take note of the Department of Labour's plan to strengthen the inspectorate. Support the Department of Labour in its quest to strengthen the inspectorate.
39
Thank You 39