1 5th DOSAR Workshop Louisiana Tech University Sept. 27 – 28, 2007
UTA Site Report Jae Yu Univ. of Texas, Arlington 5th DOSAR Workshop Louisiana Tech University Sept. 27 – 28, 2007

2 Introduction UTA a partner of ATLAS SWT2
Actively participating in ATLAS production Kaushik De is co-leading Panda development Phase I implementation at UTACC completed and running Phase II hardware installation completed Software installation in progress MonALISA based OSG Panda monitoring implemented  Allow OSG sites to show up on the LHC Dashboard Working on DDM monitoring HEP group working with other discipline in shared use of existing computing resources Interacting with the campus HPC community Working with HiPCAT, Texas grid community 9/27/2007

3 UTA DPCC – The 2003 Solution UTA HEP-CSE + UTSW Medical joint project through NSF MRI Primary equipment for D0 reconstruction and MC production up to 2005 Now primarily participating in ATLAS MC production and reprocessing at part of SWT2 resources Other disciplines also use this facility but at a minimal level Biology, Geology, UTSW medical, etc Hardware Capacity PC based Linux system assisted by some 70TB of IDE disk storage 3 IBM PS157 Series Shared Memory system 9/27/2007

4 UTA – DPCC 84 P4 Xeon 2.4GHz CPU = 202 GHz
5TB of FBC + 3.2TB IDE Internal GFS File system 100 P4 Xeon 2.6GHz CPU = 260 GHz 64TB of IDE RAID + 4TB internal NFS File system Total CPU: 462 GHz Total disk: 76.2TB Total Memory: 168Gbyte Network bandwidth: 68Gb/sec HEP – CSE Joint Project DØ+ATLAS CSE Research 9/27/2007

5 SWT2 Joint effort between UTA, OU, LU and UNM
2000ft2 in the new building Designed for U nodes Could go up to 24k cores 1MW Total power capacity Cooling with 5 Livert units 9/27/2007

6 Installed SWT2 Phase I Equipment
160 Node cluster (Dell SC1425) 320 cores (3.2GHz Xeon EM64T) 2GB RAM/core 160GB SATA local disk drive 8 Head Nodes (Dell 2850) Dual 3.2 GHz Xeon EM64T 8GB RAM 2x 73GB (RAID1) SCSI Storage 16TB Storage System Direct Data Networks S2A3000 system 80x250GB SATA drives 6 I/O servers IBRIX Fusion file system Dedicated internal storage network (Gigabit Ethernet) Has been operating and conducting Panda production over a year 9/27/2007

7 SWT2 Phase II Equipment 50 node cluster (SC 1435) 2 Head nodes
200 Cores (2.4GHz Dual Opteron 2216) 8GB RAM (2GB/core) 80 GB SATA disk 2 Head nodes Dual Opteron 2216 8 GB RAM 2x73GB (RAID1) SAS Drives 75 TB (raw) Storage System 10xMD1000 Enclosures 150x500GB SATA Disk Drives 8 I/O Nodes DCache will be used for aggregating Storage 10GB internal network capacity Hardware installation completed and software installation in progress 9/27/2007

8 ATLAS SWT2 (2007) SWT2-PH1@UTACC SWT2-PH2@UTACPB
320 Xeon 3.2 GHz cores = 940 GHz 2GB Ram/core = 640GB 160GB Internal/unit  25.6TB 8 dual core server nodes 16TB of storage assisted by 6I/O server Dedicated Gbit internal connections 200 Optaron 3.2 GHz cores = 640 GHz 2GB Ram/core = 400GB 8GB SATA /unit  4TB 8 dual core server nodes 75TB of storage by 10 Dell MD100 Raid assisted by 8 I/O servers Dedicated Gbit internal connections 9/27/2007

9 Network Capacity History at UTA
Had DS3 (44.7MBits/sec) till late 2004 Choke the heck out of the network for about a month downloading D0 data for re-reconstruction Met with VP of Research at UTA and emphasized the importance of network backbone for attracting external funds Increased to OC3 (155 MBits/s) early 2005 OC12 as of early 2006 Connected to NLR (10GB/s) through LEARN ( via 1GB connection to NTGP $9.8M ($7.3M for optical fiber network) state of Texas funds approved in Sept. 2004 9/27/2007

10 LEARN Status 9/27/2007

11 NLR – National LambdaRail
ONENET LONI LEARN 10GB/sec connections 9/27/2007

12 Software Development Activities
MonALISA based ATLAS distributed analysis monitoring A good, scalable system Software development and implementation completed ATLAS-OSG sites are on the LHC Dashboard New server purchased for OSG at UTA  Activation to follow shortly Working on DDM monitoring project 9/27/2007

13 Centralized LHC Distributed Computing Monitor
9/27/2007

14 CSE Student Exchange Program
Joint effort between HEP and CSE David Levine is the primary contact at CSE A total of 10 CSE MS Students each have worked in SAM-Grid team Five generations of the student Many of them playing leading roles in grid community Abishek Rana at UCSD Parag Mashilka at FNAL Sudhamsh Reddy working for UTA at BNL New program with BNL implemented First student on completed the tenure and is on job training Second set of two Ph.D. students at BNL Participating in ATLAS Panda project One student working on pilot factory using condor glide-in Working on developing middleware 9/27/2007

15 Conclusions MonALISA based panda monitoring activated
New server needs to be brought up Working on DDM monitoring Will be involved in further DDM work Leading EG2 (photon) CSC note exercise Connected to 10GB/s NLR via 1GB connection to UTD Working closely with HiPCAT for State-wide grid activities Need to go back on to the LAW project but awaiting for successes at OU and ISU 9/27/2007