Download presentation
Presentation is loading. Please wait.
1
ONAP Information Model and Data Model
SDC Suggested Approach for R2 …
2
ONAP Information Model – R2
OpenECOMP IM as a starting point Influence by ETSI (IFA and IFA 014), TMF, MEF, ONF, … Align with SDC R1 DM AllottedResource x/VL x/CP ...
3
ONAP Design-Time Data Model – R2
Based on TOSCA Simple Profile 1.2 SDC R1 DM as a starting point Influence by TOSCA NFV Profile (CSD00x) Influence by ETSI NFV-SOL 001 Align with ONAP IM “Complex Service” (aka Nested Service) …
4
Last slide Need to have an agreement on our modeling approach by EOW
Set guidelines and principals by Oct 6 Namespace How we add extensions ... Need to complete R2 related work by mid-Dec Need to have a detailed timetable which covers: VNF Descriptor Network (x/VL, x/CP) Descriptors VNFFWG, NFP Service Descriptor Backward compatibility strategy
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.