Download presentation
Presentation is loading. Please wait.
1
FUNDING FOR ENERGY UPGRADES
2
WHAT’S IN THE WAY? Not payback, IRR, cost of money, or even reliable innovation. Its “other priorities”. IF you get past those, then there’s the traditional process… 1 5 9 13 17 Needs analysis Budget allocated Order materials Legal Review Pay vendors 2 6 10 Performance Guarantees secured 14 18 RFP issued/response Obtain lien releases RFI issued Installation 3 7 11 15 19 Annual performance audits Vendor Selection Performance Bond issued Audit Commission 4 8 12 16 20 Approval to issue RFP Contract Awarded Project Plan for installation Performance Verification Ongoing maintenance
3
WHAT TYPES OF PROJECTS LED lighting Refueling stations (CNG/LPG)
Boilers, chillers and refrigeration Smart plumbing controls; Low flow water-efficiency solutions HVAC retrofits; building envelope energy efficiency Smart/precision irrigation systems High-efficiency motors/starters Building envelope upgrades Waste systems Smart motor controls (VFD)
4
EXISTING FUNDING OPTIONS
DSIRE Clean Energy Constellation Grant Energy Grants for Schools Local Government Commission Rural Energy for America Program Grants.Gov LOANS LOW INTEREST PACE FUNDING SELF FUNDED ESCOS PERFORMANCE CONTRACTING SHARED SAVINGS MODELS (PUBLIC PRIVATE PARTNERSHIPS)
5
SERVICE MODEL PROCESS Dramatically Collapse Project/Procurement Cycle Times
Notice to Proceed, P.O.’s Potential infrastructure installation and economics identified Install cloud based meters to validate economics M&V of efficiency & performance gains Agreement installation specific Addendum, integrated time- line. Product, Installation and Service Provider Selection Installation, Commissioning & Certificate of Acceptance Company Confidential, not to be reproduced or transmitted without prior express permission
6
Program Comparisons PUBLIC PRIVATE PARTNERSHIPS You are protected from economic risk and lower your infrastructure costs at the same time.
7
MONITORING AND VERIFICATION – SAMPLE PROJECT:
Peak due to weekend installation Pre-installation baseline usage 66% Reduction in kW use Post-installation usage
8
VIEW YOUR BENEFITS MONTHLY
Company Confidential, not to be reproduced or transmitted without prior express permission
9
SUMMATION: LOOK FOR PROVIDER FOR ALL YOUR NEEDS AND PROVIDE MAINTENANCE AND EQUIPMENT UPGRADES AS PART OF PROGRAM LOOK FOR PROGRAM THAT UTILIZES ENERGY SAVINGS TO PAY FOR UPGRADES AND MAINTENANCE AVOID LONG TERM AGREEMENTS HAVE PROVIDER CO-ORDINATE WITH UTILITY FOR RATE REDUCTION OR CREDITS READ THE FINE PRINT IE BUYOUT CLAUSES, NON PERFORMANCE STIPULATIONS ENERGY SAVINGS ETC Company Confidential, not to be reproduced or transmitted without prior express permission/Oct. 2016
10
THANK YOU JIM SALDIVAR Sustainability Partners LLC
Company Confidential, not to be reproduced or transmitted without prior express permission/Oct. 2016
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.