CLOUD Financial Review Committee meeting #4 22 October Financial plan for 2015 and beyond 22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

2 4th FRC meeting, Antti Onnela, CERN-PH-DT
CLOUD Common Fund One single account in use: CERN Team account T299584 Covers Maintenance and Operation of the CLOUD Facility at the T11 beam-line at CERN Gas supplies and gas systems Thermal systems, including temperature measurements HV system UV systems Sampling probes, optical ports Central DAQ Used also to cover modifications and minor upgrades to the above systems, to adapt them to different CLOUD measurement setups and objectives. As agreed in the previous CLOUD FRC meetings the annual contributions to the Common Fund have been maintained at 50 kEuro and 20 kEuro for category 1 and 2 institutes respectively. 22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

3 Monthly cashflow since 2011
22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

4 Cashflow and balance since 2011
Oct-Dec 2015: 2016 CF contributions ~100 kCHF further payments Sep 2015 Sep 2014 22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

5 Debt to be fully paid by 1 April 2017.
In the CLOUD FRC of 1 Oct the debt situation was – again – discussed. CERN management: Debt to be paid by end of 2016 A follow-up meeting was held on 27 Oct 2014 to setup the debt payment schedule, with annual ceilings. Debt to be fully paid by 1 April 2017. 22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

6 Path to positive balance
0 CHF -250 kCHF Debt limit -500 kCHF Apr 2015 Apr 2016 Apr 2017 Sep 2014 Sep 2015 Need 200 kCHF annual positive balance through next 2 years 22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

7 Expenditures in past 1 year / Estimates for next 1 year
22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

8 4th FRC meeting, Antti Onnela, CERN-PH-DT
Common Fund contributions, years Account T299584, 13 October 2015 Comments: CLOUD M&O MoU signed in 2012. “In-kind” permanent hardware contributions to CLOUD Facility by CERN, Frankfurt, Leipzig, Lebedev, PSI. 460 kEuro x ~1.05 = ~483 kCHF 22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT 8

9 4th FRC meeting, Antti Onnela, CERN-PH-DT
Unpaid contributions At the previous FRC meeting on 1 Oct 2014 the backlog of unpaid contributions was 260 kEuro. Now the backlog is 200 kEuro: 200 kEuro x ~1.05 = ~210 kCHF 22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

10 4th FRC meeting, Antti Onnela, CERN-PH-DT
2016 budget Expenditures: Budget needed for CLOUD M&O for 2016 is estimated at 300 kCHF. FRC is requested to approve this budget. Contributions: Need to be 500 kCHF to cover the 300 kCHF expenditures and to ensure 200 kCHF annual positive balance, to meet the debt payment schedule. With exchange rate of 1.05 CHF = 1 Euro, 500 kCHF is a close match with the nominal annual contributions of 460 kEuro, with 50 kEuro and 20 kEuro contributions maintained. The invoices for 2016 contributions will be issued within October 2015, following the decisions by this FRC meeting on the annual contributions. 2016 contributions are to be paid preferentially within 2015 and at latest within March 2016. Payment of the 200 kEuro backlog remains essential. The above figures provide no margin against missing or delayed contributions, unplanned expenditures (e.g. major equipment failures) or Euro further weakening against CHF. Non-payment cases: Application of the non-payment rules, set on 29 October 2014, are to be discussed in the FRC. Slide ‘Unpaid contributions’ lists the current non-payment cases. Non-payment rules in spare slides. 22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

11 Other resource challenges
Open office – meeting room CERN contribution (according to the CLOUD MoU). Permanent solution still missing. Temporary solutions in CLOUD9 and CLOUD10. Barrack used during CLOUD9 has been dismantled (and was very noisy). Space currently used during CLOUD10 is used in June – September by CERN summer students. Technical / host team at CERN CERN staff sub-critical in number (3 persons part-time = 1 full time equivalent), and availabilities conflict with LHC needs. Fellow contracts (CLOUD-TRAIN and CERN) are ending, dropping to zero in summer No continuation under the current schemes! 22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

12 4th FRC meeting, Antti Onnela, CERN-PH-DT
Summary The CLOUD Common fund accumulated a debt of 800 kCHF in Positive annual balance through past 2 years, debt now at 350 kCHF. Need 200 kCHF annual positive balance through next 2 years to pay the debt in the schedule agreed with the CERN management. 300 kCHF annual budget needed for 2016. 500 kCHF annual contributions needed. Achieved if the agreed contributions are paid, in time. Several unpaid contributions still remaining. If not paid, application of non-payment rules? Manpower situation is getting extremely critical at CERN. With 1 FTE staff and zero fellows no possibility to appropriately support CLOUD preparations and runs in 2016. Solutions? 22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

13 4th FRC meeting, Antti Onnela, CERN-PH-DT
Spare slides 22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT

14 4th FRC meeting, Antti Onnela, CERN-PH-DT
22 Oct 2015, indico: 4th FRC meeting, Antti Onnela, CERN-PH-DT


Download ppt "4th FRC meeting, Antti Onnela, CERN-PH-DT"

Similar presentations


Ads by Google