NATIONAL HYDROLOGY PROJECT(NHP)- WORLD BANK MISSION C – 1ST MEETING – 17th - 18th August 2017 BENGALURU Shajatnan, superintending engineer i/c nhp and Thomas scaria, senior hydro geologist, Groundwater department Kerala KERALA GROUNDWATER DEPARTMENT

2 NATIONAL HYDROLOGY PROJECT- SPMU KERALA GROUND WATER
Vide go(MS) No. 44/2016/wrd dated 15/07/2016 Govt of Kerala constituted SPMU Coordinator:- Director Groundwater Department KS MADHU Project Coordinator, Training Coordinator and nodal Officer :- Superintending Hydro geologist (HP), State Data Centre, Thiruvanathapuram. SABU K DAMODAR Procurement Officer:- Superintending Engineer(HP), State Data Centre, Thiruvanathapuram. VACANT Since 31st Aug 2016, Full additional charge to EE (Hydrology)- SHAJATNAN PDS Hydrochemistry :- Chief Chemist Lab Level II, Thiruvananthapuram.. VACANT Since 31st MARCH 2016, Full additional charge to CHEMIST- TESSY PDS Hydrogeology :- Senior Hydro geologist(HP) State data centre Thiruvananthapuram. AG GOPAKUMAR Accounts officer :- Senior Finance Officer Groundwater Department . LATHA KERALA GROUNDWATER DEPARTMENT NHP

3 NHP FUNDS RECEIVED AND EXPENDITURE
COMPONENTS/YEAR A B C D TOTAL IN LAKH RUPEES 120 100 TOTAL 220 TOTAL AWP 191.95 9 20 52 272.95 Expenditure Expenditure of 3.24 lakhs incurred for trainings and TA, but not updated in MIS due to administrative reasons. KERALA GROUNDWATER DEPARTMENT

4 MAJOR PROCUREMENT ITEM IN PIP
Component Item Code Item Units Amount in Lakhs A A1.1.04 Shallow Slim Holes – Civil works for Groundwater monitoring 650 325 A1.1.05 Platform construction and protective covers– Civil works for Groundwater monitoring 730 365 KERALA GROUNDWATER DEPARTMENT Regional Data Processing Centre,Ernakulam

5 MAJOR PROCUREMENT ITEM IN awP 2016-17
Component Item Code Item Units Amount in Lakhs A A1.1.04 Shallow Slim Holes – Civil works for Groundwater monitoring 150 75 A1.1.05 Platform construction and protective covers– Civil works for Groundwater monitoring 130 65 KERALA GROUNDWATER DEPARTMENT

6 MAJOR PROCUREMENT ITEM IN awP 2017-18
Component Item Code Item Units Amount in Lakhs A A1.1.04 Shallow Slim Holes – Civil works for Groundwater monitoring 100 50 A1.1.05 Platform construction and protective covers– Civil works for Groundwater monitoring 110 33 KERALA GROUNDWATER DEPARTMENT

7 PHYSICAL PROGRESS Proposed: Completed Process Underway :
Design of piezometers/low diameter wells approved by CGWB Selection of wells in association with CGWB as one each in One Block. Requirement of computer and peripherals consolidated. Status of DWLR installed in previous projects examined by CWPRS team. Team constituted for digitization of available data VES etc. Demonstration for DWLR made. Process Underway : Permission from various departments for slim hole installations awaiting. Mobile applications for well census under process. Furnishing of district data centers, regional and state data centers. Proposed: Purchase of vehicles . * Computer and peripherals. * Purchase of DWLR’s * Lab Equipments KERALA GROUNDWATER DEPARTMENT

8 Total items in Procurement Plan (2016-18)
Status of bid document Item Code Item Units STATUS A1.1.04 Shallow Slim Holes – Civil works for Groundwater monitoring 100 Ready to be floated A1.1.05 Platform construction and protective covers– Civil works for Groundwater monitoring 110 Total items in Procurement Plan ( ) Floated Ready to be floated Under Preparation 19 7 12 KERALA GROUNDWATER DEPARTMENT

9 Pds status No Item Status PDS1
Impact on GW status due to pesticide residues in cardamom cultivating areas in Idukki Preliminary review of the project done by NIH and comments received. Observation well location finalization 50% Location map Prepared PDS II Mapping Groundwater Quality in the industrial belt of Ernakulam District 15 Observation well identified. Location map under preparation. PDS V Management of Groundwater pumping for irrigation with special reference to calcified zones in Palakkad District Revised format prepared as specified by NIH. KERALA GROUNDWATER DEPARTMENT Other 4 PDS will be taken up in the next financial year.

10 Hydromet station status
No Items Status 1 Full Climatic stations 8 Nos available Preliminary inspection done by CWPRS officials. Renovation and future maintenance proposed through SW by handing over the same 2 Observation wells, Piezometers available 734 DWLR not functional, Manual observation continues. Possibility to repair the same is explored through CWPRS. 3 Open wells 359 Bore well 338 Tube well 37nos Manual Observation continues. 4 Decision taken with CGWB One observation well will be identified in each block and DWLR will be installed. KERALA GROUNDWATER DEPARTMENT

11 Status of state wris Major activities
1. Expand and upgrade water resources monitoring systems including automation with Real Time Data Acquisition System (DWLR Telemetry) decided to select one each in one block ( 152 Nos Proposed immediately) 2. Mobile application for well census - preliminary discussion with kesrc done and fields identified. 3. Upgrading/ procurement of IT equipments, requirement formulated. 4. Up gradation of DATA Processing Centre's, in progress. KERALA GROUNDWATER DEPARTMENT

12 Public finance management SYSTEM - status
Pfms status is approved pfms id is kl tu KERALA GROUNDWATER DEPARTMENT

13 Other issues Major issues Fill up the vacant positions in SPMU and in the project not Materialized. Possibility to include expenditure incurred for the construction of Regional Data Possessing Centre Ernakulam in the current PIP. Possibility for the construction of Regional Data Possessing Centre at Kozhikode. Engagement of Contract Staff for the implementation of the project – Guidelines to fix salary and allowances ? Accounts officer is senior finance officer deputed from finance department of government of Kerala ( Frequent Transfers) ------ KERALA GROUNDWATER DEPARTMENT

14 Way forward Major activities Planning to compensate the shortage of regular staff by appointing contract staff. Infrastructure of the department will be strengthened to progress the project as planned. Finance wing to be strengthened. Pursue with the government to fill up the vacant positions. Institutional strengthening by providing Trainings. ---- KERALA GROUNDWATER DEPARTMENT