Download presentation
Presentation is loading. Please wait.
Published byGeraldine Henderson Modified over 6 years ago
1
Western Harbour – sustainable urban development in Malmö
Ms Eva Dalman, project manager, Western Harbour, City of Malmö Planning Department
3
2002
4
then…
5
Malmö nu …and now
6
2035
7
RÖRELSER Lokalgator TURNING TORSO Demonstration project Bo01- first phase in the development of a national example of urban sustainability NÄSTA
8
Driving forces: housing exposition 2001 and government support (250 million Skr)
Strong incentives for developers and investors to perform exceptionally well
9
The demonstration project
24 hectares of land 1300 apartments completed Approximately inhabitants Mixed development
12
Lots of small projects 20 developers
Over 30 different architectural firms
13
Ecological sustainability
Energy system Waste system The green parts Mobility management Cleaning the soil Environmentally adapted building process
14
Energy – 100 % locally produced renewables
15
Energy production Electricity from a wind power (and photovoltaics minor prod., 180 sq metres) Heat from solar collectors and a heat pump (aquifer and sea water) Cooling from heat pump and aquifer (Bio gas – minor prod.)
16
The Eco-Cycle City Biological waste is separated Food waste disposers
Underground tank Vacuum collection vehicle Biogas digester Convenient collecting system for reuse of paper, glass, cardboard…
17
Biodiversity and Local Storm water Management
Implementation to improve biodiversity Storm water in open channels and ponds for cleaning and infiltration
18
Green space factor Improving the residential environment
Establishing and revaluating the habitat for animals and plants Saving and developing soil function and water balance Saving and improving the microclimate and air quality
20
Environmental Transport System
Mobility management information and persuation Bicycling and public transportation – 2 buslines, 6 minutes Motor vehicles traffic is restricted
22
”Bo02” -Flagghusen
23
What’s new? From extraordinary to ordinary
Process beats contracts, collaboration before negotiating Social and economic aspects are in focus Sustainability goes mainstream
24
Second step – mainstream!
The creative dialogue – a new process for planning 600 apartments 70 % affordable rentals 13 developers Big parts have been built, the whole area finished in 2008
25
What’s the same? The emphasis on human needs and attractivity
Green area factor – biodiversity The small projects and diversity
26
What’s prioritized? Energy efficient buildings Non-toxic materials
Waterproofed building process Accesibility Safety Affordables
27
What’s next? ”Bo03” Fullriggaren
28
Mainstream and demonstration project
The ”Bo02” – agreement on sustainability is reused as standard Each project will include extra sustainablitiy features – beyond this standard level
29
Vision! A climate neutral city development
(energy production, traffic and rising sea water levels) Pursue the ambition to build attractive, exciting and surprising More mixed use – an integrated knowledge city
30
Thank you for listening!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.