Download presentation
Presentation is loading. Please wait.
Published byHester Eaton Modified over 6 years ago
1
Scoping for Performance-Based Solutions; CR E2 ACEC Conference March 5, Tom O’Keefe Metro District Program Delivery
2
Problem Scenario The sizes of bridges today are an average six times the size of its predecessor… Federal Bridge Inventory Report Innovative solutions to bridge the gap Transportation Demand Transportation Funding In 2010, Twin Cities was ranked 10th most congested city in the nation. (according to 2011 Urban Mobility Report) In 2010, Twin Cities was ranked 10th most congested city in the nation... 2011 Urban Mobility Report
3
Age Profile and Investment Strategy of State Highway Bridges
Overview Based on 2009 MnDOT Bridge Report 10.9% to 19.6% Replace ( =896) 58.4% Improve (2,675) 30.2% Preventive Maintenance (1,383) Age Profile and Investment Strategy of State Highway Bridges
4
We are competing with the world for our message.
5
We are competing with the world for our message.
6
Superstructure Rating – 4 Substructure Rating – 5
Existing Bridge Constructed in 1964 Chapter 152 Bridge Superstructure Rating – 4 Substructure Rating – 5 Vertical Clearance – 14.8’ Sufficiency Rating – 52 Structurally Deficient All beams over SB 35W have repair patches from several high load hits, South fascia has some severed tendons
7
Traffic Volumes West Side ADT East Side ADT
2010 – 10, – 10, – 10, – 14, – 9, – 9,600 2010 – – – – – – 7600 We are competing with the world for our message.
8
Existing Delay West Junction East Junction am LOS B (12 seconds delay)
pm LOS C (21 seconds delay) East Junction am LOS B (13 seconds delay) We are competing with the world for our message.
9
Future Delay 10% Growth 20% Growth West Junction East Junction
am LOS B (14 seconds delay) pm LOS D (34 seconds delay) East Junction am LOS C (15 seconds delay) pm LOS D (33 seconds delay) West Junction am LOS C (16 seconds delay) pm LOS F (69 seconds delay) East Junction am LOS C (19 seconds delay) pm LOS F (64 seconds delay) We are competing with the world for our message.
10
Crash History West Ramp East Ramp Statewide Rank - #2320
Crash Cost - $51,000 Crash Rate – 0.36 Severity Rate – 0.42 Statewide Rank - #2699 Crash Cost - $8,000 Crash Rate – 0.14 Severity Rate – 0.14 How many intersections are there statewide – Over 8000 intersections statewide Metro Average crash cost is $109,000 Average CR for metro area is 0.4 for all way stop Average SR for metro area is 0.5 for all way stop
11
Existing E2 Bridge Section
12
Proposed E2 Bridge Section
We are competing with the world for our message.
13
Section Under E2 Bridge 30’ Clear Zone
14
Section Under E2 Bridge 16’ Clear Zone
15
Tradeoffs for I35W Section
Bridge cost increase for 30’ clear zone Bridge Maintenance Cost incr. for 30’ clear zone Guardrail 16’ Annualized Guardrail Repair 16’ Annualized Guardrail Snow & Ice 16’ Operating funds vs. Construction funds
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.