Presentation is loading. Please wait.

Presentation is loading. Please wait.

Operations and Administration Committee Meeting| January 12, 2016

Similar presentations


Presentation on theme: "Operations and Administration Committee Meeting| January 12, 2016"— Presentation transcript:

1 Operations and Administration Committee Meeting| January 12, 2016
ANYONE WISHING TO SPEAK BEFORE THE VOTE ON ANY AGENDA ITEM MUST FILL OUT A PURPLE FORM ON THE SIGN-IN TABLE. COMMENTS WILL BE LIMITED TO THREE MINUTES. Audience Questions and Comments PERSONS WISHING TO SPEAK MUST FILL OUT A WHITE FORM, LOCATED ON THE SIGN-IN TABLE, BEFORE THE MEETING. COMMENTS WILL BE LIMITED TO THREE MINUTES.

2 Operations and Administration Committee Meeting| January 12, 2016
CHAIR REPORT

3 EXECUTIVE MANAGEMENT REPORT
January 12, 2017 Justin T. Augustine, III

4 Operations Report December 2016 January 12, 2017

5 Operations December Accidents
BUS – 12 Traffic Accidents/ 4 requiring retraining 0.80 Preventable accidents per 100,000 miles STREETCAR – 8 Traffic Accidents/ 1 requiring retraining 0.85 Preventable accidents per 100,000 miles LIFT – 4 Traffic Accidents/ 1 requiring retraining 0.93 Preventable accidents per 100,000 miles

6 December 2016 Accident Map Report (Fixed, Streetcar, and Paratransit)

7 Passengers Per Revenue Hour YTD Passengers Per Revenue Hour
Operations System Usage December 2016 Mode Passengers Per Revenue Hour YTD Passengers Per Revenue Hour Bus 21.70 24.00 Streetcar 38.10 42.70 Paratransit 1.80 1.90 TOTAL 23.30 25.50

8 On Time Performance Bus – 74.27% Streetcar - 72.24%
Operations On-Time Performance December 2016 56% of all lines experienced detours or service interruptions, 37 service disruptions, including 6 long-term detours affected service in December. On Time Performance Bus – 74.27% Streetcar % Paratransit – 81.60%

9 12 Incidents causing 30 minutes delay or more in service delivery
Operations On-Time Performance December 2016 12 Incidents causing 30 minutes delay or more in service delivery 37 short term detours Related to holiday events, parades, construction or routes blocked by accidents. 6 Long term detours: All related to construction. 55- Elysian Fields Line experienced the most short term detours with five (all due to events or parades in the FQ) Most of lines with multiple short term detours stop on the lower part of Canal Street (5, 10, 11, 12, 16, 47, 48, 55) and were disrupted by holiday events.

10

11

12 Ridership Statistics – December 2016

13 Call Center Statistics
Operations Call Center Statistics December 2016 Average Time on Hold: minute and 38 seconds Time to Close Complaint: Average days to close 158 complaints Abandoned Calls: % December 2016 FIXED-ROUTE BUS STREETCAR PARATRANSIT OTHER TOTAL COMPLAINTS 119 22 5 12 158 VALIDATED COMPLAINTS 64 10 4 84 COMMENDATIONS 2 1

14 Service Disruptions: 5 Lines Short Term Detours: 14 Lines
Long Term Detours: 6 Lines Customer Complaints for December 2016 - Driver-Pass Up - Driver-Attitude - Driver-Running Late - Other (Complaints)

15 Maintenance Statistics
Operations Maintenance Statistics December 2016 MAINTENANCE Highlights and Analysis: Total number of in-service mechanical road calls for the month of December were Bus-56, Streetcar-9 and Paratransit-1. During the month of December the miles between mechanical failures system-wide were 11,026 miles.

16 ADA Report

17 ID Center Stats and Highlights
Operations December2016 ID Center Stats and Highlights Provided service to 539 individuals 242 ID cards were issued (64 Senior, 66 Medicare, 79 ADA and 33 Fixed Route Disabled) Eligibility received 120 applications, approved 89, denied 24 and mailed 51. 22 reduced fare applications were also received and processed. 91,425 individuals paid $0.40 discount fare on fixed route 3,640 ADA certified clients rode free on the fixed route. There were 1,941 wheelchair passengers, 6,906 bike riders. Five complaints filed through LISTEN complaint system: 2-late driver, 1-vehicle no show, 1 -operator attitude, and 1 -reckless and rude operator.

18 Paratransit Report Trips requested = 22,806 Trips Completed = 16,249
Operations December2016 Paratransit Report Trips requested = 22,806 Trips Completed = 16,249 Total Passengers = 16,495 Hours = 10,843 On-Time Performance 83.09% Trips Cancelled = 6,551 Trips Denied = 0 Active Clients = 1,148

19 INFRASTRUCTURE DEPARTMENT
Operations Committee Meeting – January 12, 2017

20 Capital Projects Update
STUDY / ANALYSIS PROJECTS: Downtown Transit Center Alternative Analysis St. Charles Streetcar Line ADA Accessibility Analysis Water Leak Mitigations (Randolph and ENO Facilities) Algiers Park and Ride Lighting Repair Assessment (FEMA) Facility Restoration Assessment

21 Capital Projects Update
ENGINEERING PROJECTS (FOR FUTURE CONSTRUCTION): Carrollton / Claiborne Special Track Replacement (St. Charles Streetcar Line) Napoleon Facility Renovation Philip Randolph Facility – Electrical Modifications ENO Bus Wash Slab Replacement UPT Bus Canopy Lighting Ferry Project Ferry Terminal Badine St. Bus Terminal Riverfront Streetcar Upriver Connector Ferry Project – Passenger Ferry Vessels

22 Capital Projects Update
CONSTRUCTION PROJECTS: Rampart / St. Claude Streetcar Expansion Carrollton Barn Renovation Cemeteries Transit Center Streetcar Expansion FUTURE PROJECTS UNDER EVALUATION: Streetcar Expansion – Riverfront to St. Claude & Elysian Fields to Press St. Howard Avenue Connector between Loyola and St. Charles Streetcar Lines

23 Canal/Algiers Point and Lower Algiers/Chalmette Ferry Routes Financial and Operations Report For the Period January 1, 2016 through December 31, 2016 January 12, 2017

24 Statement of Expenses and Revenues
Ferry Operations Statement of Expenses and Revenues DECEMBER 2016 Fiscal year July 1, 2015—December 31, 2016 JULY August September October November December Total Expenses 487,759.37 1,232,104.09 514,991.54 372,811.25 381,666.98 718,063.85 Less Fares and Credits (159,089.86) (155,819.37) (117,056.61) (137,972.20) (143,414.18) (107,049.72) Transdev Net Billing 328,669.57 1,076,284.72 397,934.93 234,839.05 238,252.80 611,014.13 FY LADOTD Ferry Subsidy 530,975.41 4,872,736.99 3,736,079.89 3,308,895.03 3,031,862.70 2,769,698.12 Less Ferry diesel fuel provided by RTA (22,076.91) (24,352.38) (23,996.93) (37,320.28) (12,004.78) RTA Ferry Grant Revenues 29,967.00 144,080.00 21,016.00 19,491.00 47,626.00 Less RTA Grant Expenses (37,459.00) (180,100.00) (26,269.00) (24,364.00) (59,533.00) Less Transdev’s Net March 2016 Billing (328,669.51) (1,076,284.72) (397,934.93) (234,839.05) (238,252.80) Balance of LADOTD Subsidy 172,736.99 2,134,772.21

25 January 1, 2016 through December 31, 2016
Ferry Operations RIDERSHIP January 12, 2017 January 1, 2016 through December 31, 2016 Algiers Point/Canal Street Lower Algiers/Chalmette Date Pedestrians Scooters Total Vehicles Jan-16 37,657 30 37,687 381 22,856 23,237 *Feb-16 75,696 (1) 69 75,765 397 26,536 26,933 Mar-16 46,971 97 47,068 359 27,479 27,838 Apr-16 77,303 (2) 81 77,384 280 23,824 24,104 May-16 52,729 90 52,819 405 27,787 28,192 Jun-16 50,095 (3) 80 50,175 420 26,738 27,158 Jul-16 56,231 (3)(4) 96 56,327 360 Aug-16 34,579 93 34,672 457 27,961 28,418 Sep-16 33,717 65 468 26,440 26,908 Oct-16 49,467 84 49,462 467 26,892 27,359 Nov-16 39,490 49 39,539 321 25,570 25,891 Dec-17 38,102 47 38,149 243 22,678 22,891 (1) Mardi Gras - Saturday, February 6, 2016 through Tuesday, February 9, ,733 (2) French Quarter Festival, Thursday April 7-10, 2016 (3) Wednesday's on the Point (June 1, 8, 15, 22, 29 and July 6) (4) July 4th Fireworks (5) Algiers Barn Fire & Concert (December 3, 2016) (6) New Year's Eve Fireworks on the River (December 31, 2016)

26

27 MARKETING AND COMMUNICATIONS UPDATE
January 12, 2017

28 Marketing Update 2016 EARNED MEDIA PERFORMANCE 1,491 News stories
Total Nielsen Audience of 871,647, 981 Ad Value of $910,869 Publicity Value of $4,325,594 2016 DIGITAL PERFORMANCE Website 13,193,045,578 Website Page Views New website launched December 12, Visit to view. Twitter 2,073 tweets posted 15,013 Profile Visits 798,500 Impressions

29 Marketing Update 2016 COMMUNITY ENGAGEMENT
54 Community meetings held or attended by RTA. This does not include project specific meetings, i.e., Rampart monthly meetings. 2016 REVENUE SALES Streetcar Charters $81,250 revenue generated Film/Photography $177,558 revenue earned E-Commerce $2,336,072 of revenue generated GoMobile $543,621 of revenue generated

30 Cleaner, Smarter Transit.
THE END @NewOrleansRTA


Download ppt "Operations and Administration Committee Meeting| January 12, 2016"

Similar presentations


Ads by Google