Presentation is loading. Please wait.

Presentation is loading. Please wait.

Date of download: 11/7/2017 Copyright © ASME. All rights reserved.

Similar presentations


Presentation on theme: "Date of download: 11/7/2017 Copyright © ASME. All rights reserved."— Presentation transcript:

1 Date of download: 11/7/2017 Copyright © ASME. All rights reserved. From: Tool Wear Monitoring and Alarm System Based on Pattern Recognition With Logical Analysis of Data J. Manuf. Sci. Eng. 2015;137(4): doi: / Figure Legend: Schematic diagram of experimental setup

2 Date of download: 11/7/2017 Copyright © ASME. All rights reserved. From: Tool Wear Monitoring and Alarm System Based on Pattern Recognition With Logical Analysis of Data J. Manuf. Sci. Eng. 2015;137(4): doi: / Figure Legend: Forces directions during turning

3 Date of download: 11/7/2017 Copyright © ASME. All rights reserved. From: Tool Wear Monitoring and Alarm System Based on Pattern Recognition With Logical Analysis of Data J. Manuf. Sci. Eng. 2015;137(4): doi: / Figure Legend: Wear classification and failure threshold

4 Date of download: 11/7/2017 Copyright © ASME. All rights reserved. From: Tool Wear Monitoring and Alarm System Based on Pattern Recognition With Logical Analysis of Data J. Manuf. Sci. Eng. 2015;137(4): doi: / Figure Legend: Schematic diagram for LAD online alarm system

5 Date of download: 11/7/2017 Copyright © ASME. All rights reserved. From: Tool Wear Monitoring and Alarm System Based on Pattern Recognition With Logical Analysis of Data J. Manuf. Sci. Eng. 2015;137(4): doi: / Figure Legend: Online alarm system front panel

6 Date of download: 11/7/2017 Copyright © ASME. All rights reserved. From: Tool Wear Monitoring and Alarm System Based on Pattern Recognition With Logical Analysis of Data J. Manuf. Sci. Eng. 2015;137(4): doi: / Figure Legend: Replacement decision for PHM-model and LAD alarm (r = 2). (a) PHM decision and LAD alarm decision for tool 1-5, (b) PHM decision and LAD alarm decision for tool 2–5, (c) PHM decision and LAD alarm decision for tool 3–6, (d) PHM decision and LAD alarm decision for tool 4–6, (e) PHM decision and LAD alarm decision for tool 5–6, and (f) LAD alarm decision for five tools LAD alarm.


Download ppt "Date of download: 11/7/2017 Copyright © ASME. All rights reserved."

Similar presentations


Ads by Google