Download presentation
Presentation is loading. Please wait.
1
Hurricane Preparedness Plan 2008
Florida Power & Light Company May 1, 2008
2
2008 Preparations FPL’s Hurricane Preparedness Plan
Strengthen the Infrastructure Prepare the Storm Organization Refine the Restoration Plan Enhance Communications Infrastructure Communication Organization Restoration
3
Strengthen the Infrastructure Distribution - Hardening
3 – Prong Approach 2007 2008 CIF Acute Care Highway Crossings “01 Switches” Community Projects 34 21 Joint Pole Owners/Attachers Infrastructure Communication Organization Restoration
4
Strengthen the Infrastructure Transmission - Hardening
Replace Single Pole Un-guyed Wood Structures 2007 – 339 2008 – 294 Replace Ceramic Post Insulators 2007 – 773 2008 – 445 Expand Hardening Strategy – Upgrade All Wood Structures to Current Standards Upgrade 800+ Wood Structures in 2008 Infrastructure Communication Organization Restoration
5
Strengthen the Infrastructure Distribution – Pole Inspections
FPL Owns Over 1.1 Million Poles Completed Over 140,000 in 2007; Same for 2008 Working Throughout Entire FPL System Working with Joint Pole Owners Infrastructure Communication Organization Restoration
6
Strengthen the Infrastructure Transmission - Inspections
64,000 Structures System-Wide Inspected Over 13,500 Structures in 2007 Before June 1, 2008, Inspect All Critical 500kV Lines & Facilities Serving Distribution CIF Projects Complete at Least 1/6th of System in 2008 Infrastructure Communication Organization Restoration
7
Strengthen the Infrastructure Distribution – Vegetation Mgmt.
Feeders - 3-year Average Trim Cycle Laterals - 6-year Average Trim Cycle Before June 1 - Clear Top CIF Encourage Right Tree Right Place Infrastructure Communication Organization Restoration
8
Strengthen the Infrastructure Transmission – Vegetation Mgmt.
2007 Completed Clearing on 100% of FPL’s Transmission Right of Way 2008 Complete Clearing on 100% of FPL’s Transmission Right of Way Infrastructure Communication Organization Restoration
9
Preparing the Storm Organization
Roles Identified and Staffed Training Updated Training Conducted Forensic Teams Infrastructure Communication Organization Restoration
10
Refine the Restoration Plan
Main Objective - Safely Restore in the Shortest Time Resource Plans in Place Logistics Foreign Utilities & Contract Crews Inventories Improved Systems Refined Recovery Plan Infrastructure Communication Organization Restoration
11
Enhance Communications
FPL / County EOC Meetings Increased Governmental & Community Communications More Accurate Estimated Restoration Times Infrastructure Communication Organization Restoration
12
Areas of Concern or Vulnerability
Hardening - Multi-Year Effort Multiple Storms Catastrophic Storms Insufficient Resources Infrastructure Communication Organization Restoration
13
Summary Infrastructure Strengthened Organization Prepared
Hardening; Vegetation; Pole Inspections Organization Prepared Trained and Ready Restoration Plan Tested/Refined Lessons Learned; Technology; Forensics Communications Enhanced Better Information Infrastructure Communication Organization Restoration
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.