Development of the pellet target in ITEP
M.Büscher, A.Gerasimov, V.Chernetsky, P.Fedorets, A.Dolgolenko, V.Balanutsa, L.Gusev, S.Mineev, S.Podchasky, I.Tarasenko, P.Balanutsa, V.Demekhin, S.Makagonov
2
Timelines for the test place in Moscow
2013 2014 Q1 Q2 Q3 Q4 Purchase of the equipment and manufacture details of target Assembling of the target Vacuum test Cold test Preparation stage for target in Moscow Q is finished: test place, frame for target, water, light, power supply, pumping out lines, drawings, purchase of equipment, production of details, 3 PC for data taking and operation. Assembling stage and vacuum tests Q Q are going on.
3
Assembling stage for target Q4 2013- Q2 2014
Already done: Assembling of cryostat, installation of cryo-cooler, assembling full vacuum pumping system, temperature and pressure sensors are installed, leakage tests for cryostat and vacuum system (10-7 mbar), commissioning of cryo-cooler. Recently done: Gas supply system is assembled and tested for leakages. New type of condenser is produced, assembled and tested for leakages New generator New skimmer Going on: Assembling of the internal parts. The regular low temperature tests (without cooled gas) after installation of each internal part. Minimization of radiation heating. Maximization of transfer of the cooling power. Installation of the new adjustment system. Installation of the gas supply lines inside the cryostat.
4
Assembling stage for target Q4 2013- Q2 2014
Gas supply system
5
Assembling stage for target Q4 2013- Q2 2014
Installation of new adjustment system Upper part of the system New type of the condenser Lower part of the system
6
Assembling stage for target Q4 2013- Q2 2014
New skimmer Skimmer inlet with shielding Skimmer outlet New flange
7
Other activities and tests in Juelich
Investigation of glues and technologies for cryogenic usage for nozzles. Tests of glues with first pellet target version in IKP. Preliminary of results of tests: Bad results for Stycast, promising results for UHU Stycast UHU
8
Other activities and tests in Juelich
Methods and constructions for production of extra thin jets and droplets (Ø ≤ 15 µm). Experimental studies in IKP. Mini triple point chamber Produced for tests in IKP in June 2014 mini triple point chambers Generator with glued nozzle