Presentation is loading. Please wait.

Presentation is loading. Please wait.

Error Budget Calculation

Similar presentations


Presentation on theme: "Error Budget Calculation"— Presentation transcript:

1 Error Budget Calculation
OFFRE XXXX Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas Error Budget Calculation PM# September 2006

2 Pointing Error - Approach
OFFRE XXXX Error Budget Calculation without metrology correction: Pointing Error Pointing Error - Approach Geometrical ray tracing, by means of CODE-V, is used to calculate pointing error. Diffraction is taken into account to determinate energy centroid. The displacements of the nodes representing the optical elements of the antenna and the rotations of the frames associated to them are determined by thermo-elastic analysis. Displacements and rotations are applied in the CODEV model and results are shown. The optical model treats the main reflector as a rigid body, but its translations/rotations introduced in CODE-V are derived from the parabolic best fit of the deformed surface of the paraboloid computed with FEM analysis (Levy’s procedure).

3 Pointing Error – Wind component
OFFRE XXXX Error Budget Calculation without metrology correction: Pointing Error Pointing Error – Wind component

4 Pointing Error – Weighted wind component
OFFRE XXXX Error Budget Calculation without metrology correction: Pointing Error Pointing Error – Weighted wind component RMS errors are compared with EIE’s output

5 Error Budget Calculation without metrology correction: Pointing Error
OFFRE XXXX Error Budget Calculation without metrology correction: Pointing Error Ray Tracing approach – code V Analytical approach- Ruze equations RMS errors are compared with EIE’s output

6 The above RMS errors are compare with those obtained by EIE
OFFRE XXXX Error Budget Calculation without metrology correction: Pointing Error The above RMS errors are compare with those obtained by EIE Differences between EIE and AAS-I are < 1% (0.17%!) Complete convergence is being checked for all the remaining budgets Some details of the FEM model require fine adjustments


Download ppt "Error Budget Calculation"

Similar presentations


Ads by Google