1 ELCITA UPDATE SEPTEMBER 2017

2 Estate Management Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc at West Phase West Avenue 1 –Infosys avenue – 17 Nos West Avenue 2 – Velankani Road Nos West Avenue 6 – Teknic to Wipro Gate 5 – 16 Nos West Avenue 8 – Pump house Road Nos West Avenue 9 – Petrol Bunk Road – 18 Nos TOTAL = 107 Nos Installation of New Street light pole at East Phase East Avenue 1– Print to Tech Mahindra Rear Gate Nos East Avenue 4 – Shanthipura Road – 14 Nos TOTAL = 24 Nos

3

4 Estate Management 3. Pavement with Tiles Completed = 900 Sqm 4. Pavement with Pavers Completed = 2500 Sqm 5. Road Asphalting works = 5.30 Kms (Work not yet started due to Continuous Rainfall) 6. Foot Over Bridge – BETPL Approval forwarded to NHAI, Final Approval from NHAI is awaited. 7. House Keeping Tender Documents forwarded to Financial Consultant (Mr.Nagaraj) for final verification.

5 East Avenue-2 (Xime Road)
Footpath Work – Under Progress East Avenue-4 (Shanthipura Road) East Avenue-2 (Xime Road)

6 Footpath Work – Completed
West Avenue-8 (Near Pump House) East Lane-2 (Quasitum Road)

7 West Lane-7 (Amphenol Road)
Road Widening – Completed West Lane-7 (Amphenol Road)

8 East Avenue-1 (TCS Road)
Road Widening – Completed East Avenue-1 (TCS Road)

9 West Avenue-9 (MRO Tek side)
Footpath Work – Under Progress West Avenue-9 (NRN Holdings side) West Avenue-9 (MRO Tek side)

10 Footpath Work – Under Progress
Drain Cleaning at East Avenue-4 (Shanthipura Road) Pavers Laying opp Pump house

11 Footpath Work – Under Progress
RCC Culvert East Avenue-4 (Near Continental) Foundation for UPS (Pump house)

12 5 Way RMU Installed in the Electrical Yard of MGM & Amitronics
Electrical Work – Completed 5 Way RMU Installed in the Electrical Yard of MGM & Amitronics

13 14 No’s ONT Installed and Working
Midspan of Single Fibre, ONT & Camera Installation 14 No’s ONT Installed and Working Optical Splitter installed for ONT connection Camera installation in progress

14 TOWN PLANNING 5 Details FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17
Khatha 6 18 12 11 Building License 3 13 22 31 Commencement Certificate 1 4 7 17 5 Occupancy Certificate Nil

15 E- waste collected from the following companies in September
SUSTAINABILITY E- waste collected from the following companies in September Compost Sold Xysis Ishwarya Hi Tech Outsiders Flextronics Exa Thermometrics ELCITA Trust Hical ELCITA Garden Total compost sold is 656 Kgs Amphenol Lemon Tree hotel Hical Technologies ISBR Institute Svenska design hotel Total E- waste picked up is 650 Kg’s

16 SUSTAINABILITY Analytics and charts on Zoho software for 300 KLD STP. Data generated from Zoho software for billing and analysis from September.

17 SUSTAINABILITY Training of Wellingkar students on waste management.
E- waste management awareness program at STPI

18 Used Pavers re-laid at SWM facility..
SUSTAINABILITY Used Pavers re-laid at SWM facility.. SWM authorization for 5 years from KSPCB.

19 Contract Awarded Providing and laying of Asphalting using 60/70 grade bitumen from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase. – Work not yet started due to Continuous Rainfall.

20 Tender Evaluation Completed
Replacing Existing 6 Way old type MEI make conventional type RMU by 6 Way Compact type Schneider RMU DAS specification for F-5 Feeder Eminating from Keonics Muss near M/s BHEL Ltd, Electronics City West Phase, Bangalore Providing and Laying Asphalting grade bitumen from 3m Junction to Petrol Bunk Junction, West Lane 6 and West Avenue 9, Electronics City West Phase, Bangalore Providing & Laying Asphalting grade bitumen along West Lane 7, 8,9 and 10, West Avenue 11 Electronics City West Phase, Bangalore Providing & Laying Asphalting grade bitumen from Konar to KPTCL, West Avenue 3 and 5 Electronics City West Phase, Bangalore Providing & Laying Asphalting grade bitumen along East Avenue 5 Electronics City West Phase, Bangalore

21 Tender Under Evaluation
Shifting of Pole, Erecting of Spun Pole, Relocation of Transformer & Raising of Transformer by installing new Spun Pole for Junction Improvements at 3m & BHEL Side, Electronics City West Phase, Bangalore

22 Contracts on Anvil Providing House Keeping Services to ELCITA within e-city Industrial Township Area. Providing Services for Solid Waste Management  to ELCITA within e-city Industrial Township Area. Providing Services for lifting sewage/Treated water by using Tanker Vehicle within e-city Industrial Township Area. 4.Construction of 400 KLD STP in KSSIDC Land, West Phase. 5. Construction of 500 KLD STP in KIADB Land, East Phase.