Pre-Proposal Conference
Request for Qualifications for ON-GOING PROFESSIONAL SERVICES
2
Welcome Michael Carmagnola, Project Management and Construction Services Director Neil Crump, Interim Contract Manager Request for Qualifications and Contract Details Submission Details Muriel Kruse, HUB Staff Associate HUB Details Senior Project Managers Available for questions and answers
3
Agenda Overview Request for Qualifications (RFQ)
Types of Projects University of Texas Campuses Request for Qualifications (RFQ) Due Dates Contacts Points in the Contract Review of RFQ Electronic Submission Requirements HUB Submission Requirements
4
Changes from Previous Requests for Qualifications (RFQs)
Overview Request for Qualifications intent for Professional Services for Architectural/engineering firms and Engineering/architectural firms Changes from Previous Requests for Qualifications (RFQs) Previous RFQs Current RFQ 23 Disciplines and solicited all at once Collapsed Disciplines: 4 Rounds of solicitations Submission with sub-consultants Prime firms that only have current in-house capabilities (Sub-consultants as project needs require) Hard copy submissions Only Electronic submissions Second Change Note: Sub-consultants as project needs require
5
4 Rounds of Request for Proposals
Discipline RFQ Posting Other: Interior Design Environmental Survey, Testing, Design and/or Monitoring Fire Alarm Engineering Fire Sprinkler Engineering Testing, Adjusting & Balancing Fire and Life Safety Code Compliance Fire Alarm and Sprinkler Third Party Testing Project Commissioning TDLR RAS Review Signage/Wayfinding Design January – February 2017 Engineering March - April 2017 Architecture August - September 2017
6
Types of Projects Section 2.3.1 Section 2.3.2 ENGINEERING PROJECTS
RFQ Reference: Section 2.3.1 ARCHITECTURAL PROJECTS Section 2.3.2 ENGINEERING PROJECTS Details available for each type of project are in the RFQ $10M Delegation in 2016
7
University of Texas at Austin Campuses
Original UTA 40-Acres – Now Acres JJ Pickle Research Campus Brackenridge Tract Montopolis Research Center Johnson Wildflower Center Bee Cave Research Center Marine Science Institute – Port Aransas, Texas Winedale Historical Center – Round Top, Texas J Frank Dobie Paisano Ranch Sam Rayburn Library – Bonham, Texas Garner Library – Uvalde, Texas McDonald Observatory – Fort Davis, Texas
8
RFQ available for download at
9
Due Dates Addenda Requests for Information (RFIs) are due:
January 3, 2017 by Noon Any questions asked today must follow-up with for Addendum issuance to be considered as part of the RFQ -Planned Addendum date 1/6/2017 Proposals (Submission Documents #1 and #2) due: January 18, 2017 by 3:00PM Planned Addendum date 1/6/2017 --add to calendar
10
Contacts for the Request For Information (RFI)
RFQ Neil Crump HUB Muriel Kruse Electronic Submission Gary Magretto
11
On-Going Service Provider Contract
Initial One-Year with Five (5) Option Renewals Review Contract which is included in RFQ – no revision of terms permitted Successful respondents of this round need not submit for future rounds scheduled later in 2017
12
Review of RFQ Sections Which sections are to be submitted? Section 4
Section 5, which includes the HUB documents Much to Must in Bookmark
13
HUB Documentation HUB documents for submission
Section 5, which includes the HUB documents HUB documents for submission No sub-consultants considered for RFQ submission HUB Plan on per project basis for contracts over $100K Exhibit H included in RFQ for future use on per project needs
14
Submittal Instructions
Where are the instructions for submitting documents for the RFQ? Section 3 Formatting Instructions
15
Submission Main Points
Requirement Section in RFQ Submit two (2) separate .pdf document submissions each for Section 4 and Section 5 Section 3.2.1 Size 15MB limit for each .pdf Use Firm Naming Standard Section 3.2.5 Section 4 and Section 5 responses shall include required Adobe bookmarks Section & Section 3.2.4 submissions must be from the same address within the firm Section 3.3.1 Submit both sections separately to Section 3.3.3 PMCS acknowledgement of submission receipts* Section 3.3.4 Failure to submit per RFQ requirements shall disqualify for consideration Section 3.1.7 Highlight in RFQ *Please note you may not receive a submission receipt during the dates of Dec. 23rd thru Dec. 30th due to the holiday break.
16
Any Questions?
17
Thank you for joining us!