1 LHC-TS3 Coordination meeting #3
27th October, 2016 AGENDA LHC-TS3 preparation – Marzia Bernardini AOB

2 Intervention on 400 kV substation in Bois-Tollot
LHC machine Schedule for LHC TS EDMS ; INDICO

3 Intervention on 400 kV substation in Bois-Tollot
LHC machine Schedule for LHC TS EDMS ; INDICO

4 Intervention on 400 kV substation in Bois-Tollot
LHC machine Schedule for LHC TS EDMS ; INDICO

5 Impact of the 400 kV intervention
6h electrical cut LHC Machine network General services ON No operation in Injectors and Experimental Areas NO ACCESS in all LHC  2nd November No ventilation conditions Lost of Cryo conditions ElQA 13 kA test in 6 sectors (23, 34, 45, 56, 67, 78 & 81) ElQA DSLC test in LSS3R All the LSS empty (Inner triplets, DFBs, SAM) LHC machine Schedule for LHC TS EDMS ; INDICO

6 Options concerning the TS3
OPTION 1  Obsolete  no intervention on 400 kV OPTION 2 2.a Intervention on Monday 31st  Obsolete 2.b Intervention on Wednesday 2nd November  ACTUAL Intervention on 400 kV network. Power cut ~6h Temperature at the bottom of the DFBAs HCM> 100 K, and DSLC T>100K ELQA needed on all Sectors (except S. 1-2) OPTION 3  Potential Intervention on 400 kV network, with reduced duration of the power cut Temperature at the bottom of the DFBAs HCM< 100 K, and DSLC T<100K  ELQA not needed M. Bernardini - LMC 26th October 2016

7 M. Bernardini - LMC 26th October 2016
LMC 31st August “Conclusions of the task force setup to recommend the best procedures for ELQA testing after temperature excursions above 80 K in DFBs & DSLs” , A. Perin. M. Bernardini - LMC 26th October 2016

8 M. Bernardini - LMC 26th October 2016
Option 2b - ACTUAL 400kV power cut on Wednesday 2nd November duration >6h Temperature at the bottom of the DFBAs HCM> 100 K, and DSLC T>100K ELQA needed on all Sectors (except S. 1-2) Empty the LSSs, DFBs, SAM and Inner Triplets of Lhe (Monday 31st) Reduce the consumptions on the machine network Electrical power cut of 400 kV from RTE Wednesday ~ 6h NO ACCESS on the whole LHC Recovery of cryogenics conditions, progressively, from Friday midday on ELQA tests on 13kA and DSLC circuits  4 days Duration from Monday 31st October to Tuesday 8th November, afternoon M. Bernardini - LMC 26th October 2016

9 M. Bernardini - LMC 26th October 2016
Option 2b  ACTUAL ELQA ELQA ELQA ELQA ELQA ELQA ELQA M. Bernardini - LMC 26th October 2016 ELQA

10 DFBAs temperature vs time
M. Bernardini - LMC 26th October 2016

11 M. Bernardini - LMC 26th October 2016
Option 3 - Potential 400kV power cut on Wednesday 2nd November Temperature at the bottom of the DFBAs HCM< 100 K, and DSLC T<100K Empty the LSSs, DFBs, SAM and Inner Triplets of Lhe (Monday 31st) Reduce the consumptions on the machine network Electrical power cut of 400 kV from RTE Wednesday – NO ACCESS on the whole LHC Recovery of cryogenics conditions, progressively, from Friday midday on No ELQA tests needed M. Bernardini - LMC 26th October 2016

12 M. Bernardini - LMC 26th October 2016
Option 3 - Potential RF RF M. Bernardini - LMC 26th October 2016

13 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
General reminders – TS3 All LOCK OUT requests via Impact LHC- TS3 activities:  from Monday 31st 6am, to Friday 4th 5pm  Exceptional activities as ELQA, lock/un-lockout, RF conditioning & CV maintenance can continue until the end of the technical stop The LHC machine will be in Automatic Restricted Mode Piquet’s phone number: from Monday 31st to Friday 4th INDICO: (LHC-TS3) OSS website (planning, constraints…): LHC machine Schedule for LHC TS EDMS ; INDICO

14 Radiological classification until end of 2016
permanent low-occupancy < 0.5 µSv/h < 2.5 µSv/h < 3 µSv/h < 15 µSv/h < 10 µSv/h < 50 µSv/h n/a < 2 mSv/h < 100 mSv/h > 100 mSv/h S. Roesler, LMC – 2016/10/5 LHC machine Schedule for LHC TS EDMS ; INDICO

15 Access conditions related to Cryo
LHC machine Schedule for LHC TS EDMS ; INDICO

16 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
Constraints LHC machine Schedule for LHC TS EDMS ; INDICO

17 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
Constraints LHC machine Schedule for LHC TS EDMS ; INDICO

18 Personal ODH MANDATORY
All points Personal ODH MANDATORY in the arc NO ACCESS Intervention 400kV LHC machine Schedule for LHC TS EDMS ; INDICO

19 Personal ODH MANDATORY
in the arc ZDC installation PM15 maintenance ZDC & LHCf installation LHC machine Schedule for LHC TS EDMS ; INDICO

20 Personal ODH MANDATORY
Arc12 – P18 – Ti2 Personal ODH MANDATORY in the arc Patrol PM18 Lift maintenance Patrol LHC machine Schedule for LHC TS EDMS ; INDICO

21 Personal ODH MANDATORY
in the arc PM25 Lift maintenance Patrol LHC machine Schedule for LHC TS EDMS ; INDICO

22 Personal ODH MANDATORY
Arc23 - P 3.2 Personal ODH MANDATORY in the arc Patrol PM32 Lift maintenance LHC machine Schedule for LHC TS EDMS ; INDICO

23 Personal ODH MANDATORY
P3 – Arc 34 Personal ODH MANDATORY in the arc PZ33 lift maintenance LHC machine Schedule for LHC TS EDMS ; INDICO

24 Personal ODH MANDATORY
in the arc PM/PZ45 Lift maintenance LHC machine Schedule for LHC TS EDMS ; INDICO

25 Personal ODH MANDATORY
Arc 45 – LSS5L Personal ODH MANDATORY in the arc Patrol ZDC + RPD installation LHC machine Schedule for LHC TS EDMS ; INDICO

26 Personal ODH MANDATORY
P5 – LSS5R Personal ODH MANDATORY in the arc Patrol PM56 lift maintenance ZDC installation LHC machine Schedule for LHC TS EDMS ; INDICO

27 Personal ODH MANDATORY
Arc56 - P6 Personal ODH MANDATORY in the arc Patrol PM/PZ65 Lift maintenance Powering Test s78 PHI Patrol LHC machine Schedule for LHC TS EDMS ; INDICO

28 Personal ODH MANDATORY
Arc67 - P7 Personal ODH MANDATORY in the arc Powering Test s78 PHII TBC PM76 maintenance LHC machine Schedule for LHC TS EDMS ; INDICO

29 Personal ODH MANDATORY
Arc78 Personal ODH MANDATORY in the arc Powering Test s78 PHII LHC machine Schedule for LHC TS EDMS ; INDICO

30 Personal ODH MANDATORY
in the arc Patrol PM85 Lift Maintenance Powering Test s78 PHII LHC machine Schedule for LHC TS EDMS ; INDICO

31 Personal ODH MANDATORY
Arc 81 – TI8 Personal ODH MANDATORY in the arc Patrol Powering Test s78 PHII LHC machine Schedule for LHC TS EDMS ; INDICO

32 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: BE @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO

33 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: HSE @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO

34 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: EN-CV @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO

35 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: EN-EL @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO

36 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: EN @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO

37 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: EP & IT @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO

38 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: TE-VSC @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO

39 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: TE @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO

40 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
Lock-out requests Waiting Lockout Approval @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO

41 No meeting next week due to LHC-TS3
Next meetings No meeting next week due to LHC-TS3 Next meeting Thursday 10th November, Room From 9h00 to 10h30 AGENDA: EN-ACE-CL – Anne Laure Perrot TE-CRG – Cryogenics lock out – Antonio Perin BE-OP – Mirko Pojer HSE-RP –Christophe Tromel LHC machine Schedule for LHC TS EDMS ; INDICO