LHC-TS3 Coordination meeting #3
27th October, 2016 AGENDA LHC-TS3 preparation – Marzia Bernardini AOB
2
Intervention on 400 kV substation in Bois-Tollot
LHC machine Schedule for LHC TS EDMS ; INDICO
3
Intervention on 400 kV substation in Bois-Tollot
LHC machine Schedule for LHC TS EDMS ; INDICO
4
Intervention on 400 kV substation in Bois-Tollot
LHC machine Schedule for LHC TS EDMS ; INDICO
5
Impact of the 400 kV intervention
6h electrical cut LHC Machine network General services ON No operation in Injectors and Experimental Areas NO ACCESS in all LHC 2nd November No ventilation conditions Lost of Cryo conditions ElQA 13 kA test in 6 sectors (23, 34, 45, 56, 67, 78 & 81) ElQA DSLC test in LSS3R All the LSS empty (Inner triplets, DFBs, SAM) LHC machine Schedule for LHC TS EDMS ; INDICO
6
Options concerning the TS3
OPTION 1 Obsolete no intervention on 400 kV OPTION 2 2.a Intervention on Monday 31st Obsolete 2.b Intervention on Wednesday 2nd November ACTUAL Intervention on 400 kV network. Power cut ~6h Temperature at the bottom of the DFBAs HCM> 100 K, and DSLC T>100K ELQA needed on all Sectors (except S. 1-2) OPTION 3 Potential Intervention on 400 kV network, with reduced duration of the power cut Temperature at the bottom of the DFBAs HCM< 100 K, and DSLC T<100K ELQA not needed M. Bernardini - LMC 26th October 2016
7
M. Bernardini - LMC 26th October 2016
LMC 31st August “Conclusions of the task force setup to recommend the best procedures for ELQA testing after temperature excursions above 80 K in DFBs & DSLs” , A. Perin. M. Bernardini - LMC 26th October 2016
8
M. Bernardini - LMC 26th October 2016
Option 2b - ACTUAL 400kV power cut on Wednesday 2nd November duration >6h Temperature at the bottom of the DFBAs HCM> 100 K, and DSLC T>100K ELQA needed on all Sectors (except S. 1-2) Empty the LSSs, DFBs, SAM and Inner Triplets of Lhe (Monday 31st) Reduce the consumptions on the machine network Electrical power cut of 400 kV from RTE Wednesday ~ 6h NO ACCESS on the whole LHC Recovery of cryogenics conditions, progressively, from Friday midday on ELQA tests on 13kA and DSLC circuits 4 days Duration from Monday 31st October to Tuesday 8th November, afternoon M. Bernardini - LMC 26th October 2016
9
M. Bernardini - LMC 26th October 2016
Option 2b ACTUAL ELQA ELQA ELQA ELQA ELQA ELQA ELQA M. Bernardini - LMC 26th October 2016 ELQA
10
DFBAs temperature vs time
M. Bernardini - LMC 26th October 2016
11
M. Bernardini - LMC 26th October 2016
Option 3 - Potential 400kV power cut on Wednesday 2nd November Temperature at the bottom of the DFBAs HCM< 100 K, and DSLC T<100K Empty the LSSs, DFBs, SAM and Inner Triplets of Lhe (Monday 31st) Reduce the consumptions on the machine network Electrical power cut of 400 kV from RTE Wednesday – NO ACCESS on the whole LHC Recovery of cryogenics conditions, progressively, from Friday midday on No ELQA tests needed M. Bernardini - LMC 26th October 2016
12
M. Bernardini - LMC 26th October 2016
Option 3 - Potential RF RF M. Bernardini - LMC 26th October 2016
13
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
General reminders – TS3 All LOCK OUT requests via Impact LHC- TS3 activities: from Monday 31st 6am, to Friday 4th 5pm Exceptional activities as ELQA, lock/un-lockout, RF conditioning & CV maintenance can continue until the end of the technical stop The LHC machine will be in Automatic Restricted Mode Piquet’s phone number: from Monday 31st to Friday 4th INDICO: (LHC-TS3) OSS website (planning, constraints…): LHC machine Schedule for LHC TS EDMS ; INDICO
14
Radiological classification until end of 2016
permanent low-occupancy < 0.5 µSv/h < 2.5 µSv/h < 3 µSv/h < 15 µSv/h < 10 µSv/h < 50 µSv/h n/a < 2 mSv/h < 100 mSv/h > 100 mSv/h S. Roesler, LMC – 2016/10/5 LHC machine Schedule for LHC TS EDMS ; INDICO
15
Access conditions related to Cryo
LHC machine Schedule for LHC TS EDMS ; INDICO
16
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
Constraints LHC machine Schedule for LHC TS EDMS ; INDICO
17
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
Constraints LHC machine Schedule for LHC TS EDMS ; INDICO
18
Personal ODH MANDATORY
All points Personal ODH MANDATORY in the arc NO ACCESS Intervention 400kV LHC machine Schedule for LHC TS EDMS ; INDICO
19
Personal ODH MANDATORY
in the arc ZDC installation PM15 maintenance ZDC & LHCf installation LHC machine Schedule for LHC TS EDMS ; INDICO
20
Personal ODH MANDATORY
Arc12 – P18 – Ti2 Personal ODH MANDATORY in the arc Patrol PM18 Lift maintenance Patrol LHC machine Schedule for LHC TS EDMS ; INDICO
21
Personal ODH MANDATORY
in the arc PM25 Lift maintenance Patrol LHC machine Schedule for LHC TS EDMS ; INDICO
22
Personal ODH MANDATORY
Arc23 - P 3.2 Personal ODH MANDATORY in the arc Patrol PM32 Lift maintenance LHC machine Schedule for LHC TS EDMS ; INDICO
23
Personal ODH MANDATORY
P3 – Arc 34 Personal ODH MANDATORY in the arc PZ33 lift maintenance LHC machine Schedule for LHC TS EDMS ; INDICO
24
Personal ODH MANDATORY
in the arc PM/PZ45 Lift maintenance LHC machine Schedule for LHC TS EDMS ; INDICO
25
Personal ODH MANDATORY
Arc 45 – LSS5L Personal ODH MANDATORY in the arc Patrol ZDC + RPD installation LHC machine Schedule for LHC TS EDMS ; INDICO
26
Personal ODH MANDATORY
P5 – LSS5R Personal ODH MANDATORY in the arc Patrol PM56 lift maintenance ZDC installation LHC machine Schedule for LHC TS EDMS ; INDICO
27
Personal ODH MANDATORY
Arc56 - P6 Personal ODH MANDATORY in the arc Patrol PM/PZ65 Lift maintenance Powering Test s78 PHI Patrol LHC machine Schedule for LHC TS EDMS ; INDICO
28
Personal ODH MANDATORY
Arc67 - P7 Personal ODH MANDATORY in the arc Powering Test s78 PHII TBC PM76 maintenance LHC machine Schedule for LHC TS EDMS ; INDICO
29
Personal ODH MANDATORY
Arc78 Personal ODH MANDATORY in the arc Powering Test s78 PHII LHC machine Schedule for LHC TS EDMS ; INDICO
30
Personal ODH MANDATORY
in the arc Patrol PM85 Lift Maintenance Powering Test s78 PHII LHC machine Schedule for LHC TS EDMS ; INDICO
31
Personal ODH MANDATORY
Arc 81 – TI8 Personal ODH MANDATORY in the arc Patrol Powering Test s78 PHII LHC machine Schedule for LHC TS EDMS ; INDICO
32
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: BE @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO
33
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: HSE @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO
34
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: EN-CV @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO
35
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: EN-EL @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO
36
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: EN @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO
37
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: EP & IT @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO
38
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: TE-VSC @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO
39
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
IMPACTS: TE @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO
40
LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970
Lock-out requests Waiting Lockout Approval @ Wednesday 26th LHC machine Schedule for LHC TS EDMS ; INDICO
41
No meeting next week due to LHC-TS3
Next meetings No meeting next week due to LHC-TS3 Next meeting Thursday 10th November, Room From 9h00 to 10h30 AGENDA: EN-ACE-CL – Anne Laure Perrot TE-CRG – Cryogenics lock out – Antonio Perin BE-OP – Mirko Pojer HSE-RP –Christophe Tromel LHC machine Schedule for LHC TS EDMS ; INDICO
Similar presentations