Presentation is loading. Please wait.

Presentation is loading. Please wait.

Standard Product Lead Times

Similar presentations


Presentation on theme: "Standard Product Lead Times"— Presentation transcript:

1 Standard Product Lead Times
Updated 6/8/2017 Standard Product Lead Times Special Finish / Custom Products (add to the Standard Lead times) Swing Stock 39” & 51” Surface Mount Only 1 week* Wet Paint + 7 weeks Swing Units 3 weeks Powder Paint Slide Units Special Anodize Swing Bifolds Clad Consult Factory Service Windows 4 weeks Wood Grain Elegant Slides 12-14 weeks Special Engineering Revolver Round/Segmented (Dark Bronze Only) 10-12 weeks Revolver Grand *Subject to prior sale – Please contact Customer Care for current inventory availability.


Download ppt "Standard Product Lead Times"

Similar presentations


Ads by Google