Download presentation
Presentation is loading. Please wait.
Published byAugustine Patterson Modified over 6 years ago
1
Reuters - on the left once you see this leaving Vesenaz
2
Two on each of two floors
Computer Room Layout Two on each of two floors Raised Computer Floor Air Conditioning UPS systems
3
Computer Room - Knurr Racks on GREY Tiles ONLY
4
Power Control and monitor - Amber, Blue, White
X / Y Room Coordinates
5
False Floor 80 cms deep Perforated for air Amber Power Line Blue Power Line Not perfect cabling!!
6
Standard Knurr Rack 6 Ventilators in sealed roof Tony
7
Backside of Rack Amber Power Blue Power Painted power sockets
8
Standard sized Hole
9
Air Intake Smoke Detection at aspiration
10
Two Supplies with manual switch Inergen Gas Bottles
11
Power Distribution Amber Blue
12
Emergency Power Off on leaving Computer Room
Smoke detection monitor similar to ours for STK silos
13
Noise Reduction in Air Conditioning Area
Very Effective Smoke Detection
14
Unpacking Equipment Waste Cardboard picked up by special service
15
Control and Security Room (24 Hours)
Power Indicators Room Cameras
16
Close Up
17
Backside of that control panel
18
Help Desk
19
This is what we want for Conference Rooms
Power and Network Socket
20
Computer Room Ceiling DRY Sprinklers Pipes ONLY filled with water
when smoke detected and sprinklers must operate
21
UPS system via MG set Fly Wheel maintain power for 4 seconds
Diesel cuts in after 1.8 seconds
22
Front Panel of Air Conditioning module
23
Our Hosts Where’s Anne ? Keith Cronshaw from Bellwater
Kristina Kamsaeter Tony Gilbert Banderet (Building Manager & designer) Where’s Anne ?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.