I-15 North Phase 4 Alternative 2

Similar presentations


Presentation on theme: "I-15 North Phase 4 Alternative 2"— Presentation transcript:

1 I-15 North Phase 4 Alternative 2
Value Engineering Study

2 Value Engineering Team
Laura Wise - Scoping Peter Aiyuk – Performance Analysis Casey Sylvester – Operations Analysis Gary Hourt - Architecture Dean De Carlo - Construction

3 Existing Project I-15 North at CC-215 Interchange
City of North Las Vegas New System to System Interchange Total Project Cost = $126,443

4 Pavement Advantages P1 - Eliminate open grade and substitute with a chip seal Less Material Used Less Expensive Material Requirement Consistent Maintenance costs between recommendations and original design Wearing course not necessary due to lack of plowing

5 Pavement Advantages P2 - Eliminate open grade
Less Material Used and Decreased Construction Time Comparable Performance Consistent Maintenance costs between recommendations and original design Wearing course not necessary due to lack of plowing

6 Pavement Cost Savings P1 - Eliminate Open Grade with a Chip Seal

7 Materials Advantages M1 – Utilize Innovative Embankment Materials
Reduces the cost of the embankment material Increases the performance Reduces the construction time Improves drainage Cost Savings $738,410

8 Conclusion VALUE ENGINEERING IS AWESOME!!!! Questions?