1 ELCITA UPDATE October 2016

2 Estate Management E – Toilets
16 e-toilets operational. 2 More E- Toilet Installation Work in Progress Estate survey Roads & common area survey completed for Phase 1& 2. Plot Inventory of the Industries 100 % completed. GIS Web Application Software Installed in ELCITA server. Acceptance check in progress.

3 West Avenue-7(Wipro Neeladri Road)
Road Works – Completed West Avenue-7(Wipro Neeladri Road)

4 West Lane-3 (JP IT Park Road)
Road Works – Completed West Lane-3 (JP IT Park Road)

5 Road Works – Completed 300 KLD STP Road

6 KSSIDC Complex Internal Road
Road Works – Under Progress KSSIDC Complex Internal Road

7 Drain Works – Under Progress
Drain Work along East Avenue-1 (TCS Road) SSM Drain work along West Avenue-5 (Ramakrishna Hospital)

8 Sewer Works – Under Progress
Construction of 80 KL Capacity Septic Tank (KSSIDC) & Sewer line work, West Avenue-10 (Canara bank road)

9 Drain Works – Completed
Drain Work along West Lane-1 (Goa Estate)  Drain work along West Avenue-9 (Celstream)

10 Drain Works – Completed
Drain work at KSSIDC Complex RCC Drain work along West Lane-6 (Ramsoft Road)

11 Misc Works – Under Progress
Kerbstone Painting along West Avenue-7 (Wipro Neeladri Road) Compound wall Work at KIADB land, East Phase

12 RCC Culvert along West Lane-1 (Opp. MSME Building)
RCC Culvert Works – Completed RCC Culvert along West Lane-1 (Opp. MSME Building) RCC Culvert over Storm water drain to continue the Footpath along West Avenue-8 (near Pumphouse)

13 6KL capacity Sump in KIADB land, East Phase
Water sump Works– Completed 6KL capacity Sump in KIADB land, East Phase

14 Footpath Works – Completed
Footpath work in front of Existing Petrol bunk gate, West Lane-1 Footpath work at KSSIDC Complex

15 Kerbstone Works – Completed
Kerbstone work for 300 KLD STP Road Kerbstone Raising work at KSSIDC Complex

16 RS Junction Improvement Works
Misc Works – Completed RS Junction Improvement Works

17 Misc Works – Completed Replacing the existing chamber cover with RCC heavy slab with Chequered Plate, Electronics City West Phase.

18 Forbes Marshall Multi parameter COD/BOD/PH/TSS Analyzer
Sustainability Projects Forbes Marshall Multi parameter COD/BOD/PH/TSS Analyzer Used to measure the quality of treated water before using it for irrigation, cleaning purposes or giving it to anyone else. The PCB has specified to test specific parameters such as COD/BOD/PH/TSS These parameters can be monitored online by us and CPCB Description Cost Unit Cost 16,30,000/- Software for CPCB connectivity & for data logging 1,50,000/- Cables etc (Approx) 20,000/- Total(Approx) 18,00,000/- Charges for Soft DAS for SPCB connectivity: 1,50,000 Extra when applicable The operating cost is limited to the refilling of the 2-litres tank of cleaning solution every 2 weeks with 5% Sulphuric acid on distilled water.

19 Sustainability Projects
RWH works – Under Progress SI.NO DESCRIPTION NO OF PITS STATUS 1 RAIN WATER HATVESTING PIT 48 COMPLETED 2 WORK IN PROGRESS

20 20 feet deep well Rainwater Harvesting Pit at Various locations

21 Estate Management Contract Awarded
Providing and laying of Asphalting using 60/70 grade bitumen along Café Corner & JP IT Park Road KSSIDC Complex Internal Roads

22 Estate Management Tender Published
Providing Security Services to ELCITA within Ecity Industrial Area. Providing and laying of Asphalting using 60/70 grade bitumen from Tech Mahindra to Malgudi MUSS via Tata BP Solar, Shanthipura, Edizi & Tescom, Electronics City East Phase. Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along Petrol Bunk Road & Golden Tulip Road.

23 Estate Management Contracts on Anvil
Providing House Keeping Services to ELCITA within Ecity Industrial Area. Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along XIME Road, Electronics City East Phase. Landscaping work below fly over & the median located in West & East Phase. Construction of 500 KLD STP in KIADB Land, Electronics City East Phase.