Download presentation
Presentation is loading. Please wait.
1
N. Blaskovic, T. Bromwich & G. Christian
ATF to-do list N. Blaskovic, T. Bromwich & G. Christian N. Blaskovic FONT Meeting
2
Contents On-shift to-do list Multi-board data synchronisation
Hardware and cable wish list N. Blaskovic FONT Meeting
3
To-do list Introduce delay cables after cavity to see if static erratic feature changes Diagnose IP BPM phase sensitivity Vary incoming LO phase Synchronously digitise bunch phase measured at stripline BPMs Once available, do IPC beamline tests N. Blaskovic FONT Meeting
4
Board synchronisation: option 1
Use FONT5 + FONT5A boards Run Doug’s ATF 2-board DAQ Observations: Empirically approximately synchronous Readbacks not available for FONT5A board SIS digitiser and ATF GUI not used N. Blaskovic FONT Meeting
5
Board synchronisation: option 2
Use FONT5A board + SIS digitiser Run standalone DAQ for FONT5A board Issue synchronisation signal upstream Observations: Integrates SIS digitiser operation Board synchronisation ensured Requires synchronisation signal to be sent to the IP and readback issued to Epics (Doug?) Requires ATF to save FONT Epics data N. Blaskovic FONT Meeting
6
Wish list 2 ZPULs (to replace broken ones)
Mechanical LO phase shifter (slide 3) BNC-BNC cables 3 meter long SMA-SMA cables Long cables to delay cavity signals (slide 3) SMA-BNC connectors N. Blaskovic FONT Meeting
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.