Download presentation
Presentation is loading. Please wait.
1
Task Group 19LH Liner Hanger Equipment
George Givens Weatherford June 27, 2017 Subcommittee 19
2
Task Group 19LH Group Name: Liner Hanger Equipment
Chair: George Givens Number of Standards and RPs: 1 Standard Current Status: 2 of the negative ballot votes changed to affirmative allowing the ballot to pass Comments (914) addressed, recirculated and returned Currently working through about 25 comments from the recirculation Meetings in last 12 months: 6 meetings / 11 meeting days June 27, 2017 Subcommittee 19
3
Manufacture / Supplier
19LH Task Group Meetings Meeting Location Manufacture / Supplier Consultants Operator/User API Staff Total Number 7/8/2016 Shell 7 1 3 12 12/7/2016 BP 8 18 12/8/2016 13 22 1/10/2917 Weatherford 11 16 1/11/2017 10 2 14 2/14/2017 McCalvin ENT 5 21 2/15/2017 3/29/2017 Chevron 9 4 3/30/2017 5/9/2017 17 5/10/2017 6 June 27, 2017 Subcommittee 19
4
API 19LH Ballot Participating Companies
Anadarko Baker Hughes BHP BP Chevron Dril-Quip ExxonMobil Halliburton Hess McCalvin Enterprises Mechanical Testing Services Schlumberger Shell Statoil TIW Weatherford
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.