Presentation is loading. Please wait.

Presentation is loading. Please wait.

MCC TF160 Status Report (Pre-RAN5#75)

Similar presentations


Presentation on theme: "MCC TF160 Status Report (Pre-RAN5#75)"— Presentation transcript:

1 MCC TF160 Status Report (Pre-RAN5#75)
Olivier Genoud Task Force 160 Leader, 3GPP MCC

2 Progress – TTCN development (March-->May’17)
Completed: LTE: SC-PTM Band 70 IMS: IMS emCall when roaming Started: LAA Band 41 PC2 CA new Rel-14 BCs feMDT Progressed: NB-IoT LTE: Bands>64 D2D ProSe Dual Connectivity TDD eIMTA CA new Rel-13 BCs eMTC IMS: IMSoWLAN IMSoFBBA POS: Indoor POS with MBS A-GPS + A-Galileo Completed: The TTCN of all test cases is ready for verification. Progressed: TTCN development ongoing, not yet completed. Started: TTCN development has started since last report. Suspended: TTCN development on hold due to external blocker.

3 Progress – TTCN verification (Status on 9th May’17)
Completed: Feature Rel- Priority (GCF/PTCRB) Verified TC # Progress Comments MFBI Inter-RAT Rel-9 none 1 / 1 +1 Refresh for ISIM parameters Rel-10 EVS Codec for MTSI Rel-12 WI-241 4 / 4 +2 Progressed: Evolution of TTCN test case verification compared to the last report. Not completed yet.

4 Progress – TTCN verification (Status on 9th May’17)
Progress – LTE, IMS, POS: Feature Rel- Priority (GCF/PTCRB) Verified TC # Progress Comments VoLTE (GSMA IR.92) Rel-8 WI-103 43 / 46 blocked Left: conf & real-time text (all in iWD-003) ViLTE (GSMA IR.94) WI-198 8 / 9 Left: conf (in iWD-003) IMS Emergency Calls Rel-9 WI-154 28 / 32 = :11/12TCs ; :17/20TCs LTE/C2K Inter-RAT WI-159 14 / 16 LTE Positioning WI-166 25 / 49 +2 under verification LTE/GERAN Inter-RAT Rel-10 WI-182/184 1 / 2 WI-180 eMDT LTE WI-227 25 / 26 Left: C2K Inter-RAT measurements CA Enhancements Rel-11 none 4 / 5 Left: Intra-band Contiguous Multiple TA SIMTC for LTE WI-210 +1 under verification rSRVCC 2 / 10 CA with 2UL 3 / 5 SCE-PHY Rel-12 WI-245 4 / 9 CA FDD / TDD 1 / 4 eMTC (CAT-M1) / CE Mode A Rel-13 WI-254-A 4 / 16 +3 Prio1: 4/13 ; Prio2: 0/3 +3 under verification Progressed: Evolution of TTCN test case verification compared to the last report. Not completed yet.

5 Progress – TTCN verification (Status on 9th May’17)
Progress – NB-IoT: Progress – UTRA (34.123): Feature Rel- Priority (GCF/PTCRB) Verified TC # Progress Comments NB-IoT (CAT-NB1) Rel-13 WI-257 13 / 74 +7 Prio1: 9/17 ; Prio2: 4/57 +10 under verification Feature Rel- Priority (GCF / PTCRB) Verified TC # Progress Comments Enh. UL CELL_FACH Rel-8 WI-131 4 / 18 = 64QAM + MIMO WI-205 2 / 5 UTRA Absolute Priority Based Reselection WI-207 4 / 5 UTRA CSG Rel-9 WI-158-R9 4 / 19 DC-HSUPA WI-161 8 / 9 3C/4C-HSDPA Rel-10 WI-185 2 / 37 MDT none 3 / 12 Further Enh. to UTRA CELL_FACH Rel-11 WI-208 3 / 7 +1 SIMTC WI-210-U 8 / 12 +5 Progressed: Evolution of TTCN test case verification compared to the last report. Not completed yet.

6 Progress – TTCN verification (Status on 9th May’17)
Started: Feature Rel- Priority (GCF / PTCRB) Verified TC # Progress Comments eDRX Rel-13 WI-253 1 / 5 +1 +1 under verification Started: lists the features for which at least one (first) test case has been submitted and agreed since the last report. About to start: lists the feature for which no test case has yet been verified, but at least one submission has been made, which is under review (consultation period still running).

7 Summary & open issues from TTCN Workshop #37 (11th Apr’17)
New Test Models: eDRX, eMTC, LAA: Consolidated Test Models / ASPs endorsed by the workshop, with several updates. TS prose CRs proposed at RAN5#75. NB-IoT / CIoT: Consolidated Test Model / ASPs endorsed by the workshop. TS prose CR proposed at RAN5#75. Ongoing discussions about changes to handling of Ncell power off/release in TTCN. IMS over WLAN: Endorsed Test Model for handling of XCAP signalling in SS test cases, when XCAP Server is outside of 3GPP network (DS1). V2V: Initial brainstorming discussions to ‘set the scene’ for Test Model work.

8 Summary & open issues from TTCN Workshop #37 (11th Apr’17)
Existing Test Models: Handling of UE Categories: Enhancement of ASPs to provide SS support for UE DL Categories up to 16. IMS: Endorsed updates to handling of SPI’s to accommodate SS’s using newer Operating Systems blocking some SPIs from being usable by TTCN. TS prose CR proposed at RAN5#75. Positioning: Related to RAN5 SIG AP#73.01 & merging of LTE GNSS test cases. Analysis concluded that no Test Model change is foreseen to adapt to the mega-GNSS LTE test approach.

9 Status of TTCN tasks in 2017 – Maintenance & 2016 tasks carried over
2016 tasks to be completed in 2017 Rel- RAT Prose Target SIG TC # TTCN Develpmt 2017 WkLoad TTCN Status (as of May’17) / Comments IMS over WLAN Rel-11 W Q4’16 37 Q1’16-Q3’17 2 30% D2D ProSe Rel-12 L Q2’17 12 Q3’15-Q3’17 0.5 85% ; prose issues Dual Connectivity 22 Q4’15-Q3’17 1 75% ; prose issues TD-LTE eIMTA Q4’17 6 Q2’16-Q4’17 25% ; prose issues LTE / UTRA IncMon. L,U 4 Q4’16-Q4’17 Not started ; no prose IMS on fixed terminals n/a Q1’17 28 Q3’16-Q4’17 50% NB-IoT & CIoT Rel-13 75 Q2’16-Q2’17 75% eMTC (CatM1, CE mode A/B) 27+ Q3’16-Q2’17 85% ; many TCs to be upgraded SC-PTM 24 Q3’16-Q1’17 100% LAA 18 Q4’16-Q3’17 20% LTE DL 4 Rx antenna ports Q1’17-Q3’17 0.3 CA Band Combinations Q2’16-Q1’17 60% LWA, LWI, LWIP L,W Q3’17 9 5% ; Test Model work TTCN maintenance & deliveries Q1–Q4 42 Release & configuration management Total: 262+ 65.3 man.months Legend: Blue: changes from last MCC TF160 report. Red: Important information. Italics: Estimation based on limited information available. Note: TTCN of some features initially started in 2016 will only be completed in 2017 due to availability of prose late in CY2016, especially those which impacts the Test Models.

10 Status of TTCN tasks in 2017 – 2017 tasks
Rel- RAT Prose Target SIG TC # TTCN Develpmt 2017 WkLoad TTCN Status (as of May’17) / Comments MTSI for Converged IP Comm Rel-8 L,W Q3’17 12 Q2’17-Q4’17 2 Not started ; no prose feMDT Rel-13 L Q1’17 Q1’17-Q2’17 0.3 15% Indoor Positioning Q1’17-Q3’17 25% (MBS: 75% ; rest: 0%) MCPTT Q4’17 49 Q2’17-Q1’18 4 PUCCH on SCell Q1’17-Q4’17 1 New Band 70 n/a 0.1 100% New Band 41 PC2 Rel-14 Q2’17-Q3’17 50% New Band 48 Q2’17 Not started V2V 17 Q1’17-Q1’18 3 5% ; Test Model work CA Band Combinations Q1’18 0.5 10% eLAA High Speed Enhancements Q2’18 ~5 Q2’17-Q2’18 SRS Switching between CCs 6 New SDL Band 69 New Bands for NB-IoT Interf. Mitigation for DL CChs FFS Indoor Positioning Enh. QMC for Streaming Service U VoLTE / ViLTE Enhancement Q3’17-Q4’17 LTE_VoLTE_ViLTE_enh-UEConTest (new) feMTC 1.5 LTE_feMTC-UEConTest (new) eNB-IoT NB_IOTenh-UEConTest (new) TEIx_Test (new TC coverage) Rel-8+ L,U 20 Q1–Q4 2017 total after RAN5#74: 18 TCs Total: 113+ 25.2 man.months Legend: Blue: changes from last MCC TF160 report. Red: Important information. Italics: Estimation based on limited information available.

11 Preparing for 2017 TTCN Work – Funding
2017 workload is estimated at 90.5 man.months (mm), see previous slides. PCG#37/OP#36 approved the 3GPP funding of 58 mm for 2017 TTCN tasks. PTCRB appreciated the results that were produced from their contribution in So they have agreed to continue TF160 financial support in 2017. Current commitments for 2017 are as follows: 3GPP companies /3GPP MRPs committed to provide 19.5 mm as voluntary contributions for 2017 TTCN development. Total resources of 90.5 mm  no estimated funding gap. Funding Entity Man.months Comments 3GPP 58 PCG#37/OP#36 approved PTCRB / CTIA 12 NextNav 1 iPOS(MBS) Total: 71 TTCN experts free-of-charge Entity Man.months Comments TDIA 10,5 LTE-A TDD, LCR TDD, NB-IoT Rohde&Schwarz 3 NB-IoT, IPCC Adare 2 TTCN deliveries, SC-PTM Qualcomm (e)LAA, V2V/V2X, LWA Anritsu 1 (f)eMTC Keysight LTE-A-Pro Total: 19,5

12 2017 TTCN baseline and deliveries – Planning
Week Delivery Date TTCN CR Cut-Off-Date Status Report Type of Delivery Comment wk02 16-Jan CAG#49 (17th/18th-Jan) wk04 27-Jan n/a TTCN3 Special IoT delivery wk09 02-Mar 27-Feb TTCN2 (FDD) 03-Mar TTCN2 (LCR TDD) wk10 06-Mar CAG#49ter (8th-Mar) 10-Mar wk16 21-Apr CAG#50 (25th/26th-Apr) wk23 09-Jun 05-Jun wk30 24-Jul CAG#51 (25th/26th-Jul) wk32 08-Aug 30-Jul TTCN3 Rel-14 Baseline upgrade Move to Rel-14 Jun'17 baseline wk36 07-Sep 04-Sep 08-Sep wk37 15-Sep 11-Sep wk42 20-Oct CAG#52 (24th/25th-Oct) wk51 22-Dec 18-Dec 3GPP Rel-14 core specs schedule: Jun’17: ASN.1 freeze


Download ppt "MCC TF160 Status Report (Pre-RAN5#75)"

Similar presentations


Ads by Google