Excelsior Energy’s Mesaba Energy Project
Update for the NM-SPG August 16, 2006
2
Current Project Parameters
Two 606MW IGCC units ISDs and 2013 Primary Site- West Range POI---Blackberry 230kV Sub Near Taconite, MN in Itasca County Alternate Site- East Range POI---Forbes 230kV Sub Near Hoyt Lake, MN in St. Louis County Designated as an Innovative Energy Project under special MN Legislation
3
MISO LGIP Current Status
5
Transmission Progress to Date
Transmission Concept Screening Study July 2003 East Range GO Analysis August 2004 East Range GI Request to MISO October 2004 Queue # , Project G477 First Unit 531/552MW ISD 2010 Network Resource Service G477 Feasibility Study Report March 2005 6 months West Range GO Analysis May 2005 West Range GI Request May 2005 Queue # , Project G519 First Unit 600MW ISD 2010
6
Transmission Progress to Date
G519 ‘Out of Queue’ Study Agreement August 2005 West & East Range Preliminary GO Facilities Engineering Designs December 2005 West & East Range GO Analyses Updates December 2005 G519 Feasibility Study Results December 2005 8 months G477 & 519 System Impact Study Results April 2006 11 and 19 months G477 & 519 restudy of short circuit results July 2006 Second unit GI request submitted January 2006 Designated G597
7
Transmission Progress to Date
G597 Feasibility Study Report July 2006 G477&519 Facilities Studies underway July 2006 MP has contracted to perform G597 SIS Agreement Executed August 2006 Note: Between July 2004 and December 2005 Excelsior performed six series of powerflow studies to evaluate GO facilities and network reinforcements
8
MISO Study Results Project G477 SIS (Forbes POI)
Powerflow : No problems identified Short Circuit : Several pre-existing over-dutied breakers but no new ones caused by G477 Stability : All simulations are stable and within damping criteria. No transient low voltage violations. Deliverability Analysis: Failed Awaiting MISO study proposal to continue NRIS process TSR submitted by Xcel for NITS (local capacity resource)
9
MISO Study Results Project G519 SIS (Blackberry POI)
Powerflow : Some issues identified during contingencies. Resolved with the addition of a new Boswell-Riverton 230kV line. Short Circuit : Several pre-existing over-dutied breakers delete [plus four new 115kV breakers at Nashwauk Sub due to G519] Stability : All simulations are stable and within damping criteria. No transient low voltage violations. New Boswell-Riverton 230kV line was included in these studies. Deliverability Analysis: Failed Awaiting MISO study proposal to continue NRIS process TSR submitted by Xcel for NITS (local capacity resource
10
MISO Study Results Project G597 Feasibilty Study (Blackberry POI)
Powerflow: numerous local contingency violations identified Not unexpected with both MEP II and new 800MW NE MN unit included without any network upgrades Short Circuit: four Nashwauk 115kV breakers overdutied Note: Modeling didn’t include proposed Minnesota Steel Plant or CAPX 2020 Projects
11
Other Mesaba Energy Project Progress
Filing made 12/23/05 with MPUC for a PPA with Xcel Energy under Innovative Energy Project Legislation Joint Siting/Routing Application made 6/16/06 for both units, all GO facilities, and gas pipeline. Application accepted as complete 7/6/06.
12
Proposed GO Facilities
G519: 9 mile double circuit 345kV steel pole structures, operated 230kV for MEP I G477: Two 345/115kV steel pole lines replacing existing 115kV structures for most of their 34 and 37 mile routings, with 345kV side operated 230kV for MEP I
13
West Range GO Facilities
14
West Range GO Routings
15
East Range GO Facilities
16
East Range GO Routings
17
Questions??