Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
High intensity SC Linac for Energy Amplifier aka: HiSCLfEA CAS High power hadron machines, bilbao 2011 Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
2
Outline Goal Existing Facilities Solution Overview Components
Reliability Location Summary
3
Design Parameters Conceptual design of an Accelerator Driven System (ADS) for energy production in subcritical reactor as well as for transmutation of nuclear waste. To achieve this goal we propose a CW proton facility capable to feed the reactor with 30 MW proton beam at 1 GeV.
4
Existing Facilities KURRI (ADSR Kyoto, Japan) MYHRRA (Belgium)
Research at Los Alamos (USA) Research at TRASCO (Italy)
5
General Layout Super-conducting Linac Source RFQ DTL SC Linac Target
340 m 3,5 m 20 m 300 m Source RFQ DTL SC Linac Target LEBT MEBT 50 keV 3 MeV 50 MeV 1 GeV
6
Proton Source Modelled on ECR Proton Source Proton Source
Output Energy 50 keV Frequency 2.45 GHz Max Beam Current 30 mA Aperture 8 mm Normalised Emittance 0.1 π mm mrad
7
RFQ 4-vane RFQ RFQ Input Energy 50 keV Output Energy 3 MeV Frequency
352 MHz Max Beam Current 30 mA Power Consumption 500 kW Length 3.5 m
8
DTL (or Spokes...) Robust concept derived from Linac4 and adapted to CW operation DEsign DTL Input Energy 3 MeV Output Energy 50 MeV Frequency 352 MHz Max Beam Current 30 mA Power Consumption 2 MW Length 20 m
9
SC Linac 3 Sections of Elliptical Cavities at β-constant β = 0.45
β = 0.45 Input Energy 50 MeV Output Energy 200 MeV Frequency 704 MHz Max Beam Current 30 mA Power Consumption 10.5 MW Length 70 m
10
SC Linac 3 Sections of Elliptical Cavities at β-constant β = 0.62
β = 0.62 Input Energy 200 MeV Output Energy 500 MeV Frequency 704 MHz Max Beam Current 30 mA Power Consumption 12 MW Length 80 m
11
SC Linac 3 Sections of Elliptical Cavities at β-constant β = 0.8
β = 0.8 Input Energy 500 MeV Output Energy 1000 MeV Frequency 704 MHz Max Beam Current 30 mA Power Consumption 22.5 MW Length 150 m
12
Target and sub-critical Reactor
Beam Energy 1 GeV Beam Power Up to 30 MW ADS Power Consumption 50 MW Spallation Target Pb - Bi Thermal Power 800 MW Effective Electric Power 220 MW Sub-criticality 0.95
13
Reliability Requirements
Required Reliability Reliability Requirements Number of Trips < 3 trips per year Loss < 10E-6 loss per meter Minimum Time Between Failures (MTBF) > 250 hours
14
Suggested Location World’s most nuclear producing/consuming countries…
75.2% 63236 MW 28.9% 47348 MW MW 20.2% Power the accelerator with “clean” energy Transmutate French nuclear waste Return power to the grid
15
Summary ADS Parameters Required Existing Facilities
Super-conducting Linac Solution Reliability Facility Location Thank you for listening, any questions?