CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet

Similar presentations


Presentation on theme: "CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet"— Presentation transcript:

1 CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Françoise Rondeaux – Paolo Ferracin 17/12/2014 CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3

2 Status 2 copper coils already partially done : CC3401 (type 3-4):
winding OK, sent to CERN (25/06/2013) heat treatment OK impregnation OK CC1201 (type 1-2) winding OK, sent to CERN (07/01/2014) impregnation in progress 17/12/2014 CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3

3 Modified winding / reaction tooling
We have received the modified winding / reaction tooling (in 3 parts) for type 3-4. Test on coil (4+4 turns of RRP cable) with modified tooling + large gaps (DR3401) : OK, cf. next slide Test on coil (4+4 turns) with modified tooling + adjusted gaps (DR3402) : winding OK, waiting for the new guiding rings Procurement of the modified tooling for type 1-2: delivery in early April 17/12/2014 CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3

4 DR3401 It moved! 1,9 mm sym side + 1,3 mm asym side
¾ ceramic guiding rings broken will be modified 17/12/2014 CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3

5 Milestones 2 options: 1) strategy maintained with intermediate test. 2) without intermediate test (and CC3402). Planning modifications (option 1): - modifications in tooling after DR3401. - modified tooling 1-2 delivery delayed. - need to wait disassembly of coil pack CR12+CC34 Option 1 Kick-off meeting Today 3.1 : 1 Cu coil type 3-4 with modified tooling March 2015 June 2015 3.2 : 2 Nb3Sn coils type 1-2 for FRESCA 2 magnet delivered September 2015 December 2015 3.3 : 2 Nb3Sn coils type 1-2 tested with 2 Cu coils February 2016 May 2016 3.4 : 2 Nb3Sn coils type 3-4 for FRESCA 2 magnet delivered 3.5 : FRESCA 2 magnet tested August 2016 November 2016 17/12/2014 CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3

6 Milestones 2 options: 1) strategy maintained with intermediate test. 2) without intermediate test (and CC3402). New order for the coils fabrication Cable available for CR3401 in March? Option 2 Kick-off meeting Today 3.2 : 2 Nb3Sn coils type 1-2 for FRESCA 2 magnet delivered September 2015 November 2015 3.4 : 2 Nb3Sn coils type 3-4 for FRESCA 2 magnet delivered February 2016 3.5 : FRESCA 2 magnet tested August 2016 June 2016 For both options: - end of test DR3402 : new guiding rings - coating of the post - availability of new horseshoes (tooling) and cable supports : validation of splicing zone 17/12/2014 CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3

7 Option 1 Option 2 17/12/2014 CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3

8 Thanks for your attention
17/12/2014 CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3

9 FRESCA 2 dipole magnet 17/12/2014
CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3

10 FRESCA 2 dipole magnet 17/12/2014
CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3

11 Description Complete the FRESCA 2 coil manufacturing and test.
Prolongation of EuCARD HFM task 3 + exceptional contribution of France to CERN. 5 steps: manufacture of a Cu coil type 3-4 using the modified equipment (cf.slide 7) manufacture of 2 Nb3Sn coils of type 1-2. assembly and the test at CERN of 2 Nb3Sn coils type 1-2 in the structure with 2 Cu coils type 3-4. manufacture of 2 Nb3Sn coils type 3-4 required to complete the dipole FRESCA 2. assembly and the test at CERN of the dipole FRESCA 2. CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3 17/12/2014

12 Fabrication process – main steps
Conductor insulation Conductor preparation Winding Preparation for the heat treatment: Assembly of the reaction mold around the wound coil Transport to CERN Heat treatment Preparation for impregnation : Nb3Sn/NbTi splice soldering Instrumentation, ground insulation and quench heaters integration Impregnation Coil assembly Magnet assembly At / by Saclay At / by CERN 17/12/2014 CEA-Irfu-SACM-LEAS - F.Rondeaux -CEA KE2775 progress meeting - WP3