Roof System Parts Ceiling Joist: Collar tie
Run parallel to the floor joists supports the dry wall for the ceiling Structurally supports the wall system from shifting Collar tie 2x4 lumber Ever 3rd ceiling joist Used to strengthen roof structure Placed approximately 3’ to 4’ from ridge board
2
Roof rafter Runs from the ridge board to the outside wall tie plate.
Cuts Plumb cut Birds mouth Seat cut Tail cut Soffit cut
3
Ridge board 2x? Material Runs the entire length of the roof
Holds the ceiling joists in place
4
Roof Sheathing Plywood OSB
5
Fascia and sophist
6
Roofing Material Tar paper: sold by the roll
SYNTHETIC ROOFING UNDERLAYMENT Ice barrier: Sticky, self adhesive
7
Shingles Asphalt: Sold by the square (1 square = 100 sq ft) (10’x10’)
Rated by how long they will last Different designs 3 tab architectural