Cameron County Erosion Response Plan Public Forum #3 February 22, 2016

Similar presentations


Presentation on theme: "Cameron County Erosion Response Plan Public Forum #3 February 22, 2016"— Presentation transcript:

1 Cameron County Erosion Response Plan Public Forum #3 February 22, 2016
Peter Ravella, PAR Consulting Steve Underwood, Applied Coastal Research & Engineering Commissioners Courtroom 6:30 – 8:00 PM Text questions:

2 ERP Process For 2016 Local Government Prepares ERP with Public Input Based on Shoreline Data provided by UT-BEG Local Government Adopts the ERP ERP is submitted to the GLO for State Review Tex Reg Notice & 30-Day Public Comment Period State Approval or Rejection by Administrative Rule Final County Enactment through Beach-Dune Plan Revisions

3 Public Engagement Two of Three Public Workshops Complete
Public Workshop #1: October 28 Public Workshop #2: December 15 Public Workshop #3: February 22 Special Meetings Undertaken SPI Real Estate Group December 10 ASBPA Chapter Meeting December 11 Landowner Meeting 1 January 12 Landowner Meeting 2 February 19 Target ERP Transmission Date: March 31

4 Upcoming Public Engagement & ERP Completion Schedule
Action Date Duration (Days) Public Workshop #3 Feb 22 N/A Draft ERP Released to County & GLO Mar 11 7 GLO & County Clarifications Draft ERP Released for Public Review Mar 18 Close of Public Review Period Mar 25 Draft ERP Revisions & Release of Final ERP Mar 28 3 County Commissioner Action Mar 31 Submission of ERP to GLO Apr 8

5 Estimated GLO Review Process, Summer – Fall 2016
Action Estimated Date Duration (Days) Submission of ERP to GLO (Estimated) Apr 8 GLO Comments & ERP Revisions Apr - May 30 Proposed Rule to Accept or Reject June 30 Public Comment Period July 1-30 Final GLO Action by Administrative Rule Sept - Oct 60

6 ERP Elements What’s in One of These Things?
E1 - A building setback line E2 - A prohibition on new construction seaward of the building set-back line. E3 - Narrow exemptions from the construction prohibition E4 - Stricter construction standards for exempt properties E5 - Procedures for preserve & enhancing public access E6 - Procedures for preserving, restoring, and enhancing critical sand dunes E7 - Criteria for voluntary acquisition of property seaward of the building setback line Text Questions to (512) Project website: cameroncountyerp.com

7 Building Setback Line Why Create an SBL?
Protect future development from Catastrophic Risk of Shoreline Erosion Reduce Public And Private Costs of Post-storm Recovery Limit Property Damage And Loss of Life Text Questions to (512) Project website: cameroncountyerp.com

8 North Carolina Outer Banks: This is what happens when you don’t anticipate shoreline change
Text Questions to (512) Project website: cameroncountyerp.com

9 Impact of Erosion on SPI
Lot Position # of Lots Tax Assessed Value Submerged Lots 61 $280,839 Partially Submerged 106 $35.2M On the Beach 92 $2.4M

10 Building Setback Line County Shoreline is Not Uniform
Zone 1 – Boca Chica Site of Space X Launch site Limited future development pressure Areas of accretion, limited erosion areas Zone 2 – Northern SPI City Limit to End of PR 100 Most Likely to develop - Road & Utilities in place Erosion rates at 10 to 12 feet per year Zone 3 – End of Road to County line Unlikely Near-term development – No road or utilities Erosion rates 15 to 20 feet per year Text Questions to (512) Project website: cameroncountyerp.com

11 Zones 2 & 3 – Not Uniform Wide Almost Dune-less Stretches

12 ZONE 3 – Shear Scarp of Eroding Primary Dunes (About Mile Marker 14)

13 Building Set-Back Line Calculating a Setback
ZONE 2: Northern City Limit to End of PR 100 Planning period: 30 Years Average Annual Erosion Rate: 10 to 12 feet/year Setback Baseline: Mean High Tide Line (MHT) Setback Calculation: Erosion rate x Planning Period Example: 30 years x 11 ft/year = 330 foot SBL Text Questions to (512) Project website: cameroncountyerp.com

14 Building Set-Back Line Addressing Uncertainties
Setback Baseline Issues (MHT, MLT, LOV) All the SBL Baselines Fluctuate Fluctuation Creates Uncertainty in SBL Addressing SBL Uncertainty in the ERP Avoid Permit-by-Permit SBL Determinations Seek Consistency and Equity in SBL Create SBL “Lifespan” Text Questions to (512) Project website: cameroncountyerp.com

15 Building Set-Back Line Two Cornerstones for Success
Relocate PR 100 The SBL Moves Development Landward PR 100 location impinges on developable space Relocation of PR 100 is recommended Develop & Implement a Shoreline Response Plan Implement Beach Nourishment & Sand Management/Retention Strategies to reduce erosion rate Establish consistent, wide, healthy dunes seaward of development Text Questions to (512) Project website: cameroncountyerp.com

16 E1 The Shores Setback Text Questions to (512) Project website: cameroncountyerp.com

17 Construction Prohibited Seaward of the Building Setback Line
The ERP will prohibit construction of all habitable structures seaward of the Setback Line Exemptions for Allowed Structures Seaward of Setback Line -- Walkovers and Similar Amenities Text Questions to (512) Project website: cameroncountyerp.com

18 Exemptions & Stricter Construction Standards for Exempt Properties
No Exemptions Are Included so No Stricter Building Standards are Necessary Because no Habitable Structures will be Seaward of SBL, Stricter Construction Standards would not be developed seaward of the Setback Line Improved construction standards may apply to walkovers and related amenities Text Questions to (512) Project website: cameroncountyerp.com

19 Procedures for Preserve & Enhancing Public Access
Zone 1 - Boca Chica No Change (Vehicle access) Zone 2 – SPI City Limit to The End of PR 100 Transition to a Pedestrian Beach Requires Significant New Off-Beach Parking Zone 3 – PR 100 end to County Line No change (Vehicle access) Text Questions to (512) Project website: cameroncountyerp.com

20 Preserve & Enhancing Public Access
ERP Element #5 Preserve & Enhancing Public Access Acquire New Access Ways Spaced ½ to ¾ mile 88 – 100 Off-Beach Parking Spaces per access Create seaward dune & add walkovers Phased Implementation- convert to pedestrian beach as access are acquired and improved Text Questions to (512) Project website: cameroncountyerp.com

21 Preserving, Restoring & Enhancing Critical Sand Dunes
Wide Healthy Dunes Seaward of the Setback Line are Critical and a Foundation of the ERP Existing Dunes Seaward of the Setback line will be Preserved and Enhanced Existing Dunes Landward of Setback Line will be relocated seaward In areas where Dunes are absent or Fragmented, Dune Restoration will be undertaken Text Questions to (512) Project website: cameroncountyerp.com

22 Preserving, Restoring & Enhancing Critical Sand Dunes
ERP Will Specify Basic Dune Plan and Specifications Dune height: At least 75% of Base Flood Elevation (BFE) Dune Width: Varies between 100 to 250 feet Dune Volume per Foot: ******** 50 to 80 cubic yards Dune Plants: Native vegetation, 6 to 12 inches on center Irrigation: Yes, if possible, with grey water reclamation Dune Permitting: Master Plan Permit or Permit by Rule Coordinated and phased implementation through County Text Questions to (512) Project website: cameroncountyerp.com

23 Criteria for Voluntary Acquisition of Property Seaward of the Building Setback Line
Establish Acquisition Criteria Acquisition By: Donation Purchase Transfer of Development Rights Funding Options NFWF (Federal grant funds) Restore Act FEMA HMGP Local Special District Taxes (PID) Other TBD Text Questions to (512) Project website: cameroncountyerp.com

24 Expected Outcome A Plan to Stabilize or Counter High Erosion Rates
Beach Nourishment Sand Retention Strategies Wide, Healthy Dunes to Protect Future Development Vehicle Access Limitations? Off-Beach about ½ to ¾ Mile increments 88 parking spaces per access point Access Possible Streamlined Permitting Landward of Setback Line

25 Thank You ERP Draft Release Date March 18, Tract the Draft and comment through


Download ppt "Cameron County Erosion Response Plan Public Forum #3 February 22, 2016"