IBL CO2 cooling control system development status 10.04.2013
Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC
2
Presentation overview
Control cabinets – progress Local box – progress Chilller control system Vacuum system
3
Control cabinets – status
Control/electrical rack layout design completed Electrical schematics nearly completed by Florian 95% of control hardware components ordered and delivered Assembly by EN/CV in progress
4
Local box for maintenance operation
Mechanical assembly well advanced (PH/DT) All components are ordered Front panel to be graved with P&ID by NIKHEF Electrical assembly already started
5
Local box for maintenance operation
6
Chilller control system
We decided to bulid up the chiller control system by ourself Base on expirence from MARCO cooling system
7
Chilller control system
Work splited between PH/DT and EN/CV Electrical schematic by PH/DT Components integration in the cabinet by PH/DT Construction and cabling of the cabinet by EN/CV Purchase of components: Frequency inverter and expansion valves controllers by PH/DT Electrical components by PH/DT and EN/CV Electrical cupboards by EN/CV
8
Contact with TE-CRG-CE (Controls and Electrical Support)
Vacuum system Contact with TE-CRG-CE (Controls and Electrical Support)
9
Thank You Control system development status IBL CO2 cooling th April 2013