Presentation is loading. Please wait.

Presentation is loading. Please wait.

Central Scotland, Grangemouth and Perth

Similar presentations


Presentation on theme: "Central Scotland, Grangemouth and Perth"— Presentation transcript:

1 Central Scotland, Grangemouth and Perth
Disruptive Possession Sites–2007 Central Scotland, Grangemouth and Perth Map 11 to Inverness (Map 13) UB110/032 - Clayton UB110/033 – Paterson’s ( Bridge of Earn) UB110/029 Carey Farm to Dundee (Map 12) Perth 4 1 S 3 1 S Dunning (Up) 51-52 2 T Ladybank Jn 1-2 2 S Station Rd Abernethy UB110/025 / Public Rd, Cordon 3-5 3 T 37-38 2 Kippenross (Dn) T 6 1 T Newburgh (Rev) 5 1 S Stirling –Alloa-Kincardine Commissioning Kippenross Tunnel Collessie (Rev) 6-8 1 2 P Stirling Plat 8&9 (mid-week) 1-2 2 T 9 1 Stirling P to Alloa – Kincardine to Fife (Map 10) Plean (Up & Dn) 7-8 2 T 6 1 Commissioning 26 1 P O 7-9 3 Greenhill Lower Jn Larbert Forthside-Stirling Footbridge Plat 3-7, 9-10 43 1 M I 1 6 Grangemouth Jn 47, 51, 52 2 1 C To Cumbernauld & Mossend (Map 8) Falkirk Grahamston Grangemouth 9 1 T 41-44 4 T to Dalmeny Jn (Map 9) Carmuirs East/West (Up) Linlithgow Greenhill Upper Jn Bonnymuir (Up/Dn) Winchburgh Jn To Glasgow Queen Street (Map 8) to Edinburgh (Map 9) KEY Polmont Track Renewals Other Investment Possession Durations Externally Funded Projects Rock Cuttings / Earthworks T PL Track Renewals P E 12 hr 43 hr S&C Renewals inc. Follow-up Tamps Signalling / Interlocking Works Structural Repairs / Renewals Maintenance Enhancement / 3rd Party Schemes C I S 16 hr 54 hr Week No(s). (2008 Shaded Blue) Heavy Maintenance / Annual Tamping Overhead Line Works & Electrical Plant 29 hr 78 hr M O Network Rail Scotland Territory Delivery Planning Unit : Version 17/05/06

2 to Perth via. Invergowrie (Map 11) to Hilton Jn. and Perth (Map 11)
Dundee to Aberdeen Disruptive Possession Sites–2007 Map 12 to Perth via. Invergowrie (Map 11) Montrose to Hilton Jn. and Perth (Map 11) 48-49 2 C 50 1 Balcathie (Up) Kinnaber (Dn) to Markinch (Map 10) 49 1 50 1 T T Ladybank To Aberdeen (Map 13) Stonehaven Springfield Leuchars Dundee Arbroath 48-50 2 1 P 48 1 T Mossend – Elgin Re-gauging Scheme Arbroath (Dn) 78hrs KEY Track Renewals Other Investment Possession Durations Externally Funded Projects Rock Cuttings / Earthworks T PL Track Renewals P E 12 hr 36 hr S&C Renewals inc. Follow-up Tamps Signalling / Interlocking Works Structural Repairs / Renewals Enhancement / 3rd Party Schemes Maintenance C I S 16 hr 54 hr Week No(s). (2008 Shaded Blue) Heavy Maintenance / Annual Tamping Overhead Line Works & Electrical Plant 29 hr 78 hr M O Network Rail Scotland Territory Delivery Planning Unit : Version 17/05/06


Download ppt "Central Scotland, Grangemouth and Perth"

Similar presentations


Ads by Google