Presentation is loading. Please wait.

Presentation is loading. Please wait.

Section 200 Process Control

Similar presentations


Presentation on theme: "Section 200 Process Control"— Presentation transcript:

1 Section 200 Process Control

2 1.0 Purpose

3 2.0 Procedure Unit Assembly

4 2.1 Unit Assembly Spacer assembly Glass Preparation
Primary Sealant Application Glass Spacer Assembly

5 3.0 Unit Sealing

6 4.0 In Process Quality Checks
Sealant Adhesion Gunning vs. Toweling Premature failure prevention Glass breakage prevention Material Parameters Application Rate

7 4.0 Process Quality Checks
Sealant bead shape Sealant bead position Pressing Desiccant Spacers Glass Visual Inspection

8 4.1 Sealant Visual Inspection base & catalyst Ratio check for two part
Mixed Sealant Quality control checks

9 4.2 Adhesion Quality control checks - Adhesion

10 4.3 Gunning vs. Troweling

11 4.4 Premature Failure Prevention
Voids or skips in sealant Corner fill Spacer / glass Alignment Dirt / Contamination Desiccant Sealant Mix / Air PIB Placement

12 4.5 Glass Breakage Edge quality Spacer quality Corner Keys Muntin Bars
Spacer Profile Lucor Glass Deflection Unit Separation

13 4.6 Material Parameters Amount of sealant Temperatures Pressures

14 4.7 Application Rates Spacer speed Variations

15 4.8 Shape of Sealant Bead Shape Cavities / Depressions

16 4.9 Sealant Bead Position

17 4.10 Pressing

18 4.11 Desiccant Desiccant testing Spacer filling Storage
Desiccant Types Front Points Record Keeping

19 4.12 Spacers Accurate Cuts Cleanlines Handling Coner Keys Muntin Bars

20 4.13. Glass Accuracy Edge quality Cleanliness Handling Stacking
Coated glass

21 4.14 visual Inspection Spacer / Glass Alignment Corner Fill
Sealant appearance Sealant depth Entrapped Air Sealant colorStacking Units

22 5.0 Procedure Glass Washing Work Instructions
Hand Gunning Work Instructions Additional Work Instructions

23 5.1 Glass Washing Work Instructions
Purpose Responsibility Definitions Safety Equipment Quality Checks Work Instructions

24 5.2 Hand Gunning Work Instructions
Purpose Responsibilities Definitions Safety equipment Quality checks Work Instructions


Download ppt "Section 200 Process Control"

Similar presentations


Ads by Google