1 Accelerator System - Vacuum
Frank Zimmermann in collaboration with Gianluigi Arduini & Ralph Assmann information from Miguel Jimenez, Laurette Ponce, Bruno Puccio, Paolo Chiggiato + references O. von Guericke, 1st vacuum pumps, ~1640

2 topics requirements; LHC vacuum system; P measurements
signals available in the control room: beam vacuum, insulation vacuum, sampling rate bake-out and NEG activation 450-GeV vacuum pressure and beam lifetime collimation vacuum e-cloud test bench effect of quench on beam and insulation vacuum beam operation at 450 GeV; beam measurements higher intensity and 7 TeV He leaks

3 vacuum requirements & effects on beam
design pressure corresponds to ~100 h beam lifetime due to nuclear interaction with residual gas; or to an average loss rate of 6x104 p/m/s (quench limit at 7 TeV: 8x106 p/m/s; at 450 GeV: 7x108 p/m/s); at 450 GeV the design gas pressure yields an emittance doubling time between 30 and 10 h depending on species, due to multiple Coulomb scattering

4 LHC vacuum system Sectors separated by valves Experimental IRs:
cold sectors - triplet, Q4, Q5, Q6, arc (2900 m!) warm sectors – intermediate regions, and space around IP IR7: 3.5 vacuum sectors between IP and arc IP triplet D2,Q4 Q5 Q6 arc IP7

5 pressure measurements - gauges
Penning gauge: more stable, less precise cold-cathode gauge 2 electrodes: anode, cathode + permanent magnetic field invented 1937 by Penning precursor of sputter-ion pump nonlinear dependence Bayard-Alpert gauge: less stable, more precise hot-cathode gauge, 3 electrodes: filament, collector, grid invented 1950, revolution in vacuum technology linear dependence, ultra-low vacuum

6 pressure measurements – locations
Beam vacuum: Cold parts: Penning gauge (in attached short RT section) Warm parts: both types of gauges At least two Penning gauges per vacuum sector (warm or cold); 6-8 gauges / arc (every 3 or 4 cells) 1 B-A gauge per warm vacuum sector Insulation vacuum: Penning gauge with autoprotect (OFF for pressure >5e-5 torr) Penning gauge cold 20 cm no simple rule to deduce actual pressure in cold part!!

7 LHC layout, courtesy M. Jimenez

8 LSS schematic view, courtesy M. Jimenez

9 Point 8 27 March vacuum valve Pirani gauges Penning gauges

10

11 signals available in the control room
all pressure gauge readings at sampling rate 0.1 Hz (locally increased during MD periods to 1 Hz) available through vacuum PVSS interface vacuum alarms naming convention?

12 signals available in the control room – 2

13 signals available in the control room – 3

14 signals available in the control room – 4

15 signals available in the control room – 5

16 signals available in the control room – 6
Penning gauge (VGP) located in a combined vacuum sector (.C instead of .R or .B for red and blue beams), in vacuum sector B5R8. The 39 means that the gauge is located at a distance of 39 m from the sector valve when leaving the IP.

17 vacuum interlock Vacuum User_Permit = “FALSE” if: Valves open or move
Pressure over threshold Vacuum BIS User_Permit LBDS Beam_Permit Beam_Info If default: Vacuum changes its User_Permit from “TRUE to “FALSE” The BIS changes the Beam_Permit from “TRUE to “FALSE” => beam is extracted by LBDS The BIS changes Beam_Info signal from “TRUE to “FALSE” NO beam => (if needed) Vacuum could close the sector valves (L. Ponce, B. Puccio, MPSWG, )

18 plans for bake-out and NEG activation
present plan: all RT parts will be baked only question concerns the ceramic chambers MKD in IR6 L&R (2 x 22 m); due to scheduling conflicts, this was being discussed with Brennan

19 total outgassing rate of collimators ~2x10-7 mbar l/s
collimation vacuum total outgassing rate of collimators ~2x10-7 mbar l/s pumping speed ~20 l/s → pressure < 10-8 mbar + pressure will decrease by factor 10 in ~1 year pressure spike due to beam loss if pressure >5x10-5 mbar: valves close press. jaw T1>T0: thermal stimulated desorption jaw T0 decay time determined by pumping speed time

20 electron-cloud test bench
postponed to shutdown

21 effect of quench on beam & insulation vacuum
depends on temperature transient of the cold bore peak temperature < 30 K: small effect, release of H2 peak temperature > 30 K: release of CO, CH4 temp. >30 K? time

22 quench effect in String 2 Test
LHC Project Report 681; V. Baglin, Chamonix XIII

23 beam operation & beam measurements
no pressure change expected for 450-GeV commissioning beams no special beam measurements needed of course, vacuum group will monitor pressure readings

24 pressure evolution in the 1st year
V. Baglin, Chamonix XII

25 2008: higher intensity and 7 TeV
synchrotron-radiation photons heating induced by secondary halo or nuclear cascade behind the collimators

26 helium leaks in cold arcs
localized He leak can cause quenches - but is likely not visible in beam lifetime or emittance; e.g., 10-m long He bump with local proton loss rate of 8x106/m/s (= quench limit at 7 TeV) reduces beam lifetime from 100 to 99 hr & emittance growth time at 450 GeV/c from hr to hr. helium front propagates slowly (few cm/hr) - only after weeks or months it arrives at closest pressure gauges (placed every m); standard beam-loss monitoring system (every 53 m) may be unable to detect & localize leak; 1) solution: deploy mobile “BLM snake” with 2-m BLM spacing (B. Jeanneret) 2) alternative solution (A. Poncet, CERN MT/95-01 (ESH)): debunch 450GeV & measure e- ionization current 3) on-line measurement of heat load to cryogenics (V. Baglin, Chamonix XIV)

27 conclusions many readings available nothing special expected for 450 GeV commissioning lifetime ok at higher intensity & 7 TeV: higher steady-state pressure in regions behind collimators sudden beam loss on collimators could cause pressure spike which leads to valve closure desorption from SR photons

28 references O. Gröbner, 'Technological Problems related to the Cold Vacuum System of the LHC'', Vacuum, vol. 47, pp (1996). 2) LHC Design Report, Vol. I, Chapter 12: Vacuum System 3) V. Baglin, Running In – commissioning with Beam, Chamonix XII. 4) V. Baglin, Vacuum Transients During LHC Operation, Chamonix XIII. 5) V. Baglin, How to Deal with Leaks in the LHC Beam Vacuum, Chamonix XIV. 6) A.Poncet, Pressure Measurements and Helium Leak Detection in the LHC Cold Bore using the Electron Current from Ionization of the Gas by the Proton Beam, CERN MT/95-01 (ESH) (1995). 7) L. Ponce, B. Puccio, MPS aspects - Commissioning of the Vacuum System, MPSWG, 14 February 2007. 8) E. Blanco et al, Experimental Validation and Operation of the LHC Test String 2 Cryogenic System, LHC Project Report 681 (2004). 9) J.M. Jimenez, Electron Cloud Diagnostics in the LHC, EDMS document LHC-VI-EC-0001 v.1.0 (2003). 10) Tour of LHC Point 8, 27 March 2007. 11) Discussion with M. Jimenez, 1 February 2007.