Download presentation
Presentation is loading. Please wait.
Published byJody Dorsey Modified over 6 years ago
1
Dams & locks on the Meuse river Belgium Warm Standby project
1
2
Management of dams and locks on the Meuse river
Short description The goal is to manage and monitor the water level of the river and to open/close the locks. There are 11 dams between France, Belgium and Holland. A specialized “river” software calculate the water level needed, and give the information, via TCP-IP, to the local control systems. Each system has at least 1 Monitor (1 server and 4 Web clients) and 1 Premium Warm Standby. Global equipment list 12 Monitor Pro with 48 Web clients 14 Warm Standby Premium on Fip optical rings 25 TSX Premium 11 Redundant TCP-IP connections 2
3
Inter-sites architecture
Central site Monsin RT & DEV XL Web Client TCP-IP RT L Web Client 1 Web Client 4 RT L Web Client 1 Web Client 4 TCP-IP TCP-IP La plante Anseremme
4
Typical architecture for dams / locks
Monitor Pro On site runtime On site Web Client Remote Web Client screen 1 screen 2 screen 3 screen 3 Ethernet TCP/IP Ethernet TCP/IP Databases update Modbus Ety 110 CPU PW Ety 210 Scy Ety 110 CPU PW Ety 210 Scy Com FipIO TBX TOR I/O
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.