Download presentation
Presentation is loading. Please wait.
1
Pam Lopker March 2009 1 1
3
Looks of talk about the terrible state of the economy… personally I do not see a problem ..
Problems are a state of mind ..
4
Op Budget ROI Efficiency Training
5
Operating Budget Reduce Operation Cost
6
Reduce Operation Cost Sign of the Times on Earth Business is Down
Restructuring Reduction of Head Count Reviewing all cost
7
On Demand On Demand
8
AMS
9
ROI
10
Focus on after sale service
QAD Service & Support (SSM, MFS, FSS) Vertical Auto CPG EI LS Focus on after sale service Version(s) QAD 2008 onwards retro-fit to eb2.1 Case Study FEI is implementing MFS and FSS to schedule and manage their field service operations (475 engineers, 50+ sites)– Why – Complex and error prone field service management process with a lot of human intervention Payback is 6-12 months .. Deployment On Premise On Demand On Appliance Languages 11 Installs 850+ sites
11
Improve On Time Delivery
QAD Supply Visualization Vertical Auto CPG EI LS Improve On Time Delivery Version(s) 8.5 onwards ERP Agnostic Case Study Invensys needed to improve OTD, while reducing inventory and premium freight Why – OTD was 48%, carrying $19M in inventory, premium freight costs were 5.5% of Sales Payback – realized 20 to 1 payback in Year 1 OTD improved to 91%, 31.8% reduction in inventory, 33% reduction in premium freight Deployment On Demand Languages Any Installs 210 sites
12
Improve Customer Service
QAD Demand Driven Suite Vertical Auto CPG EI LS Improve Customer Service Version(s) All Versions ERP Agnostic Case Study Why – Demand Planning = “one man” process. No visibility or credibility. Customer service declining. System inflexible to market changes in time of expansion. Payback – 3 months had 3% reduction in FG inventory, 10-15% improvement in customer service while double digit sales growth Nampak is currently implementing Inventory Optimization after which it plans to purchase Rough Cut & add more Portal users. Deployment On Demand On Premise Languages English Installs 28 sites
13
Improve Factory Throughput
QAD Enterprise Asset Management Vertical Auto CPG EI LS Improve Factory Throughput Version(s) eB2 onwards ERP Agnostic Case Study Why EAM? - BALL was buying/closing plants to take capacity out of the market. They needed to ensure that the remaining plants could meet & exceed production demand. BALL invested in QAD EAM to drive & delivery an asset reliability strategy! – BALL is now evaluating EAM for other non-QAD Divisions – Fantastic up-selling opportunity! Deployment On Premise Languages 11 Installs 177 sites
14
Supporting Growth QAD Transportation Management (TMS) Vertical
Auto CPG EI LS Supporting Growth Version(s) QAD 7.4 onwards Case Study Manufacturer of high temp ceramic refractory products. Why QAD TMS? ANH’s highly customized TMS legacy system not able to keep up with growing demand. QAD TMS was implemented, then rolled out to 46 sites allowing ANH to standardize processes and increase throughput by 15% to more then 65,000 truckloads annually. ROI < 12 months. Deployment On Premise On Appliance Languages Installs 4200 sites 40 + Parcel Carrier Certifications
15
Usability and Efficiency
Efficiency and Usability
16
Fast, Easy, Simple Input Output Process Navigation Install
The Export to Excel / Import from Excel function for eg. the Adress Maintenance of QAD Enterprise Applications EE allows to easily load adress data from Excel and to Export to Excel for maintenance.
17
Should not need 3rd party products in most cases
Fast, Easy, Simple Input Output Process Navigation Install Train Should not need 3rd party products in most cases
18
Fast, Easy, Simple Input Output Process Navigation Install Train
19
Fast, Easy, Simple Input Output Process Navigation Install Train
20
Fast, Easy, Simple Input Output Process Navigation Install Train
Implementation flows
21
Fast, Easy, Simple Input Output Process Navigation Install Train 21
22
Fast, Easy, Simple Input Output Process Navigation Install Train 22 22
23
Fast, Easy, Simple Input Output Process Navigation Install Train 23 23
24
DEMO Training
25
Fast, Easy, Simple Input Output Process Navigation Install Train 25 25
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.