Download presentation
Presentation is loading. Please wait.
Published byJustina Matthews Modified over 6 years ago
1
Actual Dimensions in the Forward Spectrometer
Bernd Lewandowski GSI Darmstadt Forward Spectrometer FZ Jülich Actual Dimensions in the Forward Spectrometer
2
Fwd Detector: Space for the Subsystems
Changes for the Subsystems in the Forward Spectrometer require changes in the forseen space: Shashlyk EMC Forward Muon Detector Luminosity Monitor Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
3
Shashlyk EMC-Pavel Semenov (TB March 09)
Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
4
Shashlyk EMC-Pavel Semenov (TB March 09)
Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
5
Forward Muon -Gena Alexeev (TB March 09)
Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
6
Forward Muon -Gena Alexeev (TB March 09)
Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
7
Side View TOF DC RICH HCAL EMC LUMI 08. 09. 2009
Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
8
Top View RICH: 1200 DC: 200 TOF: 100 EMC: 1150 HCAL: 1500 LUMI: 2000
Fwd Detector starts at 6050 End of Detector: 13000 Last component: Pump system: 500 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
9
Maintenance for the Forward Spectrometer Access to all subsystems?
Access in the In-Beam position Access in the Off-Beam position Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
10
Shashlyk EMC- A.Levin (MEC 09-09)
Support frame (right part) Supermodule Support frame (left part) Press bar Roller Detector with parted mechanical structure. Front view. Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
11
Shashlyk EMC- A.Levin (MEC 09-09)
Moving from closed position between two neighbour detectors to have access to PMT side of EMC Detector (right part) Detector (left part) Maintenace rails Maintenace rail Concrete block or support platform Main moving platform Maintenance for detector with parted structure. Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
12
Movement of systems on the platform
Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
13
Movement of systems on the platform
Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
14
Possible additional changes are:
Increasement of cut-out for beampipe (might be necessary for Lumi-monitor) Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.