Presentation is loading. Please wait.

Presentation is loading. Please wait.

Relevant Questions… How did we get to this point? Why do we need this?

Similar presentations


Presentation on theme: "Relevant Questions… How did we get to this point? Why do we need this?"— Presentation transcript:

1 USD 363 HOLCOMB SCHOOLS BOND REFERENDUM PUBLIC MEETING OCTOBER 19, 2017

2 Relevant Questions… How did we get to this point? Why do we need this?

3 UNDERSTANDING THE BALLOT QUESTIONS
Each voter will see two (2) ballot questions on their ballot. Each ballot question is independent from the other.

4 Ballot Question #1 Projects Ballot Question #2 Projects
BALLOT QUESTIONS Ballot Question #1 Projects Wiley Elementary School Security Office Remodel Security Cameras Holcomb Elementary School Storm Shelter Addition South Wing HVAC Upgrades Misc. Plumbing and ADA Upgrades Holcomb Middle School HVAC Digital Controls Upgrade Holcomb High School Storm Shelter Addition (Wrestling Room) HVAC Upgrades Ballot Question #2 Projects Holcomb High School MS & HS Locker Room Addition Concession/Restroom Addition Large Classroom/Practice Area MS & HS Site Upgrades

5 BALLOT QUESTION #1 PROJECTS

6 WILEY ELEMENTARY SCHOOL Ballot Question #1
Constructed: 2000 Square Footage: 44,000 s.f. Grade Level: Pre-K thru 2nd Current Student Population: 258 Current Staff Population: 31 PROPOSED BOND PROJECTS: Construct Layered Security Vestibule Entrance Install new security cameras

7 WILEY ENLARGED OFFICE PLAN
SECURITY LAYER 3 EXISTING SECURITY LAYER 1 SECURITY LAYER 2 SECURITY LAYER 1

8 WILEY ELEMENTARY SCHOOL PROJECT COSTS

9 HOLCOMB ELEMENTARY SCHOOL Ballot Question #1
Constructed: 1955, 1970, 1979, 1982, 1987, 1997, 2007, 2013 Square Footage: 85,600 s.f. Grade Level: 3rd thru 5th Current Student Population: 252 Current Staff Population: 30 PROJECTS TO BE COMPLETED: Construct Layered Security Vestibule Entrance Construct FEMA Standards Storm Shelter Install new security cameras South Wing HVAC Upgrades Misc. Plumbing and ADA Upgrades

10 H.E. ENLARGED OFFICE PLAN
EXISTING OFFICE PLAN EXISTING SECURITY LAYER 1 SECURITY LAYER 1 900 S.F. SECURITY LAYER 3 SECURITY LAYER 2 REMODELED OFFICE PLAN

11 STORM SHELTER PLAN SITE & HVAC UPGRADE LOCATIONS
HVAC UPGRADE AREA STORM SHELTER LOCATION

12 H.E. ENLARGED STORM SHELTER PLAN
FEMA RATED DOOR 2,000 S.F. 276 S.F. STORM SHUTTERS FEMA RATED DOOR STORM SHELTER PLAN

13 HOLCOMB ELEMENTARY SCHOOL PROJECT COSTS

14 HOLCOMB MIDDLE SCHOOL Ballot Question #1
Constructed: 1992, 2000 Square Footage: 72,000 s.f. Grade Level: 6th thru 8th Current Student Population: 214 Current Staff Population: 31 PROJECTS TO BE COMPLETED: Construct Layered Security Vestibule Entrance Upgrade HVAC Controls

15 H.M.S. ENLARGED OFFICE PLAN
SECURITY LAYER 2 285 S.F. SECURITY LAYER 3 SECURITY LAYER 1 EXISTING SECURITY LAYER 1 EXISTING OFFICE PLAN REMODELED OFFICE PLAN

16 HOLCOMB MIDDLE SCHOOL PROJECT COSTS

17 HOLCOMB HIGH SCHOOL Ballot Question #1
Constructed: 1980, 2001 Square Footage: 152,000 s.f. Grade Level: 9th thru 12th Current Student Population: 281 Current Staff Population: 31 PROJECTS TO BE COMPLETED: Construct layered Security Vestibule Entrance Storm Shelter Addition (Wrestling Room) Install New Security Cameras HVAC Upgrades

18 H.H.S. ENLARGED OFFICE PLAN (EXISTING PLAN)
CURRENT OFFICE EXISTING SECURITY LAYER 1 EXISTING OFFICE PLAN

19 H.H.S. ENLARGED OFFICE PLAN (REMODELED PLAN)
415 S.F. 1,745 S.F. SECURITY LAYER 3 2,800 S.F. SECURITY LAYER 2 REMODELED OFFICE PLAN SECURITY LAYER 1

20 H.H.S. STORM SHELTER PLAN 415 S.F. STORM SHELTER PLAN (WRESTLING ROOM)

21 HOLCOMB HIGH SCHOOL PROJECT COST TOTALS

22 BALLOT QUESTION #2 PROJECTS

23 HOLCOMB HIGH SCHOOL Ballot Question #2
Constructed: N/A Square Footage: 14,500 s.f. Grade Level: 7th thru 12th PROJECTS TO BE COMPLETED: New Football/Track Concessions New Football/Track Restrooms New MS & HS Football Locker Rooms Large District-Wide Classroom Associated Site Work

24 H.H.S. FOOTBALL CONCESSION & RESTROOMS SITE
Demolish Tennis Courts, Street, and Parking

25 H.H.S. FOOTBALL CONCESSION & RESTROOMS SITE
Extended Street and New Parking

26 H.H.S. FOOTBALL CONCESSION & RESTROOMS

27 HOLCOMB HIGH SCHOOL BALLOT QUESTION #2 PROJECT COST TOTALS

28 BALLOT QUESTION #1 & #2 PROJECT COST TOTALS

29 HOW MUCH WILL THIS COST YOU?


Download ppt "Relevant Questions… How did we get to this point? Why do we need this?"

Similar presentations


Ads by Google