Download presentation
Presentation is loading. Please wait.
1
PC_SBE_09 WCDMA OSS Analysis
Project hammer CBO multi tech 3g oss ANALYSIS © Ericsson AB 2016
2
PC_SBE_09 WCDMA OSS Analysis
OSS KPI OVERVIEW CBO OSS KPIS No KPI WEEKLY AVERAGE BOUNCING BUSY HOUR WEEKLY AVERAGE Target Baseline(7/18/2016-7/24/2016) Result(9/20/2016-9/26/2016) PASS/FAIL Baseline Result Result Date Remark A 2G CSSR >=99.00% 99.48 99.46 FAIL >=98.5% NA A 2G TCH Dropped Rate >=0.55% 0.44 0.52 >=0.65% A 2G SDCCH Blocked Rate <=1.5% 0.03 0.01 PASS >=1.75% Result(8/21/2016-8/27/2016) A 3G Voice CSSR >=99.0% 99.82 99.84 >=98.0% 100.00 99.78 A 3G Voice DCR <=0.55% 0.46 0.43 <=0.65% 0.90 0.67 A 3G PS CSSR 99.83 99.80 99.70 99.49 A 3G PS DCR <=0.6% 0.74 <=0.7% 0.68 0.72 A LTE eRAB CSSR >=98.% A LTE eRAB DCR © Ericsson AB 2016
3
3G PS CSSR JUSTIFICATION
PC_SBE_09 WCDMA OSS Analysis 3G PS CSSR JUSTIFICATION PS CSSR trend belongs to the normal fluctuation and can meet the CSSR hard target 99.00%, The worst cell caused by site RW10645_UMSKGE: © Ericsson AB 2016
4
PC_SBE_09 WCDMA OSS Analysis
3G worst cell PS CSSR failed due to cells listed as below: RW10645_UMSKGE : Site with frequently alarm all the time, which affect the overall cluster KPI. This site was not under modernization activities but inside SBE_09 cluster. Alarm had been cleared already, and keep monitoring. © Ericsson AB 2016
5
PC_SBE_09 WCDMA OSS Analysis
© Ericsson AB 2016
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.