1 Green Infrastructure Operations & Maintenance Survey 2017
ISWEP Green Infrastructure Operations & Maintenance Survey 2017

2 Research

3 Survey Communities City State Population 51,818 Oak Lawn Village IL
La Crosse WI 51,818 Oak Lawn Village IL 55,245 Elryia OH 55,953 Burnsville MN 60,220 Bloomington IN 69,291 St. Joseph MO 73,990 Schaumburg Village 75,386 Hammond 83,058 Rochester 85,806 Duluth 86,918 Fargo ND 90,599 Elgin 94,487 Green Bay 102,313 Joliet 106,221 Ann Arbor MI 114,214 Aurora 142,990 Dayton 166,179 Grand Rapids 196,445 Fort Wayne 205,175 Lincoln NE 225,581 Minneapolis 382,603 Omaha 390,007 Kansas City 481,420 Milwaukee 596,974 Survey Communities

4 O & M Survey Questions Background Funding Dedicated Personnel
Practices & Ownership At what point is scale reached (# of practices needed where cost becomes affordable*) Funding Where does it originate How much is allocated to Inspection, Maintenance and/or Both Dedicated Personnel Municipality Contractor Volunteers Other / Combination Inspection & Maintenance Responsibilities Forms Maintenance Agreements

5 What [where] is Scale? At what point is scale reached (# of practices needed where cost becomes affordable*) For example 1,000 sf permeable pavement versus 43,560 sf permeable pavement 5,000 sf bioswale versus 15,000 sf bioswale 1,000 acres of turf mowed reduced to 100 acres turf mowed Cost savings reallocated to GI inspection & maintenance Survey responses will help determine the tipping point For comparative purposes turning to a respected industry resource for engineering cost estimates.

6 R.S. Means Data, 2016 World’s leading provider of construction cost data, software, and services for all phases of the construction lifecycle. Provides accurate and up-to-date cost information to help owners, developers, architects, engineers, contractors and others carefully and precisely project and control the cost of both new building construction and renovation projects.  City cost indexes Productivity rates Crew composition Contractor's overhead and profit rates It is a data standard for government work in terms of pricing, and is widely used by the industry as a whole.

7 Division 32 01 Operations and Maintenance of Exterior Improvements
Gathered daily output / cost data for: Sweeping [permeable pavement] Weeding / Litter pick-up Cleaning Brush / Fall Clean-Up Lawn Maintenance [mowing]

8 SWEEPING [permeable pavement]
Maintenance DO LH Measure Total Output per hour Daily Cost Cost Per Unit Sidewalk, brick pavers, steam cleaning 950 0.008 SF 119 $684.00 $0.72 Sweep walk by hand 15 0.533 MSF 15000 1,875 $495.00 $0.03 Sweep walk, power vacuum 100 0.8 100000 12,500 $496.00 $0.0050 Sweep, drives & parking areas with power vacuum 120 0.067 120,000 15,000 $495.60 $0.0041

9 WEEDING / LITTER PICK-UP
Maintenance DO LH Measure Total Output per hour Daily Cost Cost Per Unit Weed Mulched Bed 20 0.4 MSF 20,000 2,500 $ $ 0.03 Weed unmulched bed 8 1 8,000 1,000 $ $ 0.06 Litter Pick-up 300 0.27 300,000 37,500 $495.00 $

10 CLEANING BRUSH / FALL CLEAN-UP
Maintenance DO LH Measure Total Output per hour Daily Cost Cost Per Unit Cleaning brush with brush saw and rake. 565 0.014 SY 71 $ $ 7.04 Cleaning brush, by hand 8 1 MSF 8,000 35 $ $ 14.16 Fall Clean-Up 1,000 125 $ $ 0.50

11 LAWN MAINTENANCE [mowing]
DO LH Measure Total Output per hour Daily Cost Cost Per Unit Lawn Mowing, Power Mower - 18" to 22" wide 65 0.123 MSF 65,000 8,125 $ $