Presentation is loading. Please wait.

Presentation is loading. Please wait.

Extraneous Solutions and Work Problems.

Similar presentations


Presentation on theme: "Extraneous Solutions and Work Problems."โ€” Presentation transcript:

1 Extraneous Solutions and Work Problems

2 Watch out for extraneous solutions!
Solve: 6 ๐‘ฅโˆ’3 = 8 ๐‘ฅ 2 ๐‘ฅ 2 โˆ’9 โˆ’ 4๐‘ฅ ๐‘ฅ+3 Watch out for extraneous solutions!

3 Solve: ๐‘ฅ ๐‘ฅโˆ’2 + 2 ๐‘ฅโˆ’4 = 4๐‘ฅโˆ’12 ๐‘ฅ 2 โˆ’6๐‘ฅ+8 ๐๐จ ๐ฌ๐จ๐ฅ๐ฎ๐ญ๐ข๐จ๐ง:๐›๐จ๐ญ๐ก ๐’™=๐Ÿ ๐š๐ง๐ ๐’™=๐Ÿ’ ๐š๐ซ๐ž ๐ž๐ฑ๐ญ๐ซ๐š๐ง๐ž๐จ๐ฎ๐ฌ ๐ฌ๐จ๐ฅ๐ฎ๐ญ๐ข๐จ๐ง๐ฌ

4 Paul can complete an inventory for his job in 2 hours
Paul can complete an inventory for his job in 2 hours. Alicia can complete the same inventory in 3 hours. How long will they take to complete the same inventory if they work together? ๐Ÿ.๐Ÿ ๐ก๐จ๐ฎ๐ซ๐ฌ ๐จ๐ซ ๐Ÿ ๐ก๐จ๐ฎ๐ซ ๐š๐ง๐ ๐Ÿ๐Ÿ ๐ฆ๐ข๐ง๐ฎ๐ญ๐ž๐ฌ

5 Adam takes 30 minutes more than Kyra to clean the garage
Adam takes 30 minutes more than Kyra to clean the garage. Last time they worked together and it took them 20 minutes to finish the cleaning. How long would each of them take working by themselves? ๐€๐๐š๐ฆ ๐ฐ๐จ๐ฎ๐ฅ๐ ๐ญ๐š๐ค๐ž ๐Ÿ”๐ŸŽ ๐ฆ๐ข๐ง๐ฎ๐ญ๐ž๐ฌ ๐Š๐ฒ๐ซ๐š ๐ฐ๐จ๐ฎ๐ฅ๐ ๐ญ๐š๐ค๐ž ๐Ÿ‘๐ŸŽ ๐ฆ๐ข๐ง๐ฎ๐ญ๐ž๐ฌ

6 One garden hose can fill a small above-ground swimming pool in 10 hours. A second larger hose can fill the pool twice as fast as the first one. If both hoses are used to fill the pool, how many hours will it take? ๐Ÿ” ๐Ÿ ๐Ÿ‘ ๐ก๐จ๐ฎ๐ซ๐ฌ ๐จ๐ซ ๐Ÿ” ๐ก๐จ๐ฎ๐ซ ๐š๐ง๐ ๐Ÿ’๐ŸŽ ๐ฆ๐ข๐ง๐ฎ๐ญ๐ž๐ฌ


Download ppt "Extraneous Solutions and Work Problems."

Similar presentations


Ads by Google