Inspector(s): Devin Simmons and Ben White ODOT R1 Biologists
KN17983 I-5 Hood Ave Seismic I-5 Tualatin River Site Inspection 9/23/2015 Inspector(s): Devin Simmons and Ben White ODOT R1 Biologists
2
New WQ Facility The KN17983 FAHP ESA project notification included voluntary treatment of 0.35 acres of impervious surface. Committed 0.35 acres as mitigation for KN17701 OR99W Fischer Rd. The 9/24/site inspection suggests that the facility was not constructed to design or intent
3
Clockwise lower left to upper right: #1. Discharge location. #2
Clockwise lower left to upper right: #1. Discharge location. #2. Looking south through facility. Note that the facility appears to be incorrectly graded creating an increased grade through the site. #3. Note that the reverse grade compounded with the addition of a breech and drainage ditch does not appear to meet the design or intent.
4
Counterclockwise lower left to upper right: #1 facility breech and ditch. #2 Ditch leads to pipe with direct discharge to the Tualatin River. Note trail construction debris. Pipe passes beneath trail under construction. #3 Trail currently under construction. The river is downslope to the left.
5
Solution 9/29/ Devin Simmons (Bio), Melissa Hogan (REC), and Jose Villalpando (Construction) conducted a follow-up site visit to the SW quadrant of the I-5 Tualatin River Bridge. Jose confirmed that the site had been built to design and the feature was later breached. Jose stated that he site would be repaired. Jose on 9/30 verified that the breach was due to misguided efforts by the adjacent and unassociated local agency trail project.