1
ROBOX modification plans
HF ECR follow up Nov 29,2010 Ianos Schmidt
2
Design plan Slice test box Sleeve material selection
Optical/mechanical mock up Test light guide coupling Test sleeve performance Test PMT shielding, support, grounding, noise… Define cabling interfaces Validate/update CAD of box components Produce a new plate 2 Plate 3 design Sleeve/optical Coupling design Produce proto plate 3 Try 2? Design parts for PPP Try 2? PPP Testing Electrical optical Test beam? Magnet field test Plate 2 decision Modify / produce from scratch Make from scratch P5 modification/assembly Produce parts Installation / commissioning
3
Replaces eight lowest eta PMT’s with Hamamatsu R7600U-200-M4 PMT’s
Slice test readout box Replaces eight lowest eta PMT’s with Hamamatsu R7600U-200-M4 PMT’s Existing “plate 2” Existing PMT shields For 16 standard HF PMT’s Base board for new PMT’s: Conventional resistive bases provides“Reference” signals for QIE Ground connections to shields Safety ground “Mini Plate 2” New PMT shields
4
Slice box assembly cross-section for R7600U PMT’s
Shield Ground strap Base board Plate II PMT Kapton insulator “Iron” shield ~17mm PMT to light guide Optical coupling (“sleeve”) Plate I Light guide mirror Light guide assembly (part of wedge)
5
R7600U PMT’s and base board
6
Slice test box with new shields and base board
7
Box tested in BAT904 Test setup: Slice box
HF front end crate + Calibration Unit HF LASER/LED light distribution fibers and CLI HF front end cables HF HV supply + CAEN supply HV adapter cable, later installed in USC TESTS: Laser/LED Channel mapping verification HV mapping Gain/single PE CAEN HV supply test HV cable adapter test Pedestal and light tightness HF ROB test unit Simulates calibration light distribution of HF wedge * Big thanks to Halil Saka for his work in 904
8
Location of new PMT’s IPHI 67
Covered PMT (IETA 29, short) New PMT’s are located on HF+ at IPHI 67 and cover towers IETA 29 to IETA 32
9
Slice box installed on HF+ IPHI 67
10
HF+ IPHI 3 light guide mirrors replaced
AFTER BEFORE
11
Sleeves in IPHI 3, IETA 29 TEFLON Mirror TYVEK
“Telescopic” Sleeve made of 3M radiant mirror film (“HEM”). Non conductive. TEFLON IETA 29S Mirror Light guide tube TYVEK IETA 29L In HF+ IPHI 3 all mirrors were replaced with standard “German Mylar”. HEM sleeves were installed everywhere except IETA 29S and IETA 29L which have Teflon and Tyvec sleeves respectively.
12
Single PMT mock up. Mechanically and Optically identical to a single channel of a HF ROB. For study of PMT insulation, support, shielding, electrical and optical coupling. Ianos Schmidt. Oct. 11,2010
13
Single PMT mock up Three sets of components were produced.
One for Iowa lab for sleeve design and testing One for Mechanical design evaluation One for testing at CERN (Sources, testbeam …) HF “backplane” Plate 1 Plate 2 Shield Light guide Mirror & sleeve
14
Single PMT mockup
15
Box design Design of new box components started. Initial pass on mechanical features effecting base board design was provided to Sergey for prototype production. Some concerns about the strength of grade XX Garolite for plate 2’s. - No longet entertain possibility to modify existing plate 2’s.
16
Work space estimates at CERN
Box assembly area ~12m^2 (P5) Box test area ~12m^2 (P5) Box storage area ~5m^2 (P5) Cable prep area ~14m^2 (at CERN) Cable storage ~5m^2 (P5) Workspace needed at P5 24m^2 Storage at needed at P5 10m^2 Cable prep area (CERN) 14m^2 TOTAL 48m^2